| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 CrAdmitted-Finance | ₹16.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹18.1 CrAdmitted-Finance | ₹18.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹18.9 CrAdmitted-Finance | ₹18.9 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | M.K.Groups L1 | ABHISEK CONTECH (INDIA) PRIVATE LIMITED L2 | SYSTEM HOUSE CORPORATION L3 |
|---|---|---|---|---|---|---|
| 1.00(A) CIVIL WORK | ||||||
| 2.00 | Earth work in excavation in all kinds of soil & disposing the excavated materials within 5 (five) KM ead with all lifts at specified location including loading one end and disposing at other end with supply of all labour, T&P, all taxes, gate entry fees, hire & running charges of all equipments / machineries, etc. complete as per the direction of Engineer-In-Charge(excluding GST). | 17,600 | Each Cum. | - | - | - |
| 3.00 | Filling Sweet sand up to required height including collecting, conveying by private trucks/dumpers within a lead of 40 km (avg.) and all lifts with covering at the top to prevent spillage of sand during transportation, loading at one end & unloading at other end, spreading and laying in layers in foundation trenches & cable trench, watering compacting, dressing, leveling to required height etc. with supply of all labour, materials, T&P, all taxes, royalties, running and hire charges of truck/dumpers including VAT & gate entry fees etc. complete as directed by the Engineer-In-Charge (Excluding GST). | 7,200 | Each Cum. | - | - | - |
| 4.00 | Cement concrete (1:4:8 (1 cement : 4 coarse sand: 8 coarse aggregate) using 40mm & down grade hard granite metal (Crusher Broken) of approved quality including mixing in mixer machine, hoisting, laying, consolidating, curing, centering & shuttering, transportation, etc. complete with supply of all materials, labour, T&P, taxes, tollage, royalties, gate entry fees, hire & running charges of all equipments, cost of cement, etc. all complete as directed by the Engineer-in-charge (Excluding GST). | 2,200 | Each Cum. | - | - | - |
| 5.00 | Cement concrete (1:1½:3) in foundation trenches & culverts, etc. (1 cement : 1½ coarse sand : 3 coarse aggregate) using 20 mm and down graded black granite chips (Crusher Broken) of approved quality including mixing in mixer machine, hoisting, laying, consolidating with vibrator (Needle vibrator as per requirement sizes and plate vibrator as & when required as per site condition) and curing, maintaining proper level & slope, finished smooth to be exposed surface etc. complete with supply of all materials, labour, T&P, taxes, tollage, royalties, gate entry fees all testing, barricading the work site etc. including cost of all materials complete as directed by the Engineer-in-charge. (But excluding cost of binding wire, cost of steel & labour charges for bending & binding of steel & cost of form work) (Excluding GST). | 9,900 | Each Cum. | - | - | - |
| 6.00 | Supply of FE-500 steel ( TATA,VIZAC, SAIL, RINL) confirming to IS-1786 specifications including cutting, straightening, bending, binding & placing the grills in position for RCC culvert & cable trench works including cost of binding wire of 18 to 20 gauge with supply of all materials, labour, transportation, T&P, testing, all taxes, tollage, Port entry fees, VAT, etc. all complete as directed by the Engineer-in-charge. N.B Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid ( Excluding GST) . | 7,920 | Each Qtl. | - | - | - |
| 7.00Providing rigid, smooth, leak proof, centering & shuttering with form works made of ply / steel shutters for R.C.C rafts/culvert roof slab/cable trench wall / pre-cast slab etc. applying polythene & coaltar before concreting, dismantling the same after stripping off period including supply of all materials, labour, T&P, tollage, royalties, Port entry fees, taxes, VAT, transportation, etc. all complete as directed by the Engineer-in-charge ( Excluding GST). | ||||||
| 8.00 | Footing & Foundation | 6,000 | Each Sq. mtr. | - | - | - |
| 9.00 | RCC Wall | 84,000 | Each Sq. mtr. | - | - | - |
| 10.00 | Supply of all labour, material hire & running charges of machieries for horizontal direct drilling across the road of required diameter as per the cable size including supply & laying HDPE pipe of approved qality without disturbuing/damage the road & road berm in different width for laying electric cable as per direction of Engineerr - in- charge ( Excluding GST). | 360 | Each Mtr. | - | - | - |
Tender Value
₹16.2 Cr
EMD Value
₹32.3 L
Closing Date
6 Jan 2020, 4:00 pmClosed
S R BEURA,EE,PED-1,PPT
S R BEURA,EE,PED-1,PPT
Construction of RCC trench for relaying of HT Cables inside Harbour Area
2019_MoS_524471_1
EM/PED-62/2019
Open Tender
Electrical Works
540 days
Paradip
Refer Tender Document and e-TCN
3 documents required · 3 mandatory
₹6,000
Yes
As per Tender Document and e-TCN
₹32.3 L
Yes
Conference Hall,E and M Dept.,PPT
3 Jun 2020
4 Dec 2019
8 Jan 2020
4 Dec 2019
6 Jan 2020
4 Dec 2019
4 Dec 2019 - 18 Dec 2019
20 Dec 2019
Amount
(A) CIVIL WORK
Earth work in excavation in all kinds of soil & disposing the excavated materials within 5 (five) KM ead with all lifts at specified location including loading one end and disposing at other end with supply of all labour, T&P, all taxes, gate entry fees, hire & running charges of all equipments / machineries, etc. complete as per the direction of Engineer-In-Charge(excluding GST).
Filling Sweet sand up to required height including collecting, conveying by private trucks/dumpers within a lead of 40 km (avg.) and all lifts with covering at the top to prevent spillage of sand during transportation, loading at one end & unloading at other end, spreading and laying in layers in foundation trenches & cable trench, watering compacting, dressing, leveling to required height etc. with supply of all labour, materials, T&P, all taxes, royalties, running and hire charges of truck/dumpers including VAT & gate entry fees etc. complete as directed by the Engineer-In-Charge (Excluding GST).
Cement concrete (1:4:8 (1 cement : 4 coarse sand: 8 coarse aggregate) using 40mm & down grade hard granite metal (Crusher Broken) of approved quality including mixing in mixer machine, hoisting, laying, consolidating, curing, centering & shuttering, transportation, etc. complete with supply of all materials, labour, T&P, taxes, tollage, royalties, gate entry fees, hire & running charges of all equipments, cost of cement, etc. all complete as directed by the Engineer-in-charge (Excluding GST).
Cement concrete (1:1½:3) in foundation trenches & culverts, etc. (1 cement : 1½ coarse sand : 3 coarse aggregate) using 20 mm and down graded black granite chips (Crusher Broken) of approved quality including mixing in mixer machine, hoisting, laying, consolidating with vibrator (Needle vibrator as per requirement sizes and plate vibrator as & when required as per site condition) and curing, maintaining proper level & slope, finished smooth to be exposed surface etc. complete with supply of all materials, labour, T&P, taxes, tollage, royalties, gate entry fees all testing, barricading the work site etc. including cost of all materials complete as directed by the Engineer-in-charge. (But excluding cost of binding wire, cost of steel & labour charges for bending & binding of steel & cost of form work) (Excluding GST).
Supply of FE-500 steel ( TATA,VIZAC, SAIL, RINL) confirming to IS-1786 specifications including cutting, straightening, bending, binding & placing the grills in position for RCC culvert & cable trench works including cost of binding wire of 18 to 20 gauge with supply of all materials, labour, transportation, T&P, testing, all taxes, tollage, Port entry fees, VAT, etc. all complete as directed by the Engineer-in-charge. N.B Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid ( Excluding GST) .
Providing rigid, smooth, leak proof, centering & shuttering with form works made of ply / steel shutters for R.C.C rafts/culvert roof slab/cable trench wall / pre-cast slab etc. applying polythene & coaltar before concreting, dismantling the same after stripping off period including supply of all materials, labour, T&P, tollage, royalties, Port entry fees, taxes, VAT, transportation, etc. all complete as directed by the Engineer-in-charge ( Excluding GST).
Footing & Foundation
RCC Wall
Supply of all labour, material hire & running charges of machieries for horizontal direct drilling across the road of required diameter as per the cable size including supply & laying HDPE pipe of approved qality without disturbuing/damage the road & road berm in different width for laying electric cable as per direction of Engineerr - in- charge ( Excluding GST).
Earth work in filling of all kinds of soil with excavated material/ saline sand within 5(five) KM lead from Port quarry including loading one end and unloading another end as per direction mainly two side of newly constructed culvert and cable trench, leveling, dressing, watering, compacting with cost of all labour, taxes, T&P, hire & running charges of all equipments/machineries, Port entry fees, etc. complete as directed by Engineer-in-charge ( excluding GST). NB: Saline sand royality will be paid by the firm.
Carrying, lifting & placing of precast slab with deployment of lifting crane, tractor, hire & running charges of all machineries, fuel, lubricants, operator expenses, manpower, Gate entry fees, loading & unloading both the ends, placing in proper position on cable trench, etc. all complete as per direction of Engineer-in-charge. Precast slab as per the requirement for covering the cable trench of approximate size : 2.2mtr x 0.5mtr x 0.15 mtr).
(B) ELECTRICAL WORK
Retrieval / relaying of old HT cables from the kuchha cable trench by excavating the soil as per direction of Engineer-In-Charge (EIC).
Supply & execution of straight through cable joint as per Scope of Work.
Note: We hereby confirm that the above quoted price is inclusive of all taxes, duties, cess and all other incidentals like transport, insurance etc. excluding GST and a firm landing price at Paradip Port Trust.
ABHISEK CONTECH (INDIA) PRIVATE LIMITED
SYSTEM HOUSE CORPORATION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid