Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.8 Cr
EMD Value
₹5.5 L
Closing Date
6 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer (P) Pushpak
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl Mizoram
PDG AND LYG OF HMP READY MIX BC 30 MM TH INCL CLEANING RD SURF APPLYING TACK COAT WKS WITH BM 75 MM FOR RE-SURF WKS ON VARIOUS LOC KM 0.00 TO KM 17.445 KM NT LNGTH 7.358 KM ON CHK AND KM 0.00 TO 38.700 NT LNGTH 11.57 KM ON KNVK RD 74 RCC 24 TF P PSK
2026_BRO_794488_1
NIT 20 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
BET KM 0.00 TO KM 17.445 ON CHK RD KM 0.00 TO KM
AS TENDER DOC
8 documents required · 8 mandatory
₹0
₹5.5 L
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl Miz
17 Oct 2026
17 Oct 2026
7 Nov 2026
17 Oct 2026
6 Nov 2026
24 Oct 2026
21 Oct 2026 - 23 Oct 2026
22 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Re-Surfacing work on various locations between Km 0.00 to Km 17.445 (Net length 7.358 Km) on Champhai-Hnahlan-Khuangphah road and between Km 0.00 to Km 38.700 (Net length 11.57 Km) on Khuangphah-New Vaikhawtlang-Kawlbem road | |||||
| 1.01 | Providing and laying of HMP ready mix Bituminous Concrete (BC) 30 mm thick compacted with bitumen VG-30 as per clause 507 of MoRT&H Specifications (Fifth revision) for road and bridge work , tack coat as per clause 503 of MoRT&H Specifications (Fifth revision) on the existing BT surface, correction work with BM 75 mm thick compacted as per clause No 504 of MoRT&H Specifications (Fifth revision) including Prime Coat as per clause 502 of MoRT&H Specifications (Fifth revision ) duly maintaining the road profile with paver finisher and rolled as per clause 501.6 and 501.7 of MoRT&H Specifications (fifth revision) to achieve desired compaction including all labourers, materials and machinery as specified and directed by Engg-In-Charge.
Note: 1. The specification given in clause 3004.2 of MoRT&H Specifications (Fifth revision) will be complied while carrying out correction work.
2. The maximum area of correction work with BM 75 mm thick compacted will be 10% of the cost of BC 30 mm. | 78,078 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
tenderdocsNIT20.pdf
Tender Documents • 1.74 MB
BOQ_891058.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .