| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.8 CrAccepted-AOC 402 3RD FLOOR DEV PALACE M G ROAD KARUR 639 001 | KARUR | TAMIL NADU | 639001 | ₹74.8 Cr Quoted ₹76.8 Cr | L1 | Accepted-AOC Lowest Value Quoted by M/s.Samri Infra Developers has been awarded the contract |
| 2 | L2₹78.1 Cr+₹1.3 Cr (1.64%)Rejected-Finance | ₹78.1 Cr+₹1.3 Cr (1.64%) | L2 | Rejected-Finance Comparatively Higher price |
| 3 | L3₹79.5 Cr+₹2.7 Cr (3.48%)Rejected-Finance | ₹79.5 Cr+₹2.7 Cr (3.48%) | L3 | Rejected-Finance Comparatively Higher price |
Tender Value
₹74.8 Cr
EMD Value
₹37.5 L
Closing Date
21 Feb 2026, 3:00 pmClosed
SE(NH)Chennai
O/o Superintending Engineer (NH) Chennai
Widening from Two Lane to Four Lane and strengthening from km 10/0 20/0 of Polur Chengam Road (SH-133) including construction of center Median, construction of additional High Level of Bridge at km 11/4, Widening of Box Culverts at km 10/6, 10/8,
2026_MoRTH_898430_1
TN.No.24/NH/2025-26/Dated 13.02.2026 (IInd Call)
Open Tender
Civil Works - Roads
Percentage
540 days
Vilvarani
As per tender documents
5 documents required · 5 mandatory
₹17,700
As per Tender Documents
₹37.5 L
SE(NH)Chennai
23 Mar 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
21 Feb 2026
13 Feb 2026
13 Feb 2026 - 16 Feb 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Picking 5cm to 10cm old metalled surface and sectioning and clearing away from the site and depositing the debris including labour charges for picking etc., complete as directed by the Engineer as per standard specification and also as per MORTH No.111,112,202 | 24,899.15 | Square Metre | 23.36 | ₹5,81,644.14 |
| 2 | EARTH WORK FOR BOXING INCL: CONVEYANCE OF CUT EARTH -Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification. For Boxing including conveyance of cut earth away from the site with average lead | 15,359.94 | Cubic Metre | 143.68 | ₹22,06,916.18 |
| 3 | EARTH WORK FOR EMBANKMENT USING CUT EARTH: Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers. | 12,185.89 | Cubic Metre | 28.13 | ₹3,42,789.09 |
| 4 | EARTH WORK FOR EMBANKMENT USING CUT EARTH USING CARTED EARTH - Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification. For formation of embankment / making up of low berms with conveyance | 50,047.57 | Cubic Metre | 194.8 | ₹97,49,266.64 |
| 5 | GRANULAR SUB BASE GRADE V -Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 401 of MORTH Rev-5 - for Grading- V Material. | 14,939.52 | Cubic Metre | 2,130.16 | ₹3,18,23,567.92 |
| 6 | GRANULAR SUB BASE GARDE III - Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 401 of MORTH Rev-5 - for Grading- III Material. | 8,649.91 | Cubic Metre | 2,403.19 | ₹2,07,87,377.21 |
| 7 | WET MIX MACADAM - Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. | 36,083.59 | Cubic Metre | 2,600.83 | ₹9,38,47,283.38 |
| 8 | Prime Coat Over WBM/ WMM Surface - Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 | 1,51,038.18 | Square Metre | 88.72 | ₹1,34,00,107.33 |
| 9 | Tack Coat Over Primed Surface - Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 1,51,038.18 | Square Metre | 20.81 | ₹31,43,104.53 |
| 10 | Tack Coat Over Concrete Surface: Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1)per 10 sqm for preparatory to another bituminous construction over it including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 1,290.3 | Square Metre | 23.58 | ₹30,425.27 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Polur.rar
Tender Documents • 28.28 MB
BOQ_944339.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .