| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.1 CrAccepted-AOC PLOT NO 65 SECTOR 18 OPP HIPA SARHAUL GURUGRAM 122 001 | ₹71.1 Cr Quoted ₹72.3 Cr | L1 | Accepted-AOC lowest L1 |
| 2 | L2₹74.5 CrRejected-AOC PREMISES NO 5 30 5 N C SENGUPTA SARANI GROUND FLOOR MALL ROAD KOLKATA WEST BENGAL INDIA 700 080 | KOLKATA | KOLKATA | WEST BENGAL | 700080 | ₹74.5 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹76.5 CrRejected-AOC | ₹76.5 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹78.4 CrRejected-AOC | ₹78.4 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹79.4 CrRejected-AOC | ₹79.4 Cr | L5 | Rejected-AOC L5 |
Tender Value
₹80 Cr
EMD Value
₹40 L
Closing Date
29 Nov 2023, 6:00 pmClosed
DGMAP
DGMAP KASHMIR HOUSE RAJAJI MARG NEW DELHI
CANoDGMAPPHIIPKG27S09RC 01OF 20232024
2023_MES_611997_2
81972sagaur
Open Tender
Civil Works
548 days
SAUGOR
as per NIT
11 documents required · 11 mandatory
₹3,000
DGMAP
₹40 L
DGMAP DELHI
29 Jan 2024
10 Oct 2023
7 Dec 2023
10 Oct 2023
29 Nov 2023
8 Nov 2023
17 Oct 2023 - 25 Oct 2023
27 Oct 2023
Amount
Schedule A Sec I List of price for building works (Note) -The details of balance work and photographs of each block is enclosed for reference only. The tenderers are advised to visit the site and workout their balance works bafore quoting their lump sum amount against each block. Completion of balance work for construction of block of 6 Dwelling Units for JCOs at Garden Line Site, in triple storyed construction (ground + 2 storeys ).framed structure including covered garages ,covered staircase,verandahs,baconies,dryout balconies,dry out verandahs,enterance verandah,ramps,passage,platforms,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
JCOs Block no. 1 (Garden Line) Completion of balance work in JCOs accn the details of work executed in percentage in terms of yardsticks, Annexture 1&2.
JCOs Block no. 2 (Garden Line) Completion of balance work in JCOs accn the details of work executed in percentage in terms of yardsticks, Annexure 3.
Completion of balance work for construction of block of 6 Dwelling Units for JCOs at V.K Line Site, in triple storyed construction (ground + 2 storeys ).framed structure including covered garages ,covered staircase,verandahs,baconies,dryout balconies,dry out verandahs,enterance verandah,ramps,passage,platforms,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
JCOs Block no. 1 (V.K Line Site) Completion of balance work in JCOs accn the details of work executed in percentage in terms of yardsticks, (Refer Annex -4 )
Completion of balance work for construction of block of 4 Dwelling Units for JCOs at V.K Line Site, in double storyed construction (ground + 1 storeys ).frame structure including covered garages ,covered staircase,verandahs,baconies,dryout balconies,dry out verandahs,enterance verandah,ramps,passage,platforms,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
JCOs Block no. 2 (V.K Line Site) Completion of balance work in JCOs accn the details of work executed in percentage in terms of yardsticks, Annexure 5.
Completion of balance work for construction of block of 3 Dwelling Units for JCOs at V.K Line Site, in double storyed construction (ground + 1 storeys ).framed structure including covered garages ,covered staircase,verandahs,baconies,dryout balconies,dry out verandahs,enterance verandah,ramps,passage,platforms,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
JCOs Block no. 3 (V.K Line Site) Completion of balance work in JCOs accn the details of work executed in percentage in terms of yardsticks,Annexure6&7.
Completion of balance work for construction of block of 6 Dwelling Units for OR at Garden Line Site, in triple storyed construction (ground + 2 storeys ).framed structure including covered scooter sheeds, ,covered staircase,verandahs,entrance lobby ,baconies,dry out verandahs,dry out balconies,stilt,lobbies,staircase lobbies,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
OR's (G+2) block No 1 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 8
OR's (G+2) block No 2 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 9
OR's (G+2) block No 3 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure10
OR's (G+2) block No 4 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 11
OR's (G+2) block No 5 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 12
OR's (G+2) block No 6 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 13
OR's (G+2) block No 7 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 14
OR's (G+2) block No 8 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 15
OR's (G+2) block No 9 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure16
OR's (G+2) block No 10 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 17
OR's (G+2) block No 11 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 18
OR's (G+2) block No 12 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 19
OR's (G+2) block No 13 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 20
OR's (G+2) block No 14 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 21
OR's (G+2) block No 15 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 22
OR's (G+2) block No 16 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 23
OR's (G+2) block No 17 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 24
OR's (G+2) block No 18 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure25
OR's (G+2) block No 19 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 26
OR's (G+2) block No 20 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 27
OR's (G+2) block No 21 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure28
OR's (G+2) block No 22 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 29
OR's (G+2) block No 23 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 30
OR's (G+2) block No 24 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure31
OR's (G+2) block No 25 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 32
OR's (G+2) block No 27 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 33
OR's (G+2) block No 28 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 34
OR's (G+2) block No 29 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure35
OR's (G+2) block No 30 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 36
OR's (G+2) block No 31 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure37
OR's (G+2) block No 32 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 38
OR's (G+2) block No 33 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure39
OR's (G+2) block No 34 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 40
OR's (G+2) block No 35 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 41
OR's (G+2) block No 36 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 42
OR's (G+2) block No 37 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 43
OR's (G+2) block No 38 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 44
OR's (G+2) block No 39 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 45
OR's (G+2) block No 40 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 46
OR's (G+2) block No 41 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 47
OR's (G+2) block No 42 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 48
Completion of balance work for construction of block of 6 Dwelling Units for OR at V.K Line Site, in triple storyed construction (ground + 2 storeys ).framed structure including covered scooter sheeds, ,covered staircase,verandahs,entrance lobby ,baconies,dry out verandahs,dry out balconies,stilt,lobbies,staircase lobbies,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
OR's (G+2) block No 1 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 50
OR's (G+2) block No 2 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 51
OR's (G+2) block No 3 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 52
OR's (G+2) block No 4 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure53
OR's (G+2) block No 5 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 54
OR's (G+2) block No 6 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 55
OR's (G+2) block No 7 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure56
OR's (G+2) block No 8 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 57
OR's (G+2) block No 9 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure58
OR's (G+2) block No 10 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 59
OR's (G+2) block No 11 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure60
OR's (G+2) block No 12 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 61
OR's (G+2) block No 13 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure Annexure 62
OR's (G+2) block No 14 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 63
OR's (G+2) block No 15 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 64
OR's (G+2) block No 16 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 65
OR's (G+2) block No 17 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 66
OR's (G+2) block No 18 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 67
OR's (G+2) block No 19 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 68
OR's (G+2) block No 20 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 69
OR's (G+2) block No 21 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 70
OR's (G+2) block No 22 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 71
OR's (G+2) block No 23 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 72
OR's (G+2) block No 24(VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 73
OR's (G+2) block No 25 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 74
OR's (G+2) block No 26 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 75
OR's (G+2) block No 27 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 76
OR's (G+2) block No 28 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 77
OR's (G+2) block No 29 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 78
OR's (G+2) block No 30 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 79
OR's (G+2) block No 31 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 80
OR's (G+2) block No 32 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 81
OR's (G+2) block No 33 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 82
OR's (G+2) block No 35 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 83
OR's (G+2) block No 36 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 84
OR's (G+2) block No 37 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 85
OR's (G+2) block No 38 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 86
OR's (G+2) block No 39 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 87
OR's (G+2) block No 40 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 88
OR's (G+2) block No 41 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 89
OR's (G+2) block No 42 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 90
Completion of balance work for construction of block of 4 Dwelling Units for OR at V.K Line Site, in double storeyed construction (ground + 1 storeys ).framed structure including covered scooter sheeds, ,covered staircase,verandahs,entrance lobby ,baconies,dry out verandahs,dry out balconies,stilt,lobbies,staircase lobbies,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
OR's (G+1) block No 34 (VK Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 91
Completion of balance work for construction of block of 4 Dwelling Units for OR at Garden Line Site, in double storyed construction (ground + 1 storeys ).framed structure including covered scooter sheeds, ,covered staircase,verandahs,entrance lobby ,baconies,dry out verandahs,dry out balconies,stilt,lobbies,staircase lobbies,plinth protrection around the block,steps etc. complete all as specified and shown on drawing.
OR's (G+1) block No 26 (Garden Line) Note: The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, and photograph of block is enclosed as Annexure 49
Construction of Guard Room with toilet, in single storeyed construction complete all as specified and shown on drawings.
Construction of Sentry Post in single storeyed construction complete all as specified and shown on drawings.
Construction of Garbage Bin complete with its curtain wall including flooring upto curtain wall complete all as specified and shown on drawings.
List of works & prices for Internal Water Supply. Schedule A, Section II.
List of works & prices for Internal Electrification. Schedule A, Section III A&B.
List of works & prices for Road, Path and Culvert. Schedule A, Section IV.
List of works & prices for Area Drainage. Schedule A, Section V.
List of works & prices for Security Wall,Fencing, Gate. Schedule A, Section VI.
List of works & prices for Street Lighting . Schedule A, Section VII.
Material & labour sand filling in and around the cable including in and around punning down for cushioning complete all as specified and as directed by Project Manager.
Supply & laying burnt clay brick (Sub Class 'B') laid in trenches for cable protection complete all as specified and as directed by Project Manager.
Supply and erecting steel tubular swaged poles, SP-31 (9 metres long) bent to shape complete with cast iron base plate final taper plug bolts, nuts and screws with and including painting two coats of aluminium paint over a coat of red oxide zinc chromate primer complete all as specified and as directed by Project Manager. (Earth work & PCC for foundation to be measured and paid under approriate item of Sch-'A').
Supply and fixing 1x150 Watt HPSV Street light luminaire with the ignitor single piece die cast, deep drawn aluminium housing complete with control gear compartment, Pf improvement capacitors, acrylic cover UV stablize, ballast of dual taping, dynamic power saving device to reduce power & wattage to 100 watt after six hours peak load , prewired complete with and including 1 x 150 Watt HPSV lamp (Philips SRP 202/150 & for lamp 1xSON/SON-T 150W Bajaj, Wipro, Surya Roshni or equv) with and including suitable arrangement for mounting on 50 mm dia bracket arm and also connecting complete all as specified and as directed by Project Manager.
Supply and fixing MATAL HALIDES LAMPS 150 watt for corners / turnings with all acessories and fittings complete all as specified and as directed by Project Manager.
Material and labour wiring with three single core 2.5 Sq mm PVC insulated cables with aluminium conductor and drawing into and including suitable size conduit (For street lights from junction box to the fixture) complete all as specified and as directed by Project Manager.
Supply and fixing MS Kiosk box made from 2mm thick MS sheet including Bus bar TPN 4 Strip 63 A capacity & I No. 6 Amp MCB mounted on Bus insulator over the bakelite sheet for street light fitting including mounting on pole with 2 Nos. 25 x 3 mm flat iron clamps & shutter to be opened closed vertically with retained ball locking system with size of box as 200mmx150mmx100mm complete with two coats of synthetic enamel paint over a coat of red oxide primer after preparation of surfaces complete end termination of suitable size of Aluminium thimble duly crimpled all as specified and as directed by Project Manager.
Supplying, laying testing and commissioning of following sizes of XLPE insulated (Heavy duty) Aluminium conductor armoured cables suitable for working voltage upto and including 1100 Volts, laid or buried in ground complete as required and as per specifications complete all as specified and as directed by Project Manager. (a) 4 x 10 sq mm cable.
Supplying, laying testing and commissioning of following sizes of XLPE insulated (Heavy duty) Aluminium conductor armoured cables suitable for working voltage upto and including 1100 Volts, laid or buried in ground complete as required and as per specifications complete all as specified and as directed by Project Manager. (b) 4 x 6 sq mm cable
Supply and fixing of integral POST TOP LANTERN comprising of white opal acrylic diffuser canopy & opal bowl providing upward & downward light along with Y shaped pipe arrangement for vertical mounting as per BAJAJ cat ref BNOB 218 : complete with all accessaries including lighting luminaire 70 watt & cable etc., as specified and as directed by Project Manager.
Numbering of poles all as specified and as directed by Project Manager.
Design, manufacture, supply, installation, testing and commissioning of 3.15 mm thick sheet metal enclosed outdoor type factory made distribution pillars of suitable size for housing the following components with and including comprising of the components detailed below, complete with water proof, dust and vermin proof, hinged and lockable doors complete with interconnections, with aluminium wires, tapes, bonding to earth and painting with two coats of synthetic enamel paint on a coat of red oxide primer after preparation of surfaces complete as required. (Note: - 1. The feeder pillar shall consist of MCCB as incoming and MCB as outgoing. 2. The rate shall include brick foundation with plastering complete as required). Incoming 1 No. 63A 4P MCCB, 10 KA breaking capacity along with energy saving unit for automatically switching on lights on all phases from 6pm to 10 pm, switch off lights on yellow phase from 10 pm to 2 am, and switching on lights on blue phase from 2 am to 6 am and switching off lights on all phases from 6am to 6 pm . Bus Bar 1 set of 100 Amps TPN Aluminium Bus Bars of suitable length and of cross section not less than 1 x 10 x 10mm per phase. Bus bars shall be insulated by heat shrinkable sleaves & clip on shrouds for joints. Bus bar shall be designed to withstand a fault level of 25 KA at 415 volts. Outgoings 5 Nos. of 10 Amp TP MCB ,10 KA breaking capacity
Design, manufacture, supply, installation, testing and commissioning of 3.15 mm thick sheet metal enclosed outdoor type factory made distribution pillars of suitable size for housing the following components with and including comprising of the components detailed below, complete with water proof, dust and vermin proof, hinged and lockable doors complete with interconnections, with aluminium wires, tapes, bonding to earth and painting with two coats of synthetic enamel paint on a coat of red oxide primer after preparation of surfaces complete as required. (Note: - 1. The feeder pillar shall consist of MCCB as incoming and MCB as outgoing. 2. The rate shall include brick foundation with plastering complete as required). Incoming 1 No. 63A 4P MCCB, 10 KA breaking capacity along with energy saving unit for automatically switching on lights on all phases from 6pm to 10 pm, switch off lights on yellow phase from 10 pm to 2 am, and switching on lights on blue phase from 2 am to 6 am and switching off lights on all phases from 6am to 6 pm . Bus Bar 1 set of 100 Amps TPN Aluminium Bus Bars of suitable length and of cross section not less than 1 x 10 x 10mm per phase. Bus bars shall be insulated by heat shrinkable sleaves & clip on shrouds for joints. Bus bar shall be designed to withstand a fault level of 25 KA at 415 volts. Outgoings 6Nos. of 10 Amp TP MCB ,10 KA breaking capacity
Supply and fixing 1.0 metre long 50 mm dia MS painted bracket for mounting of street light fixture on one side and on the other side connected to the pole including all accessories as required all as shown in the drawing for pole detail, as specified and as directed by Project Manager.
Material and labour for earthing complete with galvanised steel earth plate electrode 600x600x6.3 mm thick buried directly in ground not less than 2.25 mtrs deep below ground level with top edge of the plate not less than 1.5 mtr below normal ground level, connected to and including galvanised earth lead wire 4 mm dia as earthing lead by means of bolts, nuts, check nuts & washers of galvanised iron or steel all as shown in drawing (electrical plate No. 3) connected to earthing test point (7.5 mtrs length from top of plate to test point as SSR), (Test point also to be duly made) all as specified and indicated with & including excavation & earth work in any type of soil and removal of excavated soil upto 50 m, PCC pit, PCC cover with lifting hook, funnel with watering pipe 20mm dia GI light grade, earth lead protection GI pipe of 15 mm dia, wire mesh, charcoal & salt etc. including testing on completion complete all as specified and as directed by Project Manager. (The rate quated shall also include earth continuity conductor and its protection pipe upto and including 7.50 mtr long from the top of earth plate).
Material and labour earthing complete with galvanised steel pipe electrode 40 mm bore medium grade 2.5 mtr length buried directly and preferably vertically in ground with top edge not less than 1.25 metres below ground level connected with earthing lead of 4 mm dia galvanised iron or steel wire all as shown in plate No. 2 to the earthing test point (7.5 mtrs length from top edge of pipe to test point as per SSR), (Test point also to be duly made), all as specified and indicated with & including excavation & earth work in any type of soil and removal of excavated soil upto 50 m, PCC pit, PCC cover with lifting hook, funnel with watering pipe, 20 mm dia GI light grade earth lead protection GI pipe of 15mm dia, wire mesh, charcoal & salt etc. including testing on completion complete all as specified and as directed by Project Manager. (The rate quated shall also include earth continuity conductor and its protection pipe upto and including 7.50 mtr long from the top of earth plate).
Material and labour for earth continuity conductor or main earthing lead of 4 mm dia galvanised iron or steel wire, fixed to wall on batten or recess or chases or buried in ground or drawn in conduit /pipe or fixed to poles or any other indicated situation for loop earthing etc. as required complete all as specified and as directed by Project Manager.
Material and labour PCC (1:4:8) type D-2, using 40 mm graded stone aggregate as in foundations, filling and mass concrete complete all as specified and as directed by Project Manager.
Material and labour PCC (1:2:4) type B-2, using 40 mm graded stone aggregate as in foundations, filling and mass concrete complete all as specified and as directed by Project Manager.
Material and labour 40 mm nominal bore mild steel tubing, medium grade, galvanised with and including all fittings such as bends, elbows, tees, short pieces, connectors, bolts nuts, diminishing pieces, caps, plugs, unions etc. complete all as specified and as directed by Project Manager.
Provision of Cables indicator of PCC cover medium 750 mm long*300mm*100mm with opening at both sides (Refer to item no-17.08a &17.09 b)work was done by previous contractor
Commissioning & testing of 4x10 sq mm cable of XLPE insulated(Heavy duty) Aluminium conductor armoured cable (Refer to item no-17.08a)work was done by previous contractor
commissioning & testing of 4x6 sq mm cable of XLPE insulated(Heavy duty) Aluminium conductor armoured cable (Refer to item no-17.09b)work was done by previous contractor
Commissiong & testing of Post Top Lantern (Refer to item no-17.10)work was done by previous contractor
Commissioning & testing of 3.15 mm thick sheet metal enclosed outdoor type factory made distribution pillars of suitable size. (Refer to item no-17. 12)work was done by previous contractor
List of works & prices for Solar Water Heater. Schedule A, Section VIII.
Supply, erection, testing & commissioning of 300 LPD solar water heater system (compartment type) for 8 blocks of MAJOR(G+1) of 4 DUs & OR/JCOs (G+2) 85 blocks of 6 DUs; system comprising of Solar flat plate collector IS : 12933 (Part 1) with Amdt - 1 & IS : 12933 (Part - 2)/ 2003, collector stand assembly with panel, pressure release valve, stainless steel hot water storage tank (SS-304) of 300 litres & other components complete, including cutting and making good the floors / walls wherever required, including all interconnecting piping complete all as specified and shown on drawings and as directed by Project Manager.
Supply, erection, testing & commissioning of 200 LPD solar water heater system (compartment type) for 3 blocks of OR/JCOs (G+1) of 4 DUs system comprising of Solar flat plate collector IS-12933 (Part-1) with Amdt - 1 & IS-12933 (Part-2)/2003 collector stand assembly with panel pressure release valve, stainless steel hot water storage tank (SS-304) of 200 litres & other components complete including cutting and making good the floors / walls wherever required, including including all interconnecting piping complete all as specified and shown on drawings and as directed by Project Manager.
Supply, erection, testing & commissioning of 150 LPD solar water heater system for 1block of JCOs(G+1) of 3DUs &1 block of MAJOR (G) of 2DUs,with panel, automatic thermostatic control, pressure release valve, storage tank complete including cutting and making good the floors / walls wherever required, with (SS-304) of 150 litres & other components complete, including cutting and making good the floors / walls wherever required, including all interconnecting piping complete all as specified and shown on drawings and as directed by Project Manager.
Supply and fixing rotational moulded double layered HDPE water storage tanks (cylindrical vertical with closed top) of 500 litres capacity hoisted and fixed in position complete all as specified and as directed by Project Manager.
Supply and fixing rotational moulded double layered HDPE water storage tanks (cylindrical vertical with closed top) of 300 litres capacity hoisted and fixed in position complete all as specified and as directed by Project Manager.
Supply and fixing rotational moulded double layered HDPE water storage tanks (cylindrical vertical with closed top) of 200 litres capacity hoisted and fixed in position complete all as specified and as directed by Project Manager.
Supply and fixing Ball brass valves, high pressure, with polythene float & flynut including ferrule and all accessories complete, screwed for 15 mm bore dia iron pipes and fittings or brass ferrules, complete all as specified and as directed by Project Manager.
Supply and fixing 20 mm dia gun metal globe or gate valve with iron wheel head, screwed both ends for G.I. pipes and fittings complete all as specified and as directed by Project Manager.
Material & Labour 15 mm dia fancy type chromium plated gate valve complete all as specified and as directed by Project Manager
Material & Labour Mixture 15 mm dia cast copper alloy with all accessories for bath room & shower complete all as specified and as directed by Project Manager
Supply & laying of GI pipe 20 mm dia for plumbing from cold water tank complete all as specified and as directed by Project Manager
Supply & laying of GI pipe 15 mm dia with 9 mm thick nitryl insulation including 26 SWG Aluminium cladding on all open surfaces plumbing from hot water tank, all as specified and as directed by Project Manager
Provision of 9 mm thick nitryl insulation of 26 SWG Aluminium cladding on all open surfaces plumbing from hot water tank work was done by previous contractor
Provision of bat clamps in vertical run at interval of 3 m or less of GI pipe work was done by previous contractor
List of works & prices for Excavation,Earthwork & Site Clearance. Schedule A, Section IX.
PUSHKARRAJ CONSTRUCTION PRIVATE LIMITED
GANGA INFRABUILD PVT LTD
SHRE GURMUKHDAS CONTRACTOR PVT. LTD.
ANURAG ENTERPRISES
Som Projects Pvt. Ltd.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid