Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical | Rejected-Technical As per TCR |
Tender Value
₹2.0 L
EMD Value
₹2,500
Closing Date
30 Oct 2025, 10:00 amClosed
J K Gupta
O/o AGM Bina Area, NCL District Sonebhadra U.P. Pincode 231220
Repair Overhaul of 03 nos. Wasp Pumps (Make Wasp Pumps Private Limited, Type Reciprocating pump) installed at HEMM Workshop, Bina Project. (Work to be carried out at contractor site).
2025_NCL_345410_1
Bina/SO(Excv)/Tender/25-26/53 dt 11.10.2025
Open Tender
Excavation Department Work
Item Rate
21 days
Outside Job, Bina Project, NCL
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
25 Jan 2026
11 Oct 2025
31 Oct 2025
12 Oct 2025
30 Oct 2025
12 Oct 2025
12 Oct 2025 - 22 Oct 2025
Amount
Materiasl required- For 03 nos. wasp pump
Gasket for lid (part No. R4313C); 01 no. in each pump
Hex Head bolt (Part No. S156A23); 08 nos. in each pump
Bush Bearing (part No. R4295); 06 nos. in each pump
Oil Seal (part No. R4336A/R4336); 09 nos. in each pump
Rubber cup for plunger (part No. 18922A10); 03 nos. in each pump
Nylon lock nut (part No. S2512A); 03 nos. in each pump
Suction Spring (part No. R4336A); 03 nos. in each pump
Discharge Spring (part No. R4336A1); 03 nos. in each pump
O Ring (ARW-415)(part No. S1926A73); 03 nos. in each pump
O Ring (ARW-411)(part No. R45001A16); 03 nos. in each pump
O Ring for liner (part No. R45001A26); 03 nos. in each pump
O Ring (ARW-205)(part No. 5876A5); 03 nos. in each pump
Liner (part No. R4326B); 03 nos. in each pump
Spring retainer (part No. R4335A); 06 nos. in each pump
Hex Head bolt (Part No. S19109A46); 10 nos. in each pump
Repairing/ grinding/ machining work- For 03 nos. wasp pump
Repairing and grinding of 6 nos. valve seats; 4 hrs for each (24 hours required in each pump)
Repairing and grinding of 3 nos. plunger; 4 hrs for each (12 hours required in each pump)
Repairing of 03 nos. oil seal housing by machining & polishing; 4 hrs. for each (12 hours required in each pump)
Repairing of 03 nos. crank by machining & polishing; 4 hrs. for each (12 hours required in each pump)
Repairing of 03 nos. lining housing by machining & polishing; 4 hrs. for each. (12 hours required in each pump)
Dismentaling and assembling of different pars of the Pump - For 03 nos. wasp pump
Skilled fitter (01 no. X 2 shift X 3 days i.e. 06 manshift-days for each pump)
Semi-Skilled fitter (01 no. X 2 shift X 3 days i.e. 06 manshift-days for each pump)
Applicable contractors profit
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
finance_358072.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 2.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.05 MB
Annexures.pdf
Tender Documents • 0.69 MB
Conditionsofcontract.pdf
Tender Documents • 0.51 MB
ITB.pdf
Tender Documents • 0.26 MB
BOQ_358072.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .