Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAccepted-AOC AZAMGARH CIRCLE EE BALLIA | ₹6.0 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹6.0 CrRejected-AOC ADD 86 NEAR MAHILA DAK BANGLA RAOD SADAR LAIN BAZAR KANHAIPUR DISTRICT JAUNPUR | KANHAIPUR | JAUNPUR | UTTAR PRADESH | ₹6.0 Cr | L2 | Rejected-AOC Accept |
Tender Value
₹6.0 Cr
EMD Value
₹12 L
Closing Date
14 May 2026, 2:00 pmClosed
General Manager, Zone-1, Prayagraj
General Manager, Zone-1, U. P. Projects Corporation Ltd. 230 /1A, Mehdaury, Telirayganj District-Prayagraj
Construction of Multipurpose Community Hall Ghazipur (U.P.)
2026_UPPRC_1147091_1
19/UPPCL/GM-1/E-TENDER/2026-27 Dated-24.04.2025
Open Tender
Civil Works - Buildings
Percentage
540 days
District-Ghazipur (U.P.)
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹12 L
23 Jun 2026
9 May 2026
14 May 2026
9 May 2026
14 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Multipurpose Community Hall Ghazipur (U.P.) | - | - | - | - |
| 2 | CIVIL WORK | - | - | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | CUM | 126.46 | ₹126.33 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | CUM | 139.64 | - |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 1 | CUM | 499.06 | ₹498.56 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | CUM | 4,853.07 | - |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | CUM | 1,513.02 | - |
| 8 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 (1 cement:2 coarse sand) to match the existing floor. | - | - | - | - |
| 9 | With Chlorpyriphos/ Linadane E.C. 20% with 1% concentration. | - | SQM | 220.89 | - |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BIDDOC19.pdf
Tender Documents • 21.52 MB
BOQ_2145399.xls
BOQ • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].