| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | SRIDHARMURTHY L1 | MPS Engineering construction L2 |
|---|---|---|---|---|---|
| 1.00 | Labour for cutting open road for laying water mains in cement concrete road including labour charges etc., complete. | 3 | Cum | 1,320 ₹3,960 | 1,400 ₹4,200 |
| 2.00 | Earth work excavation in ordinary soil within intial lead and lift of all soils for pipe laying works including all labour charges etc., complete as per standard specififcation. | 573 | Cum | 205 ₹1.2 L | 210 ₹1.2 L |
| 3.00 | Supply and delivery of CI D/F SLUICE VALVE WITH CAP/ WHEEL AS PER IS 14846/2000 PN 1.0 WITH ISI MARKING AND WITH 5 YEARS WARRANTY 140 mm Sluice valve | 1 | nos. | 10,320 ₹10,320 | 10,400 ₹10,400 |
| 3.01 | 80 mm Sluice valve | 6 | nos. | 5,000 ₹30,000 | 5,010 ₹30,060 |
| 4.00 | Supply and delivry pf HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin) PN 6 including loading charges etc., complete.-6 " HDPE pipe | 60 | Rm | 605 ₹36,300 | 610 ₹36,600 |
| 4.01 | 6 " HDPE pipe Tee | 3 | nos. | 873.5 ₹2,620.50 | 875 ₹2,625 |
| 4.02 | 6 " HDPE pipe Bend | 6 | nos. | 851.5 ₹5,109 | 852 ₹5,112 |
| 4.03 | 6 " HDPE pipe Coupling | 4 | nos. | 570 ₹2,280 | 575 ₹2,300 |
| 4.04 | 6 " Tailpiece | 2 | nos. | 848 ₹1,696 | 850 ₹1,700 |
| 5.00 | Supply and delivery of following pipe and specials including loading and unloading charges etc., complete.-3" PVC Pipe | 6 | Rm. | 142 ₹852 | 143 ₹858 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
3 Sept 2025, 3:00 pmClosed
The Commissioner
Namakkal City Municipal Corporation
Providing pipe line at Sidco colony OHT to Kongu Nagar and Anna Nagar DMA - 5, and replacing of Periyapatti Scada Line in Ward no. 23
2025_MAWS_599124_3
4348/2025/E2
Open Tender
Civil Works
Namakkal City Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
1 Jan 2026
1 Sept 2025
3 Sept 2025
1 Sept 2025
3 Sept 2025
1 Sept 2025
Amount
Labour for cutting open road for laying water mains in cement concrete road including labour charges etc., complete.
Earth work excavation in ordinary soil within intial lead and lift of all soils for pipe laying works including all labour charges etc., complete as per standard specififcation.
Supply and delivery of CI D/F SLUICE VALVE WITH CAP/ WHEEL AS PER IS 14846/2000 PN 1.0 WITH ISI MARKING AND WITH 5 YEARS WARRANTY 140 mm Sluice valve
80 mm Sluice valve
Supply and delivry pf HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin) PN 6 including loading charges etc., complete.-6 " HDPE pipe
6 " HDPE pipe Tee
6 " HDPE pipe Bend
6 " HDPE pipe Coupling
6 " Tailpiece
Supply and delivery of following pipe and specials including loading and unloading charges etc., complete.-3" PVC Pipe
4" PVC Pipe
4" PVC Bend
4" x 3" PVC Reducer
3" Tailpiece
Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc.
Lowering PVC pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers
Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers
Refilling the trench with excavated earth including labour charges etc., Complete.
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
MPS Engineering construction (BID ID -1446900)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx