Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55,644.68Admitted-Finance | ₹55,644.68 | L1 | Admitted-Finance |
| 2 | L2₹57,144.21+₹1,499.53 (2.69%)Admitted-Finance | ₹57,144.21+₹1,499.53 (2.69%) | L2 | Admitted-Finance |
| 3 | L3₹58,493.43+₹2,848.75 (5.12%)Admitted-Finance | ₹58,493.43+₹2,848.75 (5.12%) | L3 | Admitted-Finance |
| 4 | L4₹64,345.81+₹8,701.13 (15.6%)Admitted-Finance | ₹64,345.81+₹8,701.13 (15.6%) | L4 | Admitted-Finance |
| 5 | L5₹64,456.30+₹8,811.62 (15.8%)Admitted-Finance | ₹64,456.30+₹8,811.62 (15.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vitthal Rambhau Jadhav L4 | SHRI JOTIRAM LAKHU BARAGE L1 | ABHISHEK BALAPPA TEJI L5 | MURGYAPPA BHIMU PATIL L2 | ARUN ANANDA DESHINGE L6 | Ms Pakiza construction L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Civil Department | |||||||||
| 1.01 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. - (Lift upto 1.5 metre) By Manual Means | 1 | CU.M | 263.1 ₹263.1 | 240 ₹240 | 263 ₹263 | 250 ₹250 | 763.73 ₹763.73 | 236.78 ₹236.78 Lowest |
| 1.02 | Hire charges for Excavator (JCB JS 140 / TATA Hitachi EX 120 or equivalent) - 0.6 Cum capacity at the site of work | 1 | HOUR | 1,839.19 ₹1,839.19 | 1,594 ₹1,594 Lowest | 1,839 ₹1,839 | 1,700 ₹1,700 | 1,840.07 ₹1,840.07 | 1,655.18 ₹1,655.18 |
| 1.03 | Providing and laying concrete pipes of Indian Standard Non Pressure class of 225 milimetre diameter in proper line, level and slope including necessary collers, excavation, laying, fixing with collers in cement mortar 1:1 and refilling the trench excetra complete. | 1 | RMT | 842.9 ₹842.9 | 730.88 ₹730.88 Lowest | 843 ₹843 | 803 ₹803 | 843.3 ₹843.3 | 758.57 ₹758.57 |
| 1.04 | Providing and laying cement concrete pipe confirming to Indian Standard 458:2003 non pressure class-2 of 450 milimetre diameter in proper line, level and slope including providng and fixing collars in cement mortar 1:2 and curing, excetra complete. | 1 | RMT | 2,182.9 ₹2,182.9 | 1,892.75 ₹1,892.75 Lowest | 2,184 ₹2,184 | 2,079 ₹2,079 | 2,183.94 ₹2,183.94 | 1,961.67 ₹1,961.67 |
| 1.05 | Providing and laying concrete pipes of Indian Standard Non Pressure class of 150 milimetre diameter in proper line level and slope including necessary collers, excavation, laying, fixing with collers in cement mortar 1:1 and refilling the trench complete. | 1 | RMT | 583.46 ₹583.46 | 505.92 ₹505.92 Lowest | 583.4 ₹583.4 | 555 ₹555 | 583.74 ₹583.74 | 525.09 ₹525.09 |
| 1.06 | Providing and laying cement concrete pipe of Indian Standard 458:2003 non pressure class-3 of 600 milimetre diameter in proper line, level and slope excetra complete. | 1 | RMT | 5,372.96 ₹5,372.96 | 4,658.79 ₹4,658.79 Lowest | 5,372.9 ₹5,372.9 | 4,696.68 ₹4,696.68 | 5,375.52 ₹5,375.52 | 4,835.41 ₹4,835.41 |
| 1.07 | Providing and laying cement concrete pipe of Indian Standard 458:2003 non pressure class-3 of 900 milimetre diameter in proper line, level and slope excetra complete. | 1 | RMT | 9,280.09 ₹9,280.09 | 8,046 ₹8,046 Lowest | 9,280 ₹9,280 | 8,112.53 ₹8,112.53 | 9,284.52 ₹9,284.52 | 8,351.64 ₹8,351.64 |
| 1.08 | Supplying reinforced cement concrete Pipe 450 milimetre diameter (NP3) 2.5 metre long at the site of work. | 1 | RMT | 2,361.68 ₹2,361.68 | 2,047.77 ₹2,047.77 Lowest | 2,360 ₹2,360 | 2,092 ₹2,092 | 2,367.81 ₹2,367.81 | 2,125.4 ₹2,125.4 |
| 1.09 | Supplying reinforced cement concrete Pipe 700 milimetre diameter (NP3) 2.5 metre long at the site of work. | 1 | RMT | 4,683.97 ₹4,683.97 | 4,061.32 ₹4,061.32 Lowest | 4,681 ₹4,681 | 4,094 ₹4,094 | 4,686.2 ₹4,686.2 | 4,215.35 ₹4,215.35 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
5 Aug 2026, 3:00 pmClosed
add. commissioner
Ichalkaranji Municipal Corporation, Ichalkaranji.
1. Laying cross pipes in Ichalkaranji Municipal Corporation area.
2026_IMC_1322648_1
civil/08/2026-27
Open Tender
Pipe Laying Works
Item Rate
365 days
Ichalkaranji
please refer tender notice mention document
2 documents required · 2 mandatory
₹10,000
₹50,000
10 Sept 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Department | |||||
| 1.01 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. - (Lift upto 1.5 metre) By Manual Means | - | CU.M | 250.7 | - |
| 1.02 | Hire charges for Excavator (JCB JS 140 / TATA Hitachi EX 120 or equivalent) - 0.6 Cum capacity at the site of work | - | HOUR | 1,752.45 | - |
| 1.03 | Providing and laying concrete pipes of Indian Standard Non Pressure class of 225 milimetre diameter in proper line, level and slope including necessary collers, excavation, laying, fixing with collers in cement mortar 1:1 and refilling the trench excetra complete. | - | RMT | 803.15 | - |
| 1.04 | Providing and laying cement concrete pipe confirming to Indian Standard 458:2003 non pressure class-2 of 450 milimetre diameter in proper line, level and slope including providng and fixing collars in cement mortar 1:2 and curing, excetra complete. | - | RMT | 2,079.95 | - |
| 1.05 | Providing and laying concrete pipes of Indian Standard Non Pressure class of 150 milimetre diameter in proper line level and slope including necessary collers, excavation, laying, fixing with collers in cement mortar 1:1 and refilling the trench complete. | - | RMT | 555.95 | - |
| 1.06 | Providing and laying cement concrete pipe of Indian Standard 458:2003 non pressure class-3 of 600 milimetre diameter in proper line, level and slope excetra complete. | - | RMT | 5,119.55 | - |
| 1.07 | Providing and laying cement concrete pipe of Indian Standard 458:2003 non pressure class-3 of 900 milimetre diameter in proper line, level and slope excetra complete. | - | RMT | 8,842.4 | - |
| 1.08 | Supplying reinforced cement concrete Pipe 450 milimetre diameter (NP3) 2.5 metre long at the site of work. | - | RMT | 2,250.3 | - |
| 1.09 | Supplying reinforced cement concrete Pipe 700 milimetre diameter (NP3) 2.5 metre long at the site of work. | - | RMT | 4,463.05 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
otherdocument.pdf
Other Document • 0.74 MB
BOQ_2265788.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .