| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Evaluation Completed Bidder is Qualified |
| 2 | Accepted-Technical | Accepted-Technical Evaluation Completed Bidder is Qualified |
| 3 | Accepted-Technical | Accepted-Technical Evaluation Completed Bidder is Qualified |
| 4 | Accepted-Technical 221 BARWALA BARAHAMAN WALI GALI BARWALA BARWALA NORTH WEST DELHI DELHI 110039 | NORTH DELHI | DELHI | 110039 | Accepted-Technical Evaluation Completed Bidder is Qualified |
| 5 | Accepted-Technical | Accepted-Technical Evaluation Completed Bidder is Qualified |
Tender Value
₹6.4 L
EMD Value
₹19,292
Closing Date
11 Aug 2026, 3:00 pmClosed
Udhayan Prabhari Ghaziabad Nagar Nigam
IV floor Udhaayn Vibhag Ghaziabad Nagar Nigam
Work-30 Construction of a footpath in the park opposite the B-421 double-storey houses in Ward 68 of the Vasundhara Zone.
2026_DOLBU_1172110_30
138/UDHYAAN/2026-27 GNN DT 21-07-2026
Open Tender
Miscellaneous Works
Percentage
Ghaziabad Nagar Nigam
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹19,292
14 Oct 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil Loarn, nlay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of I excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 | 21.23 | CUM | 110 | ₹2,335.3 |
| 2 | S/L P:C:C (1:6:12) with 40 mm gauge brick ballastfine sand of 1.25 fim and cement in foundation and under floor including all 2 materials, labour, tools, & plant etc all completed as per the direction of engineer-in-charge. AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273) | 5.1 | CUM | 4,000 | ₹20,400 |
| 3 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and 3 plinth and T&P etc all completed as per the direction of engineer in charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 | 26.54 | CUM | 5,170 | ₹1,37,211.8 |
| 4 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. excludine Rovallity. Wherever anglicable for | 73.08 | CUM | 295.1 | ₹21,565.91 |
| 5 | 12mm thick plaster with cement and coarse sand of 1.25 fineness modules in (1:4) over brick work minimum thickness not to be less then 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work (AS PER PWD SOR 2022 PAGE NO 36 SI | 89.6 | SQM | 200 | ₹17,920 |
| 6 | Prouiding wall sytty on new surface w approved quality materal of Berger/Bror similar make 3 couts AS PER PWD SOR 2022 662 NEW ITEM | 89.6 | SQM | 90 | ₹8,064 |
| 7 | Finishing wall with weather coat of approved make ano quality on old surface with two or more coat to give an even shade after throughly brushing the surface free from mortar droping and other foreign matters and sand papered smooth including supply of all materials, abour, Tools & plants etc required for proper completion of the work.. AS PER PWD SOR 2022 662 NEW ITEM. | 89.6 | SQM | 100 | ₹8,960 |
| 8 | S/L of stone hallast 22.4 to 5.3 mm size with stacking for measurment etc all complete as per the direction of engineer in-charge. AS PER | 24.46 | cum | 2,151.2 | ₹52,618.35 |
| 9 | Supply of screening material with stacking for measurment etc all complete as per the direction of engineer in-charge AS PER PWO SOR 2020 RMR | 4.4 | cum | 2,050.2 | ₹9,020.88 |
| 10 | Consolidation of stone aggregates of 45 63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform. thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per | 24.46 | cum | 690 | ₹16,877.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.71 MB
BOQ_2203001.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .