Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.1 LAdmitted-Finance | -24.00% | ₹7.1 L | L1 | Admitted-Finance |
| 2 | L2₹7.2 L+₹4,621.44 (0.65%)Admitted-Finance | -28.95% | ₹7.2 L+₹4,621.44 (0.65%) | L2 | Admitted-Finance |
| 3 | L3₹7.8 L+₹65,790.69 (9.21%)Admitted-Finance | -23.95% | ₹7.8 L+₹65,790.69 (9.21%) | L3 | Admitted-Finance |
| 4 | L4₹7.8 L+₹66,484.85 (9.31%)Admitted-Finance | -23.65% | ₹7.8 L+₹66,484.85 (9.31%) | L4 | Admitted-Finance |
| 5 | L5₹8.2 L+₹1.1 L (15.3%)Admitted-Finance | -18.95% | ₹8.2 L+₹1.1 L (15.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. BAJRANG LAL AGARWAL L5 | M/s TANMAY TRADERS L2 | SUNRISE CONSTRUCTION L3 | B.R. ELECTRICALS & CONSTRUCTIONS L1 | SHREE BALAJI ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|
| .01PART- B (Item Rate Basis) | ||||||||
| 1.00 | Supply and spreading of crusher dust free of organic matter including stacking spreading and laying in yard as per standard specification including all lead and lift, Transportation, labour, loading unloading, T&P required for spreading of crusher dust work as per direction of Engineer in Charge including dressing ground upto 15cm depth. | 95 | P.Cum | 635 ₹60,325 | 500 ₹47,500 | 740 ₹70,300 | 300 ₹28,500 Lowest | 650 ₹61,750 |
| 2.00 | S, S & S of graded crusher brocken hard stone aggregate free from organic matter including stacking & spreading in yard / trenches as per the standard specification of size 40mm to 63mm incl. all lead & lift, transportation, labour, loading, unloading & require for graveling work as per direction if Engineer in charge incl. dressing & levelling. | 45 | P.Cum | 1,095 ₹49,275 | 1,000 ₹45,000 | 830 ₹37,350 | 350 ₹15,750 Lowest | 1,050 ₹47,250 |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
1 Jul 2026, 3:00 pmClosed
SE CIVIL JVVNL
SE CIVIL JVVNL OPH, RAM MANDIR BANI PARK JAIPUR
Construction of power transformer pit and renovation of yard, repair control room at 33 KV S/S Bhonawas.
2026_JVVNL_570549_24
E-NIT 01/2026-27
Open Tender
Civil Works
Percentage
60 days
Bhonawas.
Please refer Tender documents.
3 documents required · 3 mandatory
₹236
A O(JCC)JVVNL,Jaipur Through NEFT/RTGS/IMPS/UPI
₹20,000
Yes
6 Jul 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
1 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | PART-A (Bldg.) | - | - | - | - |
| 1 | (1.8)
Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter All kinds of soil. | 11 | P.Cum | 178 | ₹1,958 |
| 2 | (3.1.6)
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size). | 19 | P.Cum | 3,302 | ₹62,738 |
| 2.01 | (B) M-15 grade N.Mix ( 1 cement : 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size.) (3.1.2) | 1 | Cum | 4,624 | ₹4,624 |
| 3 | (6.1.6)
Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 14 | P.Cum | 2,838 | ₹39,732 |
| 4 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish:(A) 20mm thick. (12.3.2) | 45 | P.Sqm | 190 | ₹8,550 |
| 4.01 | (B) 12 mm thick (12.3.3) | 20 | P.Sqm | 160 | ₹3,200 |
| 5 | (12.46.1)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | 86 | P.Sqm | 69 | ₹5,934 |
| 6 | (12.22.1)
Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete New Plastered Surface (three or more coats) | 600 | P.Sqm | 84 | ₹50,400 |
| 7 | (12.37.1)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding: New work (two or more coats) over and including scrapping and priming coat with cement primer. | 400 | P.Sqm | 75 | ₹30,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.50 MB
Tendernotice_2.pdf
PDF • 2.51 MB
BOQ_1016563.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .