Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10.7 Cr
EMD Value
₹8.6 L
Closing Date
3 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer Bathinda Zone
Headquarters Chief Engineer Bathinda Zone Military Engineer Services PIN- 900484 C/o 56 APO
PROVISION OF DEFICIENT STP AND ALLIED WORKS IN SOUTH CAMPUS AT BATHINDA MIL STN
2025_MES_743384_1
84552 CE BTZ/BTD/TOKEN-58 OF 2025-26
Open Tender
Civil Works
Lump-sum
4015 days
GE (P) Bathinda
As per Notice Inviting Tender (NIT)
8 documents required · 8 mandatory
₹3,000
GE (P) Bathinda
₹8.6 L
Yes
Headquarters Chief Engineer Bathinda Zone
6 Dec 2025
6 Dec 2025
5 Feb 2026
6 Dec 2025
3 Feb 2026
27 Jan 2026
6 Dec 2025 - 10 Jan 2026
15 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part-I(SEWAGE TREATMENT PLANT WORKS) | |||||
| 0.9999 | Design, procurement, construction, and commissioning of 3 MLD STP at Bathinda Military Station all as per following raw sewage parameters and design basics report forming part of this tender document and effluent parameters listed below or those issued by central/state Pollution Control Board with Comprehensive maintenance including chemicals, electromechanical & B/R items, chemical, payment of electric supply & water supply for 10 years.
Perform site survey and prepare design proposal for deciding the capacity and Treatment technology to be adopted amongst prevailing technologies Soil bearing capacity 10 Ton/Sqm at 2 meter depth. However, the Contractor shall conduct his own soil investigation and design various civil structures accordingly. Average flow- 3000 cum/day Peak duration 3 Hr Peak factor-04
Influent (Raw) sewage parameters (located just prior to proposed STP) INLET
(a) pH - 6.5-8.5
(b) Temperature – Ambient
(c) Total Dissolved Solids (TDS) ≤700 mg/L
(d) Biochemical Oxygen Demand (BOD) ≤ 300 mg/L
(e) Chemical Oxygen Demand (COD) ≤ 450 mg/L
(f) Total Suspended Solids (TSS) ≤ 300 mg/L
(g) Oil & Grease ≤ 30 mg/L
(h) Total Nitrogen ≤ 50 mg/L
(i) Total Phosphorous ≤ 7 mg/L
(j) Fecal Coliform ≤ 10⁵- 10⁶ MPN/100 ml
However, the contractor shall get the raw sewage tested by collecting the samples as per CPEEHO Manual Sewerage and sewage disposal 2013, in NABL Approved Lab/ Govt Lab.
Effluent (Treated) Sewage parameters
(a) pH - 6.5-8.3 | 1 | Each Job | - | - |
| 0.3999 | Srl Item No 1.001 Continued......
(b) Temperature – Ambient
(c) Total Dissolved Solids (TDS) ≤ 100 mg/L
(d) Biochemical Oxygen Demand (BOD) ≤ 10 mg/L
(e) Chemical Oxygen Demand (COD) ≤ 50 mg/L
(f) Total Suspended Solids (TSS) ≤ 10 mg/L
(g) Oil & Grease ≤ 10 mg/L
(h) Total Kjeldhal Nitrogen ≤ 10 mg/L
(i) Total Phosphorous ≤ 2 mg/L
(j) Fecal Coliform – Nil
(k) Residual chlorine ≥ 1.0 ppm
Besides the contractor shall ensure that the effluent parameters must comply with the quality of treated water parameter for disposal or reuse guidelines issued by various State Government and Central Government agencies time to time. If they are more stringent that the ones given above.
Notes:
1. OCEMS(Online Continuous Efficiency Monitoring System): For continuous monitoring of raw sewage, treated water along with water level, flow rate and remote monitoring and operation of booster pumps for pumping raw sewage and treated water.
2. All civil, mechanical and electrical works and equipment for STP deemed to be included in quoted rate.
3. All works to be provided as per SOA 2022, SSR -2020 ,NBC- 2016 and good engineering practices.
4. The bidder shall submit proposal for more than 1 technology that shall be used while designing STP for approval by accepting officer on the basis of life-cycle cost, footprint of STP.
5. No tank shall be designed to hold wastewater/ treated water for more than 8 hrs at any stage. | - | - | - | - |
| 0.7999 | Srl Item No 1.001 Continued......
6. The rates quoted are inclusive of comprehensive maintenance and operation of proposed STP for a period of ten years after completion, at the percentage of quoted amount as reflected below. Hence 70 % of the quoted rate shall be towards design and construction of the STP as per yard stick and balance 30% for comprehensive maintenance and operation for ten year after completion:-
(i) Comprehensive maintenance and operation of the plant during first year@ rate of 1% of the the quoted rate
(ii) Comprehensive maintenance and operation of the plant during second year is 1% of the quoted rate
(iii) Comprehensive maintenance and operation of the plant during third year is 3% of the quoted rate
(iv) Comprehensive maintenance and operation of the plant during fourth year is 3% of the quoted rate
(v) Comprehensive maintenance and operation of the plant during fifth year is 3% of the quoted rate
(vi) Comprehensive maintenance and operation of the plant during sixth year is 3% of the quoted rate
(vii)Comprehensive maintenance and operation of the plant during seventh year is 4% of the quoted rate
(viii)Comprehensive maintenance and operation of the plant during eighth year is 4% of the quoted rate
(ix)Comprehensive maintenance and operation of the plant during ninth year is 4% of the quoted rate
(x)Comprehensive maintenance and operation of the plant during tenth year is 4% of the quoted rate
7. Electricity consumed during operation & maintenance period shall be charged from the dues of contractor at the rates charged by PSPCL .Smart meter for the same shall be installed by the contract rates is deemed to be included in the quoted rates also rate cell include cost of chemicals, electromechanical and B&R items, payment of electric supply and water supply for ten years and monthly testing row treated water from NABL approved lab. | - | - | - | - |
| 0.1999 | Srl Item No 1.001 Continued......
8. Consent to establish consent to operate from PCB shall be responsibility of the bidder. However, any fees that may be required to be paid to PCB shall be borne by department. | - | - | - | - |
| 2 | Lump sum price worked out by the tenderer for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part-II(Ref pre-priced schedule attached separately) | 1 | Running | 60,579.45 | ₹60,579.45 |
| 3 | Lump sum price worked out by the tenderer for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III(Ref pre-priced schedule attached separately) | 1 | Running | 8,66,667.03 | ₹8,66,667.03 |
| 4 | Lump sum price worked out by the tenderer for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part-IV(Ref pre-priced schedule attached separately) | 1 | Running | 51,400 | ₹51,400 |
| 5 | Lump sum price worked out by the tenderer for SITE CLEARANCE, EXCAVATION AND EARTH WORKS as listed in Schedule ‘A’ Part-V(Ref pre-priced schedule attached separately) | 1 | Running | 16,50,966.47 | ₹16,50,966.47 |
| 6Schedule 'A' Part-VI(MISCELLANEOUS WORKS) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TenderDocuments84552.pdf
Tender Documents • 2.26 MB
BOQ84552Split.xls
Tender Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .