Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All docs in order |
| 2 | Accepted-Technical | Accepted-Technical All docs in order |
| 3 | Accepted-Technical | Accepted-Technical All docs in order |
| 4 | Rejected-Technical | Rejected-Technical Failed in Tech Evaluation |
| 5 | Rejected-Technical | Rejected-Technical Failed in Tech Evaluation |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
2 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE AND PM WDSC Banswara
superindent engineers banswara
Construction of Anicut, Anicut Renovation, MPT, ECD block bagidora
2026_WDSC_531469_1
MJSA 2.2 NIT NO 51/2025-26 Block bagidora SE WDSC Banswara
Open Tender
Civil Works
Percentage
Banswara
please refer tender documents
3 documents required · 3 mandatory
₹1,000
SE WDSC BANSWARA
₹2.4 L
Yes
23 Feb 2026
23 Jan 2026
3 Feb 2026
23 Jan 2026
2 Feb 2026
23 Jan 2026
Dagbelling 5 to 7.5 cm deep
Clearance of Jungle and cutting of ordinary vegetation shrubs and bushes
Hard soil mixed with Kankar / boulders, Morrum
Soft / Disintegrated rock
Hard rock without blasting
Cement Concrete 1:3:6 well mixed and laid in position complete including all leads of all construction materials including curing and finishing well graded broken stone aggregate of 20mm size
cement mortar for apron 1;6, 23cm kharanja for thickness
Random rubble stone masonary in cement mortar 1:6 forFoundation and super structure
Cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 12mm HB.
Cement plaster in cement sand mortar 1:4, 25mm thick with curing.
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect for Black Cotton Soil for Corewall and Cutoff Trench
Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required.
Transportation of Black Cotton Soil upto average 5 km lead considering shortest route including Loading, Unloading and Stacking for Corewall and Cutoff Trench
Earth work in rough (borrow area) excavation with JCB or Scraper, for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead of 250 m and lift up to 3m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect.
Dry Stone Pitching 15 to 30 centimeter thick with hammer dressed including all lifts and including supply of stone
Dismelting old cement plaster, skirtin raking out joints and cleaning the surface.
Providing and fixing reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wier) all complete.
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect(Hard soil mixed with Kankar / boulders, Morrum)
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect(Soft/ Disintegrated Rock)
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect(Hard rock without blasting )
Providing of centering & shuttering with steel sheets in RCC for roof, slab, chajja, linten etc. lift upto 4.5m and removing of framework etc.
Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect for Black Cotton / Clay soil Soil for Corewall and Cutoff Trench
Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required.
Watering of earth including cost of carriage of water when source of water is up to 3 km lead
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor)
Dressing of uneven embankment in required profile
Supply of Dhaman grass Seeds
Supply of Ratanjot/Castor Seeds
Sowing of Dhaman grass Seeds in different rows
Sowing of Ratanjot/Castor Seeds in different rows
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Hard soil mixed with kankar and murram
In cement concrete foundation or floor, put 40 mm nominal size stone aggregate (crusher broken)/ brick soil in cement-sand mixture in the ratio of 1 cement : 4 sand : 8 aggregate and crush it, including tamping. (10 a)
Iron work in grills/gates etc. including cutting, mounting and fitting of flat cones, Tees and channels, etc. (63)
Applying enamel paint in 3 layers to give an even shade. Creating an even surface on new work/old work. (82 a)
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_947266.xls
BOQ • 0.33 MB
TD51Bagidora.pdf
Tender Documents • 3.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .