| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.7 LAccepted-AOC N A | NA | NA | 121004 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹41.7 L+₹94,239.37 (2.31%)Rejected-Finance A 47D RAM DUTT ENCLAVE UTTAM NAGAR NEW DELHI 110059 | WEST | DELHI | 110059 | L2 | Rejected-Finance Being other than lowest | |
| 3 | L3₹45.3 L+₹4.6 L (11.3%)Rejected-Finance RAMA PARK A 121 BLOCK A UTTAM NAGAR WEST DELHI DELHI 110059 | DELHI | WEST DELHI | DELHI | 110059 | L3 | Rejected-Finance Being other than lowest |
| Sl No | Description | Qty | Unit | HANUMAN BUILDERS L3 | Vipul Construction L1 | Akhil Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in soft loose soil, complete all as specified and as directed. | 276.59 | Sqm | 25 ₹6,914.75 | 15 ₹4,148.85 Lowest | 77 ₹21,297.43 |
| 2.00 | Excavating in trenches, not exc 1.5 m wide and not exc 1.5 m in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exc 10 sq m on plan and not exc 1.5 m in depth and getting out in soft /loose soil, complete all as specified and as directed. | 110 | Cum | 250 ₹27,500 | 135 ₹14,850 Lowest | 167 ₹18,370 |
| 3.00 | M & L for Plain Cement concrete (1:4:8) Type D2 using in foundations, filling and mass concrete, complete all as specified and as directed. | 11.03 | Cum | 2,500 ₹27,575 Lowest | 3,500 ₹38,605 | 3,477 ₹38,351.31 |
| 4.00 | M &L TMT bar 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips, complete all as specified and as directed. | 5,555.53 | Kg | 93 ₹5,16,664.29 | 89 ₹4,94,442.17 | 87 ₹4,83,331.11 Lowest |
| 5.00 | Description all per item no 4.00 above, but 5mm dia and over upto and including 10mm dia in stirrups, spacers and binders, complete all as specified and as directed. | 1,903.33 | Kg | 95 ₹1,80,816.35 | 90 ₹1,71,299.7 | 87 ₹1,65,589.71 Lowest |
| 6.00 | Formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter, for fair finished flat surface, complete all as specified and as directed. | 110.9 | Sqm | 250 ₹27,725 | 295 ₹32,715.5 | 247 ₹27,392.3 Lowest |
| 7.00 | RCC M-25 design mix (20mm graded aggregates) as in fdn, including raft, footing fdn beams plinth beams bases for columns, complete all as specified and as directed. | 32.89 | Cum | 6,500 ₹2,13,785 | 295 ₹9,702.55 Lowest | 6,477 ₹2,13,028.53 |
| 8.00 | Formwork to sides of pillars, posts, struts, piers, columns and stanchions, complete all as specified and as directed. | 182.43 | Sqm | 350 ₹63,850.5 | 295 ₹53,816.85 | 247 ₹45,060.21 Lowest |
| 9.00 | RCC M-25 design mix (20mm graded aggregates) as in columns, pillars, piers, posts and struts etc, complete all as specified and as directed. | 16.73 | Cum | 7,500 ₹1,25,475 | 7,300 ₹1,22,129 | 6,477 ₹1,08,360.21 Lowest |
| 10.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm, complete all as specified and as directed. | 73.8 | Cum | 150 ₹11,070 | 75 ₹5,535 | 37 ₹2,730.6 Lowest |
Tender Value
₹43.6 L
EMD Value
₹87,210
Closing Date
11 Aug 2026, 6:00 pmClosed
GE (East) Delhi Cantt-10
GE (East) Delhi Cantt
PROVN OF COOK HOUSE AND STORAGE ACCN FOR MES IB UNDER GE EAST DELHI CANTT
2026_MES_778838_1
GE/DE-75/2026-27
Open Tender
Civil Works
Item Rate
120 days
GE (East) Delhi Cantt-10
As per NIT Document
9 documents required · 9 mandatory
₹500
GE (East) Delhi Cantt-10
₹87,210
Yes
9 Oct 2026
15 Jul 2026
13 Aug 2026
15 Jul 2026
11 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation not exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in soft loose soil, complete all as specified and as directed. | 276.59 | Sqm | 1.25 | ₹345.74 |
| 2 | Excavating in trenches, not exc 1.5 m wide and not exc 1.5 m in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exc 10 sq m on plan and not exc 1.5 m in depth and getting out in soft /loose soil, complete all as specified and as directed. | 110 | Cum | - | - |
| 3 | M & L for Plain Cement concrete (1:4:8) Type D2 using in foundations, filling and mass concrete, complete all as specified and as directed. | 11.03 | Cum | 100 | ₹1,103 |
| 4 | M &L TMT bar 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips, complete all as specified and as directed. | 5,555.53 | Kg | 10 | ₹55,555.3 |
| 5 | Description all per item no 4.00 above, but 5mm dia and over upto and including 10mm dia in stirrups, spacers and binders, complete all as specified and as directed. | 1,903.33 | Kg | 11 | ₹20,936.63 |
| 6 | Formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter, for fair finished flat surface, complete all as specified and as directed. | 110.9 | Sqm | 10 | ₹1,109 |
| 7 | RCC M-25 design mix (20mm graded aggregates) as in fdn, including raft, footing fdn beams plinth beams bases for columns, complete all as specified and as directed. | 32.89 | Cum | 22 | ₹723.58 |
| 8 | Formwork to sides of pillars, posts, struts, piers, columns and stanchions, complete all as specified and as directed. | 182.43 | Sqm | - | - |
| 9 | RCC M-25 design mix (20mm graded aggregates) as in columns, pillars, piers, posts and struts etc, complete all as specified and as directed. | 16.73 | Cum | 1.25 | ₹20.91 |
| 10 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm, complete all as specified and as directed. | 73.8 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tender75.pdf
Tender Documents • 1.35 MB
BOQ_872325.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .