Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L1 | Accepted-AOC TECHNO-COMMERCIALLY ACCEPTED | |
| 2 | L2₹2.0 L+₹40,498.59 (25.0%)Rejected-Finance AT BASANTPUR PO KEDLA PS MANDU RAMGARH 825323 | MANDU | RAMGARH | JHARKHAND | 825323 | L2 | Rejected-Finance TECHNO-COMMERCIALLY REJECTED | |
| 3 | L3₹2.5 L+₹91,121.82 (56.2%)Rejected-Finance BASANTPUR KEDLA DIST RAMGARH JHARKHAND | BASANTPUR | RAMGARH | JHARKHAND | L3 | Rejected-Finance TECHNO-COMMERCIALLY REJECTED |
Tender Value
₹1.6 L
EMD Value
₹2,100
Closing Date
5 Sept 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AMRENDRA KUMAR
Kedla Washery, Hazaribagh Area, CCL
Loosening of conv. Belt 80mtr. For 02 nos. damaged joint making and head drive pulley lagging unit no. 123 and adapter shaft changing of tail and tail snub pulley and rectification unit no. 122 belt conv. main plant of Kedla Washery
2022_CCL_254191_1
PO/KW/e-Tender/22-23/67, dated 23.08.2022
Open Tender
Miscellaneous Works
Item Rate
12 days
Kedla Washery
As per NIT
2 documents required · 2 mandatory
₹2,100
16 Sept 2022
24 Aug 2022
6 Sept 2022
25 Aug 2022
5 Sept 2022
25 Aug 2022
25 Aug 2022 - 30 Aug 2022
Amount
Loosening of conv. belt 80mtrs. for two no. Damaged joint making and head drive pulley lagging unit no. 123 B/Conv. (a) Dismantling for work as above.
(b) Installation & alignment after work as above.
Adapter shaft changing of tail & tail snub pulley and rectification tail base frame along with take-up Arrangement lifting, installation and alignment of 122 belt conveyor. (a) Dismantling pulley+ take-up arrangement for works as
(b) Dismantling base frmae 90% of new (1.933MT).
(c) Fabrication & erection of base frame.
(d) Installation of pulley+ take-up arrangement after work as above.
Total impact of GST for the purpose of CTC
CHAHAT CONSTRUCTION COMPANY
TRIDEO CONSTRACTION
stage.html
html • 0.04 MB
techsummary_262766.pdf
PDF • 0.41 MB
finsummary_262766.pdf
PDF • 0.41 MB
WO69.pdf
PDF • 0.61 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .