Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAdmitted-Finance | ₹29.4 L | L1 | Admitted-Finance |
| 2 | L2₹29.7 L+₹30,223.50 (1.03%)Admitted-Finance | ₹29.7 L+₹30,223.50 (1.03%) | L2 | Admitted-Finance |
| 3 | L3₹30.0 L+₹56,177.08 (1.91%)Admitted-Finance | ₹30.0 L+₹56,177.08 (1.91%) | L3 | Admitted-Finance |
| 4 | L4₹33.4 L+₹4.0 L (13.7%)Admitted-Finance | ₹33.4 L+₹4.0 L (13.7%) | L4 | Admitted-Finance |
| 5 | L5₹35.4 L+₹6.0 L (20.3%)Admitted-Finance | ₹35.4 L+₹6.0 L (20.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s F M Infratech India Private Limited L3 | Precision Engineers and Buildings L5 | peerzada sameer ahsan shah L1 | DAR ELECTRICALS L2 | s b electricals L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00SITC of below mentioned items | ||||||||
| 1.01 | 9 Mtr. Long Pole,(ST-410 SP33) | 23 | Nos | 17,499 ₹4,02,477 Lowest | 24,999 ₹5,74,977 | 21,900 ₹5,03,700 | 25,000 ₹5,75,000 | 20,700 ₹4,76,100 |
| 1.02 | 11 Mtr. Long Pole,(ST-410 SP56) | 45 | Nos | 26,199 ₹11,78,955 Lowest | 31,999 ₹14,39,955 | 28,600 ₹12,87,000 | 34,000 ₹15,30,000 | 35,000 ₹15,75,000 |
| 1.03 | GI V cross-arm / side cross arm/channel with top Bracket including clamp including back clamps | 3,292 | Kg | 127 ₹4,18,084 | 149 ₹4,90,508 | 125 ₹4,11,500 | 120 ₹3,95,040 Lowest | 137.75 ₹4,53,473 |
| 1.04 | 50 mm² ACSR Conductor | 8.92 | km | 49,999 ₹4,45,991.08 | 70,500 ₹6,28,860 | 41,000 ₹3,65,720 | 5,000 ₹44,600 Lowest | 39,000 ₹3,47,880 |
| 1.05 | Stringing of existing 50 mm² ACSR Conductor | 3 | km | 3,949 ₹11,847 | 1,100 ₹3,300 | 1,000 ₹3,000 Lowest | 2,500 ₹7,500 | 5,000 ₹15,000 |
| 1.06 | PG Clamps for 50 mm² ACSR Conductor | 180 | Nos | 249 ₹44,820 | 20 ₹3,600 | 10 ₹1,800 Lowest | 10 ₹1,800 Lowest | 70 ₹12,600 |
| 1.07 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 244 | Nos | 249 ₹60,756 | 310 ₹75,640 | 84 ₹20,496 Lowest | 250 ₹61,000 | 190 ₹46,360 |
| 1.08 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 90 | Nos | 399 ₹35,910 | 399 ₹35,910 | 140 ₹12,600 | 100 ₹9,000 Lowest | 370 ₹33,300 |
| 1.09 | Galvanized Nuts and Bolts | 176 | kg | 132 ₹23,232 | 139 ₹24,464 | 115 ₹20,240 | 110 ₹19,360 Lowest | 121 ₹21,296 |
Tender Value
₹42.0 L
EMD Value
₹84,040
Closing Date
20 Feb 2026, 9:00 amClosed
Office of The Executive Engineer ED Bandipora
office of the Executive Engineer ED BANDIPORA Block C Mini Secretariate Complex BANDIPORA
Revamping /Restoration of existing essential feeder for WSS Muradpora Canal Colony Bandipora
2026_PDD_301830_1
EDbpr32of2025-26
Open Tender
Electrical and Maintenance Works
Turn-key
30 days
Bandipora
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Executive Engineer ED Bandipora
₹84,040
Yes
6 Apr 2026
31 Jan 2026
20 Feb 2026
31 Jan 2026
20 Feb 2026
31 Jan 2026
31 Jan 2026 - 5 Feb 2026
SITC of below mentioned items
9 Mtr. Long Pole,(ST-410 SP33)
11 Mtr. Long Pole,(ST-410 SP56)
GI V cross-arm / side cross arm/channel with top Bracket including clamp including back clamps
50 mm² ACSR Conductor
Stringing of existing 50 mm² ACSR Conductor
PG Clamps for 50 mm² ACSR Conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Danger Plates with Clamps
Anti-Climbing Device with Clamps
Earthing Complete by GI Pipe 40 mm 3 mtr long/ rod 25mm,2500mm long through GI Strip 25x3 mm
Earthing of existing poles Complete by GI Pipe 40 mm 3 mtr long/ rod 25mm,2500mm long through GI Strip 25x3 mm( the job involves earthing of existing poles and welding of earthing channel to existing poles wherever required)
Painting of Poles with Red Oxide and Aluminium Paint
Cement bottoming of poles as per KPDCL/REC Standards
11 kV Isolator, Double Break,3-pole, 630Amp, horizontal mounting Type, with Earth Switch including GI and earthing
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 )mm, nut-bolts, 2 Nos turn- buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Branch Cutting/route clearance
Marking of new poles with scheme name, yeat etc as per directions of engineer incharge
Application of 3M brand 2inch high intensity reflective tape to poles(minimum of 3 strips of RYW color per pole )
stage.html
html • 0.03 MB
technical_979317.pdf
techsummary_979317.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.76 MB
sbd32.pdf
Tender Documents • 1.80 MB
TECHNICALSPECIFICATIONSelectric.pdf
Other Document • 2.68 MB
BOQ_979317.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .