Tender Value
Refer Docs
Closing Date
25 Dec 2023, 3:00 pmClosed
PR & CC
SUPPLY INSTALLATION, TRANSPORTATION OF HIGH MAST AT WZ AND CZ
2300008459-HD-09050
5100008459
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
25 Dec 2023
4 Dec 2023
25 Dec 2023
25 Dec 2023
5 Dec 2023 - 15 Dec 2023
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | FAB AND SPLY OF 22m | FAB AND SPLY OF 22m — "DESIGN, FABRICATION, TESTING, PACKING OF HIGH MAST FORRETAIL OUTLETS UNDER SPECIFIED LOCATION BY HPCL EIC.FABRICATION SHALL BE AS P DRAWINGS/SPECIFICATIONS ASMENTIONED IN THE TENDER. THE SCOPE OF JOB INCLUDESPROVISION OF ONE STANDARD LIGHTNING ARRESTOR AND TOW N BEROF EARTH PITS HAVING PLATE ELECTRODES. THE COST OF THESEARE TO BE INCLUDED IN HIGH MAST SIGNAGE WHILE QUOTING.INSPECTION AND TEST G HIGH MAST POLE: 1.DETAIL OFINSPECTION/TEST TO BE CONDUCTED: MECHANICAL & CHEMICALPROPERTIES ACCEPTANCE CRITERIA: MANUFACTURER’S T TCERTIFICATE FORMAT OF RECORD: MATERIAL INSPECTION REPORTSCOPE OF INSPECTION BY 3RD PARTY/HPCL: REVIEW 2.DETAIL OFINSPECTION/TEST T BE CONDUCTED: MECHANICAL PROPERTIESACCEPTANCE CRITERIA: SAMPLE FORMAT OF RECORD: INSPECTIONREPORT SCOPE OF INSPECTION BY 3RD PARTY/H L: REVIEW &WITNESS 3.DETAIL OF INSPECTION/TEST TO BE CONDUCTED:DIMENSIONAL CHECK ACCEPTANCE CRITERIA: AS PER DRAWINGFORMAT OF RECOR INSPECTION REPORT SCOPE OF INSPECTION BY3RD PARTY/HPCL: WITNESS & RECORD 4.DETAIL OFINSPECTION/TEST TO BE CONDUCTED: NO. OF SIDES CEPTANCECRITERIA: TWENTY FORMAT OF RECORD: INSPECTION REPORT SCOPEOF INSPECTION BY 3RD PARTY/HPCL: WITNESS & RECORD 5.DETAILOF INSP TION/TEST TO BE CONDUCTED: WIDTH OF SIDESACCEPTANCE CRITERIA: SHOULD NOT DIFFER MORE THAN 2 MMFORMAT OF RECORD: INSPECTION REPORT SC E OF INSPECTION BY3RD PARTY/HPCL: WITNESS & RECORD 6.DETAIL OFINSPECTION/TEST TO BE CONDUCTED: WELDING PROCESS ACCEPTANCECRITERIA: E LONGITUDINAL WELD AS PER TENDER TERMS FORMATOF RECORD: INSPECTION REPORT SCOPE OF INSPECTION BY 3RDPARTY/HPCL: WITNESS & RECORD 7 ETAIL OF INSPECTION/TESTTO BE CONDUCTED: WELDING GEOMATRY ACCEPTANCE CRITERIA: ONELONGITUDINAL WELD AS PER TENDER TERMS SCOPE OF INS CTIONBY 3RD PARTY/HPCL: WITNESS & RECORD 8.DETAIL OFINSPECTION/TEST TO BE CONDUCTED: GALVANIZATION CHECKACCEPTANCE CRITERIA: BS EN O 1461 SCOPE OF INSPECTION BY3RD PARTY/HPCL: WITNESS & RECORD INSPECTION AND TESTINGFOR SIGNAGE MOUNTING BRACKET1.DETAIL OF INSPEC ON/TEST TOBE CONDUCTED: GALVANIZATION CHECK ACCEPTANCE CRITERIA: BSEN ISO 1461 FORMAT OF RECORD: INSPECTION REPORT SCOPE OFINSPECT N BY 3RD PARTY/HPCL: WITNESS 2. DETAIL OFINSPECTION/TEST TO BE CONDUCTED: DIMENSIONAL CHECKACCEPTANCE CRITERIA: AS PER DRAWING FORM OF RECORD:INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL:WITNESS INSPECTION AND TESTING FOR FOUNDATIONBOLT 1.DETAIL OF NSPECTION/TEST TO BE CONDUCTED:MECHANICAL PROPERTIES ACCEPTANCE CRITERIA: AS PER DRAWINGONE SAMPLE PER RO TO BE TESTED FORMAT OF REC D: INSPECTIONREPORTSCOPE OF INSPECTION BY 3RD PARTY/HPCL: WITNESS &REVIEW 2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED:DIMENSIONAL ECK ACCEPTANCE CRITERIA: AS PER DRAWINGFORMAT OF RECORD: INSPECTION REPORT SCOPE OF INSPECTION BY3RD PARTY/HPCL: WITNESS INSPECTIO AND TESTING FORSIGNAGE 1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED:SUBSTRATE ACCEPTANCE CRITERIA: MAKE, PURCHASE INVOICE,THICKNESS ORMAT OF RECORD: INSPECTION REPORT SCOPE OFINSPECT" | - | Each |
| 2 | CONST FOUNDATION OF HIGH MPLP-CVR PURCHASE PLANT | CONST FOUNDATION OF HIGH MPLP-CVR PURCHASE PLANT — OVIDING FOUNDATION FOR HIGH MAST AT ADVISED RETAILOUTLETS USING RCC M20. VENDOR TO CAST THE FOUNDATION AS PERTHE DRAWING ATTACHED AN ALSO TO SUPPLY THE FOUNDATIONBOLTS. THIRD PARTY INSPECTION (TPI) OF BOLTS TO BE ARRANGED& PAID BY HPCL. COST OF TPI NOT TO BE INCLUD IN OFFER.THE FOUNDATION TO BE CASTED WELL IN ADVANCE BEFOREINSTALLATION OF HIGH MAST. | - | Each |
| 3 | INSTLN AND COMMNG OF | INSTLN AND COMMNG OF — ECTING, INSTALLATION AND COMMISSIONING OF HIGH MAST /ANCILLARIES. RATE INCLUDES HOISTING, LAUNCHING, TOOLS,TACKLES, MACHINERY, JIGS, CAFFOLDING, FRAMEWORK ETC. ALLNEEDED FOR ERECTION. CARE SHALL BE TAKEN TO NOT TO DISTURBOUTLET OPERATION AND TO ENSURE NO DAMAGE TO E HIGH MASTOR OUTLET FACILITIES. ALL SAFETY MEASURES SHALL BE TAKENWHILE ERECTION. SCOPE INCLUDES UNPACKING AND CONNECTION OFEARTHIN WITH HIGH MAST TO EARTH PITS COST QUOTED TOINLCUDE THE SAME. | - | Each |
| 4 | TRANSPT OF HIGH MAST 22 M MPLP-CVR PURCHASE PLANT | TRANSPT OF HIGH MAST 22 M MPLP-CVR PURCHASE PLANT — SURANCE, LOADING, TRANSPORTATION, UNLOADING AND STACKINGOF HIGH MAST AT RETAIL OUTLETS OR AS ADVISED BY THE REGIONS. MAHARASHTRA 17 METER Manadatory: No | - | Each |
| 1 | FAB AND SPLY OF HIGH MAST MHLP-CVR PURCHASE PLANT | FAB AND SPLY OF HIGH MAST MHLP-CVR PURCHASE PLANT — ESIGN, FABRICATION, TESTING, PACKING OF HIGH MAST FOR RETAIL OUTLETS UNDER SPECIFIED LOCATION BY HPCL EIC. FABRICATION SHALL BE AS P DRAWINGS/SPECIFICATIONS AS MENTIONED IN THE TENDER. THE SCOPE OF JOB INCLUDES PROVISION OF ONE STANDARD LIGHTNING ARRESTOR AND TOW MBER OF EARTH PITS HAVING PLATE ELECTRODES. THE COST OF THESE ARE TO BE INCLUDED IN HIGH MAST SIGNAGE WHILE QUOTING. INSPECTION AND STING HIGH MAST POLE: 1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL & CHEMICAL PROPERTIES ACCEPTANCE CRITERIA : MANUFACTU R?S TEST CERTIFICATE FORMAT OF RECORD : MATERIAL INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : REVIEW 2.DETAIL OF INSPEC ON/TEST TO BE CONDUCTED : MECHANICAL PROPERTIES ACCEPTANCE CRITERIA : SAMPLE FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTIO BY 3RD PARTY/HPCL : REVIEW & WITNESS 3.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DR ING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD 4.DETAIL OF INSPECTION/ TEST TO BE ONDUCTED : NO. OF SIDES ACCEPTANCE CRITERIA : TWENTY FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WI ESS & RECORD 5.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WIDTH OF SIDES ACCEPTANCE CRITERIA : SHOULD NOT DIFFER MORE THAN 2 MM FOR T OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD 6.DETAIL OF INSPECTION/TEST TO BE CONDUCTED WELDING PROCESS ACCEPTANCE CRITERIA : ONE LONGITUDINAL WELD AS PER TENDER TERMS FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPE ION BY 3RD PARTY/HPCL : WITNESS & RECORD 7.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WELDING GEOMATRY ACCEPTANCE CRITERIA : ONE LO ITUDINAL WELD AS PER TENDER TERMS SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD 8.DETAIL OF INSPECTION/TEST TO BE CONDUCT : GALVANIZATION CHECK ACCEPTANCE CRITERIA : BS EN ISO 1461 SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD INSPECTION AND STING FOR SIGNAGE MOUNTING BRACKET 1. DETAIL OF INSPECTION/TEST TO BE CONDUCTED : GALVANIZATION CHECK ACCEPTANCE CRITERIA : BS EN IS 1461 FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS 2 .DETAIL OF INSPECTION/TEST TO BE CONDUCT : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL WITNESS INSPECTION AND TESTING FOR FOUNDATION BOLT 1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL PROPERTIES ACCEPTANCE C TERIA : AS PER DRAWING ONE SAMPLE PER RO TO BE TESTED FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : W NESS & REVIEW 2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS INSPECTION AND TESTING FOR SIGNAGE 1.DETAIL OF INSPECTION/TEST TO CONDUCTED :SUBSTRATE ACCEPTANCE CRITERIA :MAKE, PURCHASE INVOICE, THICKNESS FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION Y 3RD PARTY/HPCL :WITNESS 2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :REFLECTIVE SHEETING ACCEPTANCE CRITERIA :PURCHASE INVOICE, LO CERTIFICATE, WARRANTEE CERTIFICATE. FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS 3.DETAIL OF I PECTION/TEST TO BE CONDUCTED :OVERLAY ACCEPTANCE CRITERIA :PURCHASE INVOICE LOT CERTIFICATE WARRANTEE CERTIFICATE FORMAT OF RECORD : SPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/ HPCL :WITNESS 4.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :APPLICATION ACCEPTANCE ITERIA :AS PER MANUFACTURER?S RECOMMENDATION FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS 5.DE IL OF INSPECTION/TEST TO BE CONDUCTED :DIMENSIONAL CHECK ACCEPTANCE CRITERIA :AS PER DRAWING TESTING PROCEDURE SHALL BE AS MENTIONE IN THE TENDER. " | - | Each |
| 2 | CONST FOUNDATION OF HIGH MHLP-CVR PURCHASE PLANT | CONST FOUNDATION OF HIGH MHLP-CVR PURCHASE PLANT — OVIDING FOUNDATION FOR HIGH MAST AT ADVISED RETAIL OUTLETS USING RCC M20. VENDOR TO CAST THE FOUNDATION AS PER THE DRAWING ATTACHED D ALSO TO SUPPLY THE FOUNDATION BOLTS. THIRD PARTY INSPECTION (TPI) OF BOLTS TO BE ARRANGED & PAID BY HPCL. COST OF TPI NOT TO BE IN UDED IN OFFER. THE FOUNDATION TO BE CASTED WELL IN ADVANCE BEFORE INSTALLATION OF HIGH MAST. | - | Each |
| 3 | INSTLN AND COMMNG OF | INSTLN AND COMMNG OF — ECTING, INSTALLATION AND COMMISSIONING OF HIGH MAST / ANCILLARIES. RATE INCLUDES HOISTING, LAUNCHING, TOOLS, TACKLES, MACHINERY, JIG SCAFFOLDING, FRAMEWORK ETC. ALL NEEDED FOR ERECTION. CARE SHALL BE TAKEN TO NOT TO DISTURB OUTLET OPERATION AND TO ENSURE NO DAMAGE O THE HIGH MAST OR OUTLET FACILITIES. ALL SAFETY MEASURES SHALL BE TAKEN WHILE ERECTION. SCOPE INCLUDES UNPACKING AND CONNECTION OF RTHING WITH HIGH MAST TO EARTH PITS COST QUOTED TO INLCUDE THE SAME. | - | Each |
| 4 | TRANSPT OF HIGH MAST for | TRANSPT OF HIGH MAST for — SURANCE, LOADING, TRANSPORTATION, UNLOADING AND STACKING OF HIGH MAST AT RETAIL OUTLETS OR AS ADVISED BY THE REGIONS. CHATTISGARH 22 METER Manadatory: No | - | Each |
| 1 | FAB AND SPLY OF 22m | FAB AND SPLY OF 22m — "DESIGN, FABRICATION, TESTING, PACKING OF HIGH MAST FORRETAIL OUTLETS UNDER SPECIFIED LOCATION BY HPCL EIC.FABRICATION SHALL BE AS P DRAWINGS/SPECIFICATIONS ASMENTIONED IN THE TENDER. THE SCOPE OF JOB INCLUDESPROVISION OF ONE STANDARD LIGHTNING ARRESTOR AND TOW N BEROF EARTH PITS HAVING PLATE ELECTRODES. THE COST OF THESEARE TO BE INCLUDED IN HIGH MAST SIGNAGE WHILE QUOTING.INSPECTION AND TEST G HIGH MAST POLE: 1.DETAIL OFINSPECTION/TEST TO BE CONDUCTED: MECHANICAL & CHEMICALPROPERTIES ACCEPTANCE CRITERIA: MANUFACTURER’S T TCERTIFICATE FORMAT OF RECORD: MATERIAL INSPECTION REPORTSCOPE OF INSPECTION BY 3RD PARTY/HPCL: REVIEW 2.DETAIL OFINSPECTION/TEST T BE CONDUCTED: MECHANICAL PROPERTIESACCEPTANCE CRITERIA: SAMPLE FORMAT OF RECORD: INSPECTIONREPORT SCOPE OF INSPECTION BY 3RD PARTY/H L: REVIEW &WITNESS 3.DETAIL OF INSPECTION/TEST TO BE CONDUCTED:DIMENSIONAL CHECK ACCEPTANCE CRITERIA: AS PER DRAWINGFORMAT OF RECOR INSPECTION REPORT SCOPE OF INSPECTION BY3RD PARTY/HPCL: WITNESS & RECORD 4.DETAIL OFINSPECTION/TEST TO BE CONDUCTED: NO. OF SIDES CEPTANCECRITERIA: TWENTY FORMAT OF RECORD: INSPECTION REPORT SCOPEOF INSPECTION BY 3RD PARTY/HPCL: WITNESS & RECORD 5.DETAILOF INSP TION/TEST TO BE CONDUCTED: WIDTH OF SIDESACCEPTANCE CRITERIA: SHOULD NOT DIFFER MORE THAN 2 MMFORMAT OF RECORD: INSPECTION REPORT SC E OF INSPECTION BY3RD PARTY/HPCL: WITNESS & RECORD 6.DETAIL OFINSPECTION/TEST TO BE CONDUCTED: WELDING PROCESS ACCEPTANCECRITERIA: E LONGITUDINAL WELD AS PER TENDER TERMS FORMATOF RECORD: INSPECTION REPORT SCOPE OF INSPECTION BY 3RDPARTY/HPCL: WITNESS & RECORD 7 ETAIL OF INSPECTION/TESTTO BE CONDUCTED: WELDING GEOMATRY ACCEPTANCE CRITERIA: ONELONGITUDINAL WELD AS PER TENDER TERMS SCOPE OF INS CTIONBY 3RD PARTY/HPCL: WITNESS & RECORD 8.DETAIL OFINSPECTION/TEST TO BE CONDUCTED: GALVANIZATION CHECKACCEPTANCE CRITERIA: BS EN O 1461 SCOPE OF INSPECTION BY3RD PARTY/HPCL: WITNESS & RECORD INSPECTION AND TESTINGFOR SIGNAGE MOUNTING BRACKET1.DETAIL OF INSPEC ON/TEST TOBE CONDUCTED: GALVANIZATION CHECK ACCEPTANCE CRITERIA: BSEN ISO 1461 FORMAT OF RECORD: INSPECTION REPORT SCOPE OFINSPECT N BY 3RD PARTY/HPCL: WITNESS 2. DETAIL OFINSPECTION/TEST TO BE CONDUCTED: DIMENSIONAL CHECKACCEPTANCE CRITERIA: AS PER DRAWING FORM OF RECORD:INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL:WITNESS INSPECTION AND TESTING FOR FOUNDATIONBOLT 1.DETAIL OF NSPECTION/TEST TO BE CONDUCTED:MECHANICAL PROPERTIES ACCEPTANCE CRITERIA: AS PER DRAWINGONE SAMPLE PER RO TO BE TESTED FORMAT OF REC D: INSPECTIONREPORTSCOPE OF INSPECTION BY 3RD PARTY/HPCL: WITNESS &REVIEW 2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED:DIMENSIONAL ECK ACCEPTANCE CRITERIA: AS PER DRAWINGFORMAT OF RECORD: INSPECTION REPORT SCOPE OF INSPECTION BY3RD PARTY/HPCL: WITNESS INSPECTIO AND TESTING FORSIGNAGE 1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED:SUBSTRATE ACCEPTANCE CRITERIA: MAKE, PURCHASE INVOICE,THICKNESS ORMAT OF RECORD: INSPECTION REPORT SCOPE OFINSPECT" | - | Each |
| 2 | CONST FOUNDATION OF HIGH CGLP-CVR PURCHASE PLANT | CONST FOUNDATION OF HIGH CGLP-CVR PURCHASE PLANT — OVIDING FOUNDATION FOR HIGH MAST AT ADVISED RETAILOUTLETS USING RCC M20. VENDOR TO CAST THE FOUNDATION AS PERTHE DRAWING ATTACHED AN ALSO TO SUPPLY THE FOUNDATIONBOLTS. THIRD PARTY INSPECTION (TPI) OF BOLTS TO BE ARRANGED& PAID BY HPCL. COST OF TPI NOT TO BE INCLUD IN OFFER.THE FOUNDATION TO BE CASTED WELL IN ADVANCE BEFOREINSTALLATION OF HIGH MAST. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2300008459-HD-09050.pdf
TENDER_DOCUMENT • 22.14 MB
Download all tender documents and submit your bid