| 1 | L1₹29.5 LAccepted-AOC 54 CHELLATHAI NAGAR MAHILCHI NAGAR PERUMALPURAM TIRUNELVELI DISTRICT | TIRUNELVELI | TAMIL NADU | 627001 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹33.4 L+₹3.9 L (13.1%)Rejected-AOC 17 1 SANKAR COLONY PALAYAMKOTTAI TIRUNELVELI | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹35.8 L+₹6.2 L (21.1%)Rejected-AOC 49B 139B BYE PASS ROAD SALAIPUTHUR KAYATHAR THOOTHUKUDI | L3 | Rejected-AOC REJECTED | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹42 L
EMD Value
₹42,000
Closing Date
17 Feb 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COMMISSIONER TIRUNELVELI CORPORATION
S.N.High road Main office Tirunelveli Corproration
Package 12 Providing B.T.Surface at South Mount Road in ward No27
2025_MAWS_521939_1
23/2024-25/12
Open Tender
Civil Works - Roads
Works
90 days
S.N.High road Mainoffice Tirunelveli Corproration
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹42,000
S.N.High road Main office Tirunelveli Corproration
26 Mar 2025
31 Jan 2025
17 Feb 2025
31 Jan 2025
17 Feb 2025
31 Jan 2025
5 Feb 2025
Amount
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Earth work excavation and deposting on bank with an intial lead of 10m& initial liftm of 2m in hard siff clay , stiff black cotton , hard red earth shales , murram , gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil asper standard specification 20.B including refilling charges
Providing Granular surface base to the required surface using murram, Granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc, complete as per the direction of Departmental officers.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials table 400-13 with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORT&H Specification Rev-5
Providing and laying Prime Coat using emulsion distributor over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction overit, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat using emulsion distributor over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and Laying Tack Coat using emulsion pressure distributor of 2.00 Kgs/10 Sqm over the Exg.BT surface treated with primer using 2.00 kgs of bituminous Emulsion (RS1) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications.
consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of al lmaterials to CMP site ,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uni form thickness of 50mm with paver to the specifi degrades and cross sections and compacted by Vibratory /Pneumatic Rollert othere quired density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous concrete to 40mm/30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Providing and laying of hot applied themoplastic compound 2.5mm thick including reflectorsing glass beads at 250gram/sqm area thickness of 2.5 mm is exclusive of surface applied glass beads as IRC 35.The finished to be level uniform and free from streaks
MARSHAL VIGNESH & CO (BID ID -1250098)
S VELLAPANDI & CO (BID ID -1250942)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .