| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.1 CrAccepted-AOC | ₹3.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.9 CrRejected-Finance KUKUHAWA POST GAURABADSHAHPUR JANPAD JAUNPUR | ₹3.9 Cr | L-2 | Rejected-Finance L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | VIJAY KUMAR SINGH L2 | M/S RADHEY MOHAN DUBEY CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in hard soil mixed with boulder for foundation of Protection Wall including all lead & lift with proper completion of work. | 904.55 | Cum | 201.9 ₹1,82,628.65 | 164 ₹1,48,346.2 Lowest |
| 2.00 | Earth work excavation in sand stone, lime stone or other soft rock by pick axex but not required blasting for removing overburden including all lead & lift with disposal of excavated boulder as per the direction of Engineer In Charge. | 4,546 | Cum | 465.9 ₹21,17,981.4 | 173 ₹7,86,458 Lowest |
| 3.00 | Removing Soil mixed with boulder from canal bed which have fallen during overburden removal from right bank up including all lead & lift by truck or tractor trolley or any other power transport with proper completion of work as per the direction of Engineer In Charge | 2,415.54 | Cum | 198 ₹4,78,276.92 | 160 ₹3,86,486.4 Lowest |
| 4.00 | Earth work in excavation for lining work in sand stone, lime stone or other soft rock by pick axex but not required blasting for slope Lining including all lead & lift by truck or tractor trolley or any other power transport , with proper completion of work As per the direction of Engineer In Charge. | 3,160.6 | Cum | 454 ₹14,34,912.4 | 180 ₹5,68,908 Lowest |
| 5.00 | Earth work in filling for Ramp Formation with proper dressing and manual compaction including all lead & lift required for proper completion of the work. | 720 | Cum. | 266.9 ₹1,92,168 | 216 ₹1,55,520 Lowest |
| 6.00 | Earth work in filling for pitching near patulaki VRB with proper dressing and manual compaction including all lead & lift required for proper completion of the work. | 954 | Cum. | 266.9 ₹2,54,622.6 | 222 ₹2,11,788 Lowest |
| 7.00 | Earth work Excavation in Ordinary Soil for Removal of Ramp including all lead and lift and disposal of excavated earth with proper completion of work As per the direction of Engineer In Charge. | 720 | Cum. | 93 ₹66,960 | 76 ₹54,720 Lowest |
| 8.00 | Drilling 35 mm dia holes upto 5 M deep @ 1.5M C/C both way in staggered form including all lead and lift, labour and T&P etc, with proper completion of work & as per the direcrion of Engineer-In- Charge. | 5,845 | RM | 541 ₹31,62,145 | 450 ₹26,30,250 Lowest |
| 9.00 | Drilling 50 mm dia drainage holes upto 5 M deep @ 3.65M C/C both way in staggered from including all lead and lift, labour and T&P etc, with proper completion of work. | 1,035 | RM | 669 ₹6,92,415 | 600 ₹6,21,000 Lowest |
| 10.00 | Furnishing and installing 25mm dia bar in rock bolt upto 5 M deep in drill hole including installation of MS Plate of Size 150x150x10 mm ,Nut of 25 mm NB , threading of projected portion and including all lead and lift, labour and T&P etc, with proper completion of work & as per the direcrion of Engineer-In- Charge. | 5,845 | RM | 939.7 ₹54,92,546.5 | 800 ₹46,76,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹8 L
Closing Date
26 Jun 2026, 1:00 pmClosed
S.E. B.S.C.C.C.-1, Mzp
Superintending Engineer, Bansagar Canal Construction Circle-1, Mirzapur
Internal Slope Stabilization work between Km 21.000 to Km 21.500 of Meja Jirgo Link Canal
2026_UPIDC_1160587_1
01/SE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹8 L
9 Aug 2026
16 Jun 2026
26 Jun 2026
16 Jun 2026
26 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard soil mixed with boulder for foundation of Protection Wall including all lead & lift with proper completion of work. | 904.55 | Cum | - | - |
| 2 | Earth work excavation in sand stone, lime stone or other soft rock by pick axex but not required blasting for removing overburden including all lead & lift with disposal of excavated boulder as per the direction of Engineer In Charge. | 4,546 | Cum | - | - |
| 3 | Removing Soil mixed with boulder from canal bed which have fallen during overburden removal from right bank up including all lead & lift by truck or tractor trolley or any other power transport with proper completion of work as per the direction of Engineer In Charge | 2,415.54 | Cum | - | - |
| 4 | Earth work in excavation for lining work in sand stone, lime stone or other soft rock by pick axex but not required blasting for slope Lining including all lead & lift by truck or tractor trolley or any other power transport , with proper completion of work As per the direction of Engineer In Charge. | 3,160.6 | Cum | - | - |
| 5 | Earth work in filling for Ramp Formation with proper dressing and manual compaction including all lead & lift required for proper completion of the work. | 720 | Cum. | - | - |
| 6 | Earth work in filling for pitching near patulaki VRB with proper dressing and manual compaction including all lead & lift required for proper completion of the work. | 954 | Cum. | - | - |
| 7 | Earth work Excavation in Ordinary Soil for Removal of Ramp including all lead and lift and disposal of excavated earth with proper completion of work As per the direction of Engineer In Charge. | 720 | Cum. | - | - |
| 8 | Drilling 35 mm dia holes upto 5 M deep @ 1.5M C/C both way in staggered form including all lead and lift, labour and T&P etc, with proper completion of work & as per the direcrion of Engineer-In- Charge. | 5,845 | RM | - | - |
| 9 | Drilling 50 mm dia drainage holes upto 5 M deep @ 3.65M C/C both way in staggered from including all lead and lift, labour and T&P etc, with proper completion of work. | 1,035 | RM | - | - |
| 10 | Furnishing and installing 25mm dia bar in rock bolt upto 5 M deep in drill hole including installation of MS Plate of Size 150x150x10 mm ,Nut of 25 mm NB , threading of projected portion and including all lead and lift, labour and T&P etc, with proper completion of work & as per the direcrion of Engineer-In- Charge. | 5,845 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2175140.xls
BOQ • 5.36 MB
Tender_Document.pdf
Tender Documents • 3.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].