Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹41.8 L
EMD Value
₹83,600
Closing Date
12 Jan 2024, 11:00 amClosed
SO1 (Wks), HQ 26 Sect AR
HQ 26 Sect AR, c/o 99APO
Special repair resurfacing and strengthening of black top road for residential area at KLP Modi Assam Rifles
2023_ARMHA_777740_2
SPR/8048/SRW/2023-24/36
Open Tender
Civil Works
Works
270 days
Modi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
DIG HQ 26 Sector AR
₹83,600
Yes
14 Feb 2024
23 Dec 2023
13 Jan 2024
23 Dec 2023
12 Jan 2024
23 Dec 2023
23 Dec 2023 - 12 Jan 2024
SCHEDULE ‘A’ PART - I (Repair of Road)
Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity.
Supplying and stacking at site 63mm to 45mm size stone aggregate.
Supplying and stacking at site stone screening 13.2 mm nominal size (Type A)
Supplying and stacking at site mooram.
Supply and laying of 4 cm thick bitumastic macadam with hot bitumen of approved quality, using stone chippings (60% with 12.5 mm nominal size and 40% with 10 mm nominal size) @ 2.60 cum per 100 sqm and coarse sand @ 2.60 cum per 100 sqm of road surface and with bitumen @ 56 kg/cum of stone chippings and @ 128 kg/cum of sand over a tack coat with hot straight run bitumen, including consolidation with road roller of 8 to 10 tonne etc. complete with paving Asphalt grade VG - 10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt. (tack coat to be paid separately)
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and booming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, On W.B.M. @ 0.75 Kg /sqm, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, on bituminous surface @ 0.50 Kg/sqm, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.
Providing and applying of 2.5 cm premix carpet surfacing with 2.25 cum and 1.12 cum of stone chippings of 13.2 mm and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc complete (tack coat to be paid for separately).
Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete.
M/S MD INAYAT HUSSAIN
M/S YUMNAM PREMKUMAR SINGH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .