Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
25 May 2026, 6:00 pmClosed
Udyog Vihar, Sriganganagar
OFFICE OF THE REGIONAL MANAGER RIICO, UDYOG VIHAR, SRIGANGANAGAR
Construction of BT to CC Road at Industrial Area Suratgarh, Sriganganagar
2026_RIICO_559088_1
10/2026-27/(A)
Open Tender
Civil Works
180 days
Suratgarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
RIICO LTD.,
₹4.0 L
Yes
26 May 2026
14 May 2026
26 May 2026
15 May 2026
25 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted by rolling so as to achieve minimum dry density as given in Tables 300-1 and 300-2 for embankment construction as per MoRTH Specification Clause 305.3.4 | 76.17 | Cum. | 13 | ₹990.21 |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cumbucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 120 | Cum. | 31 | ₹3,720 |
| 3 | CARRIAGE OF MATERIALS Earth, Sand, Lime, Morrum manure or sludge For 5 Km.The rates are inclusive of loading and unloading. The rates are inclusive of stacking. If stacking is not required, no deduction is to be done. | 180 | Cum. | 125 | ₹22,500 |
| 4 | Less for CARRIAGE OF MATERIALS Earth, Sand, Lime, Morrum manure or sludge For 1 Km.The rates are inclusive of loading and unloading. The rates are inclusive of stacking. If stacking is not required, no deduction is to be done. | 180 | Cum. | 80 | ₹14,400 |
| 5 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 775.6 | Cum. | 2,715 | ₹21,05,754 |
| 6 | Construction of un-reinforced , plain cement concrete pavement M-40 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix
design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, pplying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). | 2,285.25 | P.Cum | 6,300 | ₹1,43,97,075 |
| 7 | Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. | 480 | P. Kg | 77 | ₹36,960 |
| 8 | Granular Sub-Base with Close Graded Material (Table:- 400-1), Plant Mix Method Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means., For Grading II Material | 1,120.2 | Cum. | 1,229 | ₹13,76,725.8 |
| 9 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | 76.17 | Cum. | 100 | ₹7,617 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
TformA.pdf
Tender Documents • 0.19 MB
BOQ_995422.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid