| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC Accept |
| 2 | L2₹4.6 LRejected-AOC | ₹4.6 L | L2 | Rejected-AOC Reject |
| 3 | Rejected-Technical 83 MUDUKKU STREET EDAKEELAIYUR NEEDAMANGALAM | MAYILADUTHURAI | TAMIL NADU | 609204 | - | - | Rejected-Technical Withdrawal Letter Sumitted |
| Sl No | Description | Qty | Unit | K ELAIYARAJA L2 | N PITCHAIPILLAY L1 |
|---|---|---|---|---|---|
| 1.001. REPAIRS TO PUE SCHOOL MANGALORE TILED BUILDING (EAST FACING) AT KARAKOTTAI PANCHAYAT | |||||
| 2.00 | Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. | 18.66 | sq.m | 7.98 ₹148.91 | 7 ₹130.62 |
| 3.00 | Dismantling damaged Chipping Concrete and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. | 116.28 | sq.m | 40.37 ₹4,694.22 | 40 ₹4,651.20 |
| 4.00 | Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. | 18.66 | sqm | 277.61 ₹5,180.20 | 277 ₹5,168.82 |
| 5.00 | Removing and fixing for Mangalore tiles including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. | 11.86 | sq.m | 94.41 ₹1,119.70 | 94 ₹1,114.84 |
| 6.00 | Best tiled roofing with Mangalore tiles,over ceiling tiles of best quality nveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. | 11.86 | sq.m | 640.44 ₹7,595.62 | 640 ₹7,590.40 |
| 7.00 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 116.28 | sq.m | 1,465.21 ₹1.7 L | 1,465 ₹1.7 L |
| 8.00 | Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete | 111.58 | sq.m | 141.27 ₹15,762.91 | 141 ₹15,732.78 |
| 9.00 | Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete | 163.18 | sq.m | 253.68 ₹41,395.50 | 253 ₹41,284.54 |
| 10.00 | Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete | 159.2 | sq.m | 145.07 ₹23,095.14 | 145 ₹23,084 |
Tender Value
₹4.7 L
EMD Value
₹4,650
Closing Date
17 Jul 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.PT)
BLOCK DEVELOPMENT OFFICE
SIUS 2025 26 REPAIRS TO PUE SCHOOL MANGALORE TILED BUILDING AND REPAIRS TO PUE SCHOOL TOILET AT KARAKOTTAI PANCHAYAT
2025_RDTN_579543_1
2540/2025/A2
Open Tender
Civil Works
NEEDAMANGALAM
SIUS 2025 26 REPAIRS TO PUE SCHOOL MANGALORE TILED BUILDING AND REPAIRS TO PUE SCHOOL TOILET AT KARAKOTTAI PANCHAYAT
3 documents required · 3 mandatory
₹0
₹4,650
23 Feb 2026
8 Jul 2025
17 Jul 2025
8 Jul 2025
17 Jul 2025
8 Jul 2025
Amount
1. REPAIRS TO PUE SCHOOL MANGALORE TILED BUILDING (EAST FACING) AT KARAKOTTAI PANCHAYAT
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dismantling damaged Chipping Concrete and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Removing and fixing for Mangalore tiles including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Best tiled roofing with Mangalore tiles,over ceiling tiles of best quality nveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Blackboard Painting two coats over oldcement plastered surface with best approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete
Provision for Bala Painting
Repairs to window.
Repairs to Door.
Provision for Fibre Board
Providing Chappal Rack Arrangements (SUB ESTIMATE)
BriCK work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Teachers Cubboard (Sub Estimate)
BriCK work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Provision for Spring Bundal
Provision for Display Board
Provision for Name Board
2.REPAIRS TO PUE SCHOOL TOILET ( NORTH FACING) AT KARAKOTTAI HABITATION IN KARAKOTTAI PANCHAYAT
Dismantling the existing Damaged wall plastering including all labour charges etc., completed
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
White washing two coats using best shell lime incluiding cost and conveynace and all labour charges etc., completed as per std., specification
Supplying and painting the walls with Two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat old iron Works including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for Door Repair
Provision for IWC
Provision for EWC
Provision for Jolly
Provision for Septic Tank Arrangements and Toilet Cleaning All Labour Charges
Provision for Water supply arrangement
Provision for Sanitary Arrangements
Supply and Fixing of Leach pit Arrangements
Towards Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K ELAIYARAJA (BID ID -1403189)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid