| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.3 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹46.4 L+₹1.2 L (2.60%)Rejected-Finance | L2 | Rejected-Finance Unsuccessful bidder | |
| 3 | L3₹47.0 L+₹1.7 L (3.77%)Rejected-Finance OLD HASIMARA PO HASIMARA DISTT ALIIPURDUAR WB PIN 735215 | HASIMARA | ALIPURDUAR | WEST BENGAL | 735215 | L3 | Rejected-Finance Unsuccessful bidder | |
| 4 | L4₹47.6 L+₹2.3 L (5.16%)Rejected-Finance | L4 | Rejected-Finance Unsuccessful bidder | |
| 5 | L5₹47.6 L+₹2.4 L (5.23%)Rejected-Finance | L5 | Rejected-Finance Unsuccessful bidder |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
30 Dec 2020, 6:00 pmClosed
GE AF Bagdogra
GE AF Bagdogra Bagdogra Airport PO, Dist Darjeeling, WB - 734421
OUTSOURCINGSERVICES FOR MAINTENANCE AND OPERATION AC PLANT OF 273 SU, SWIMMING POOL AND ELECTRIC INSTALLATION OF 20 WING AREA AT AFS BAGDOGRA
2020_MES_401972_1
8357/E8
Open Tender
Electrical and Maintenance Works
Item Rate
338 days
GE AF Bagdogra
As per NIT
8 documents required · 8 mandatory
₹500
GE AF Bagdogra
₹92,000
Yes
13 Jan 2021
9 Dec 2020
1 Jan 2021
9 Dec 2020
30 Dec 2020
23 Dec 2020
Amount
Outsourcing services for maintenance and operation of electrical installation including its periodical maintenance for 24 Hrs (round the clock with one semi skilled operator in a shift of 8 hrs) (Morning shift : 01 FGM, Afternoon shift : 01 FGM,Night shift : 01 FGM) complete up keep the maintenance of installaion machineries (DG Set 100 KVA, LT Panel -01 No, Transformer-100 KVA, AMF panel, etc.) and surrounding area of the intallation proper fillig of log sheets and submitting to JE, AGE (E/M) office weekly, ON-OFF street security light well in time with in the installation checking the serviceability of backup batteries bank daily at HQ 20 Wing Sub station locations all as specified and s per details given in Particular specification. Notes : (i) Necessary duty roster, log sheets, maint register/attendance register, payment documents be supplied, maint by the contractor & submitted weekly to JE incharge. (ii) Contractor will maintain the system by charging of battery & monitor fuel oil & water level of DG sets at his own cost. (iii) Electricity, water, fuel & lubricant required for operation & maint shall be issued by department to the contractor 'Free of Cost". (iv) Each Semi Skilled operator/electrician (ITI) certificate holder or high school pass with an experience of 03 (three) years as any operator must be presnent in the whole & 8 hours shift and leave the installation only when the next operator attended the plant. (v) Operator will maintain related documents i.e. log sheet of AC Plants, DG set and breakdown register. (vi) Contractor will ensure that 'Life Insurance Certificate' of each operator/electrician/helper against any mis-hapening will be produced before commencement of work to the Engr-in-Charge. In case of any incident/accident of the operator/electrician/helper, contractor will solely be responsible and any clain what so ever on this account shall not be dimissible. (vii) In the event of absence of any tradesmen/helper/electrician/operator in any of the shift, contractor shall be liable to bear the recovery @ Rs. 1000.00 for the shift. (viii) The contractor will deploy one exeperience supervisor for supervision and taking instruction & submission of all documents & infoarmation regarding the activity of issue of required store to Engr-in-Charge. The cost of deployment of supervisore is deemed to tbe included in the rate quoted by the contractor against Item No. 1.00. (ix) The contractor shall provide torch light/emergency light to the tradesmen in night duty housr. He will also provide the uniform shoe & name plate t the men deputed on duty ant they will wear the same on duty. If he not then a recovery of Rs. 500/- per month per person will be made on contractor. (x) The contractor shall employ the FGM/Operator/Helper only after police verification of his character and antecedents.
All as per ser item No. 1.00 above but in two shifts with one semi skilled operator (Morning shift -1 FGM, Afternoon Shift - 1 FGM) at PS-I Sub Station, GCA 03 Nos DG Sets (125KVA-01No & 75KVA-2Nos, LT Panel-2, transformer-200KVA) and Base Ops DG Set-125KVA-01 No
Outsourcing services for maintenance and operation of electrical installation including its periodical maintenance in three shifts one semi skilled operator in a shift of 8 hrs (Morning shift : 01 FGM, Afternoon shift : 01 FGM, Night shift-1 FGM ) complete up keep the maintenance of installaion machineries (DG Set-365KVA & 62.5KVA, VCB 400 Amps - 08 Nos, LT Panel-02 Nos, Transformer 400 KVA, AMF panel, etc.) and surrounding area of the intallation proper fillig of log sheets and submitting to JE, AGE (E/M) office weekly, ON-OFF street security light well in time with in the installation checking the serviceability of backup batteries bank daily following locations all as specified and as per details given in Particular specification. (a) Captive Power House Notes : (i) Necessary duty roster, log sheets, maint register/attendance register, payment documents be supplied, maint by the contractor & submitted weekly to JE incharge. (ii) Contractor will maintain the system by charging of battery & monitor fuel oil & water level of DG sets at his own cost. (iii) Electricity, water, fuel a& lubricant required for operation & maint shall be issued by department to the contractor 'Free of Cost". (iv) Each Semi Skilled operator/electrician (ITI) certificate holder or high school pass with an experience of 03 (three) years as any operator must be presnent in the whole & 8 hours shift and leave the installation only when the next operator attended the plant. (v) Operator will maintain related documents i.e. log sheet of AC Plants, DG set and breakdown register. (vi) Contractor will ensure that 'Life Insurance Certificate' of each operator/electrician/helper against any mis-hapening will be produced before commencement of work to the Engr-in-Charge. In case of any incident/accident of the operator/electrician/helper, contractor will solely be responsible and any clain what so ever on this account shall not be dimissible. (vii) In the event of absence of any tradesmen/helper/electrician/operator in any of the shift, contractor shall be liable to bear the recovery @ Rs. 1000.00 for the shift. (viii) The contractor will deploy one exeperience supervisor for supervision and taking instruction & submission of all documents & infoarmation regarding the activity of issue of required store to Engr-in-Charge. The cost of deployment of supervisore is deemed to tbe included in the rate quoted by the contractor against Item No.3.00 (ix) The contractor shall provide torch light/emergency light to the tradesmen in night duty housr. He will also provide the uniform shoe & name plate t the men deputed on duty ant they will wear the same on duty. If he not then a recovery of Rs. 500/- per month per person will be made on contractor. (x) The contractor shall employ the FGM/Operator/Helper only after police verification of his character and antecedents.
Outsourcing services for routine maintenance and operation of swimming pool, IRP (8000 GPH), submersible pump (15HP) and any other equipments/maintenance installed at swimming pool at 20 Wing, AFS Bagdogra in two shift of 8 hours each per day with one semi skilled operator and one helper (unskilled) all specified and directed by Engr-in-Charge. Note - (i) Necessary log Sheet, maint register/attendance register be supplied and maint by the contractor. (ii) Maintenane period of swimming pool shall not be deducted from manning and operation period of 8 hours shift. (iii) Electricity & water required for operation & maintenance shall be issued by department to contractor 'Free of Cost'. (iv) Each semi-skilled operator should have (ITI) certificate holder or high school pass with an experience of 03 (Three) year as pump operator must be present in the whole 8 hours shift and leave the pump house only when the next operator attended the plant. (v) Operator will maintain related documents i.e. log sheet of pump, chloronomes and supply of water and breakdown register in case if residual chlorine is not mainted recovery @ Rs. 1000 per shift shall be liable. (vi) Contractor will ensure that 'Life Insurance Certificate' of each operator/electrician/helper against any mis-hapening will be produced before commencement of work to the Engr-in-Charge. In case of any incident/accident of the operator/electrician/helper, contractor will solely be responsible and any clain what so ever on this account shall not be dimissible. (vii) In the event of absence of any tradesmen/helper in any of the shift, contractor shall be liable to bear the recovery @ Rs. 1000.00 for the shift. (viii) The contractor will deploy one exeperience supervisor for supervision and taking instruction & submission of all documents & infoarmation regarding the activity of issue of required store to Engr-in-Charge. The cost of deployment of supervisore is deemed to tbe included in the rate quoted by the contractor against Item No. 4.00. (ix) The contractor shall provide torch light/emergency light to the tradesmen in night duty housr. He will also provide the uniform shoe & name plate t the men deputed on duty ant they will wear the same on duty. If he not then a recovery of Rs. 500/- per month per person will be made on contractor. (x) The contractor shall employ the semi-skilled FGM/Operator/Helper only after police verification of his character and antecedents. (xi) Chemicals required for maintenance of swimming pool shall be supplied by the dept free of cost, operator to collect chemicals and utilize them as per specific dosage. (xii) General cleaness of machinery & surrounding area is to be mantan by operator and helper. (a) 01 Semi Skilled FGM & 01 helper for each shift of 8 hrs at swimming pool 20 Wg (Shift A - 06:00AM to 02:00PM, Shift B- 02:00PM to 10:00PM).
Outsourcing services for maintenance and operation of Air conditioning plat including its periodical maintenance such as filter cleaning and electrical meter checking etc with 24 hours operation in 03 shif per day (each shift of 8 hours) with one skilled operator including sundays and holidays for operation with suitable reliever for AC plant of 273 SU (ductable/mega split type) and all as specified and all as per details given including submission of log sheet & documents weekly all as directed. Notes : (i) Necessary duty roster, log sheets, maint register/attendance register, payment documents be supplied, maint by the contractor & submitted weekly to JE incharge. (ii) Contractor will maintain the system at his own cost. (iii) Electricity, water, fuel & lubricant required for operation & maint shall be issued by department to the contractor 'Free of Cost". (iv) Each Semi Skilled operator/electrician (ITI) certificate holder or high school pass with an experience of 03 (three) years as any operator must be presnent in the whole & 8 hours shift and leave the installation only when the next operator attended the plant. (v) Operator will maintain related documents i.e. log sheet of AC Plants, DG set and breakdown register. (vi) Contractor will ensure that 'Life Insurance Certificate' of each operator/electrician/helper against any mis-hapening will be produced before commencement of work to the Engr-in-Charge. In case of any incident/accident of the operator/electrician/helper, contractor will solely be responsible and any clain what so ever on this account shall not be dimissible. (vii) In the event of absence of any tradesmen/helper/electrician/operator in any of the shift, contractor shall be liable to bear the recovery @ Rs. 1000.00 for the shift. (viii) The contractor will deploy one exeperience supervisor for supervision and taking instruction & submission of all documents & information regarding the activity of issue of required store to Engr-in-Charge. The cost of deployment of supervisore is deemed to be included in the rate quoted by the contractor against Item No.5 (a). (ix) The contractor shall provide torch light/emergency light to the tradesmen in night duty house. He will also provide the uniform shoe & name plate the men deputed on duty and they will wear the same on duty. If he not then a recovery of Rs. 500/- per month per person will be made on contractor. (x) The contractor shall employ the FGM/Operator/Helper only after police verification of his character and antecedents. (a) Ductable Spit type AC plant ( 3 unit of capacity 11.6 TR & 3 unit of capacity 8.5 TR ) & DG Set at 273 SU. Details of Shift are as followes : (Morning shift : 01 Ref Mech, Afternoor : 01 Ref Mech, Night Shift : 01 Ref Mech).
Supply only 4 pole power contactors 130Amp, conforms to IS/IEC 60947-4-1, 130Amps auxiallary contact 2 NO + 2 NC complete all as specified and directed.
Supply only 4 pole power contactors 200Amp, conforms to IS/IEC 60947-4-1, 130Amps auxiallary contact 2 NO + 2 NC complete all as specified and directed.
Supply only onload changeover, switch I-O-II, 415 Volts 4 pole phase barriers and handle with door interlocking kit of capacity 125Amps.
Supply only onload changeover, switch I-O-II, 415 Volts 4 pole phase barriers and handle with door interlocking kit of capacity 200mps.
Supply only MCCB FP/TPN 400 Amps adjustable type of rup cap 50 KA at 415 Volts, 50 HZ AC as specified and directed.
Supply only MCCB FP/TPN 200 Amps adjustable type of rup cap 35 KA at 415 Volts, 50 HZ AC as specified and directed.
Supply only MCCB FP/TPN 160 Amps adjustable type of rup cap 25 KA at 415 Volts, 50 HZ AC as specified and directed.
Supply only MCCB FP/TPN 100 Amps adjustable type of rup cap 25 KA at 415 Volts, 50 HZ AC as specified and directed.
Supply only MCCB FP/TPN 63 Amps adjustable type of rup cap 25 KA at 415 Volts, 50 HZ AC as specified and directed.
Supply only MCB TPN 'C' series of capacity 32 Amps as specified and directed.
Supply only MCB SP 'C' series of capacity 6 to 32 Amps as specified and directed.
Supply only for premixs coolant type JIS-K-2234-94 class 2 as specified and directed
M/S SARKAR ELECTRIC
M/S BIJAY KUMAR SHIVA
Shree Ram Construction
KD SAHA and CO.INDIA
SARKAR ENGINEERING CO.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .