Loading…
Loading…
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
23 Jun 2026, 11:00 am
Er.Karan Mittal, Executive Engineer
O/O The Executive Engineer, Constn Divn. Sirhind
Construction of Multipurpose Hall at DIET, District Fatehgarh Sahib
2026_CEPW_169714_1
07 dated 08.06.2026
Open Tender
Civil Works - Buildings
180 days
Sirhind
Please refer Tender documents.
22 documents required · 22 mandatory
₹10,000
₹3.6 L
Yes
9 Jun 2026
9 Jun 2026
23 Jun 2026
9 Jun 2026
23 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | - | - | 1 |
| 2 | Construction of Multipupose Hall | - | - | - | - | 2 |
| 3 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. Earth filling under fllors with surplus ordinary soil or soil containing gravel or kanker upto 40% excavated from ouside the builing plinth in 15 cm layers including ramming watering and consolidatiing lead upto 30 meters. | 832.63 | Cum | 102.19 | ₹85,086.46 | 3 |
| 4 | Cement concrete 1:5:10 with 40 mm gauge stone ballast. using concrete mixing volumetric type | 68.55 | cum | 4,286.43 | ₹2,93,834.78 | 4 |
| 5 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. (10.16) | 192.28 | Cum | 6,234.5 | ₹11,98,769.66 | 5 |
| 6 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 19.93 | sqm | 221.24 | ₹4,409.31 | 6 |
| 7 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. (11.3 i) | 168.99 | Cum | 6,366.6 | ₹10,75,891.73 | 7 |
| 8 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. (10.21) | 133.32 | Cum | 7,024.63 | ₹9,36,523.67 | 8 |
| 9 | Centring and shuttering for Columns ( Square or Rectangular or plygonal in plain) in superstructure | 519.84 | sqm | 502.52 | ₹2,61,230 | 9 |
| 10 | Centring and shuttering for sides and soffits of beam, beams launchingsgirders bressumers, lintels | 323.28 | sqm | 400.33 | ₹1,29,418.68 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
pwd111.pdf
Tender Documents • 12.80 MB
Conditions.pdf
Additional Documents • 12.80 MB
Drw.pdf
Additional Documents • 12.80 MB
BOQ_345520.xls
BOQ • 0.97 MB
Download all tender documents and submit your bid