| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹18.9 L+₹1.2 L (6.89%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹21.2 L+₹3.5 L (19.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹25.2 L+₹7.5 L (42.5%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹33.6 L
EMD Value
₹67,200
Closing Date
7 Sept 2026, 6:00 pmClosed
Executive Engineer PWD RandB PROJECT DIVISION III
Office of the PWD RandB PROJECT DIVISION III JAMMU
External face lifting of walls of Block C, D, E, F, G, H, I, K, L, Q, R, S, T, U, V, W and X by way of construction of new sunshades, repairing of damaged parapet walls including waterproofing in various blocks and some other allied works at Toph She
2026_PWDJK_322783_5
Short e-NIT No. 48 of 2026-2027 Dated 31-08-2026
Open Tender
Civil Works
Percentage
120 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PROJECT DIVISION III
₹67,200
Office of the PWD RandB PROJECT DIVISION III JAMMU
25 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engaging of labour for removal of bushes, uprooting of unwanted plants from walls and roofs of slabs | 18 | day | 553 | ₹9,954 |
| 2 | Dismantling old plaster or skirting, raking out joints and cleaning thesurface for plaster including disposal of rubbish to the dumping groundwithin 50 meters lead. | 1,177.32 | sqm | 38.9 | ₹45,797.75 |
| 3 | Demolishing brick work manually/by mechanical means including
stacking of serviceable material and disposal of unserviceable materialwithin 50 meters lead as per direction of Engineer-in-charge:In cement mortar | 3.19 | cum | 1,458.45 | ₹4,652.46 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) vide item no. 3 | 3.19 | cum | 7,571.55 | ₹24,153.24 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level vide item no. 3 | 3.19 | cum | 1,455.65 | ₹4,643.52 |
| 6 | 15mm Cement plaster on the rough side of single or half brick wall ofmix:1 : 6 ( 1 cement : 6 coarse sand) | 1,026.76 | sqm | 306.85 | ₹3,15,061.31 |
| 7 | Preparing the surface by removal of old layers of mortar on roof and cleaning the cracks with wire brushetc, shifting of debris/mulba from roof, parapets and adjoining areas to dumping sites by engaging labours. SKILLED | 12 | each | 734 | ₹8,808 |
| 8 | Preparing the surface by removal of old layers of mortar on roof and cleaning the cracks with wire brushetc, shifting of debris/mulba from roof, parapets and adjoining areas to dumping sites by engaging labours.. UNSKILLED | 20 | each | 553 | ₹11,060 |
| 9 | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 coarse sand) a) For levelling the roof surface before waterproofing | 788.1 | sqm | 283.8 | ₹2,23,662.78 |
| 10 | Providing and laying water proofing treatment on roofs of slabs byapplying cement slurry mixed with water proofing cement compoundconsisting of applying :
(a) after surface preparation, first layer of slurry of cement @ 0.488kg/sqm mixed with water proofing cement compound@ 0.253 kg/sqm.(b) laying second layer of Fibre glass cloth when the first layer is stillgreen. Overlaps of joints of fibre cloth should not be less than 10 cm.(c) third layer of 1.5 mm thickness consisting of slurry of cement @1.289 kg/sqm mixed with water proofing cement compound @ 0.670kg./sqm. and coarse sand @1.289 kg/sqm. This will be allowed to aircure for 4 hours followed by water curing for 48 hours.The entire treatment will be taken upto 30cm on parapet wall and tuckedinto groove in parapet all around.For the purpose of measurement the entire treated surface will bemeasured. vide item no. 8 | 788.1 | sqm | 556.2 | ₹4,38,341.22 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_1084159.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .