Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.3 LAccepted-AOC 116 8A KASIF ALI SAROY UNNAO | UNNAO | UNNAO | UTTAR PRADESH | ₹16.3 L | 1 | Accepted-AOC Lowest Bid |
| 2 | 2₹16.3 LRejected-Finance | ₹16.3 L | 2 | Rejected-Finance highest bid |
| 3 | 3₹16.3 LRejected-Finance | ₹16.3 L | 3 | Rejected-Finance highest bid |
Tender Value
₹16.3 L
EMD Value
₹1.6 L
Closing Date
24 Jun 2026, 10:00 amClosed
EO SHIVRAJPUR
OFC NP SHIVRAJPUR KANPUR NAGAR
WARD NO-02 IN GATA NO.374
2026_DOLBU_1159157_2
119/NPS/NJPSY/2026-27
Open Tender
Civil Works
180 days
SIVRAJPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,006
EO
₹1.6 L
30 Jun 2026
11 Jun 2026
24 Jun 2026
11 Jun 2026
24 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means( Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer- in- charge. | 0.8 | Cum | - | - |
| 2 | Plain cement concrete 1: 4: 8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size ( As per SOR rates S.I. No.281) | - | Cum | 1 | - |
| 3 | providing and laying in position cement concrte specified grade excluding the cost of centering and shuttering -all upto plith level fotting | - | Cum | - | - |
| 4 | Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :(1 :1.5 :3 ) | - | Cum | - | - |
| 5 | Supplying, fitting and placing placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications. | - | Kg | 1 | - |
| 6 | Centering and shuttering including strutting propping etc and removal from work wall | - | Sqm | - | - |
| 7 | Paroviding and fixing of weep Holes | - | No. | - | - |
| 8 | filling filter material over burnt brick ballast40 mm gauge | 1 | Cum | - | - |
| 11 | Hence, Cost of Boundary Wall per Rmt. | - | Kg | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_2172445.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid