Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 3 19A AGRAHARAM KARUKUDI RAYAMPETTAL POST THIRUVALYARU 613 204 | THIRUVALYARU | THANJAVUR | TAMIL NADU | 613204 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7.5 L
EMD Value
₹7,490
Closing Date
9 Feb 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer .VP
Block Development Office,Thiruvaiyaru ,Thanjavur
Repaire to libray in Allur Ammayagaram Vinnamangalam Mannarsamudhiram Karuppur and Kalyanapuram I sethi panchayat
2022_RDTN_222265_1
Rc.No.200/B4/2022 dated 21.01.2022.
Open Tender
Civil Works
Item Rate
60 days
Block Development Office, Thiruvaiyaru
As per Tender bid document.
9 documents required · 9 mandatory
₹0
₹7,490
Yes
24 Aug 2023
3 Feb 2022
9 Feb 2022
3 Feb 2022
9 Feb 2022
3 Feb 2022
90 days
Amount
Repairs Library Building in Allur , Ammaiyagaram , Vinnamangalam , Mannarsamudhiram Karupur , Kalyanapuram I sethi Panchayat .
Part-01 Renovation of Libary building and Construction of Toilet Building at Allur Panchayat
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
Pointing with cement mortar 1:3 to full depth of tiles, pressed tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
White washing with two coats including cost and conveyance of all materials and labour charges etc., Complete
Distembering painting with two coats including cost and conveyance of all materials and labour charges etc., Complete.
Exterior emulsion painting with two coats of including cost & conveyance & Labour charges etc, Complete.,.
Painting with two coats of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,
Electrification Charges
Supply and fixing Tuble light
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with1meter down rod on the existing clamp (SD 107)
Construction of Toilet
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20A
Sand filling with river sand including cost& conveyence and labour charges etc complete
CC 1:4:8 Mix using 40mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix using countri Bricks including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix using countri Bricks including all cost and conveyence and labour charges etc complete.
Supply and errection of steel centring including all cost and conveyence and labour charges etc complete.
Supply and febrication of steel including all cost and conveyence and labour charges etc complete.
RCC 1:1.5:3 Mix using 20mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Plastering with cm 1:5 mix 12mm thick including all cost and conveyence and labour charges etc complete.
Plastering with cm 1:3 mix 10mm thick including all cost and conveyence and labour charges etc complete.
Paving with flooring tiles including all cost and conveyence and labour charges etc complete
Distembering two coats with approved colour including all cost and conveyence and l;abour charges etc complete.
Painting two coats for good new iron including all cost and conveyence and labour charges etc complete.
Towords cost and supply of steel door 0.75x1.80
Cost and supply of RCC Rings with cover
Cost and supply of Rcc jolley
Supply of Iwc
110mm dia pvc pipe and fittings
Construction of Ramp
Earth work excavation and depositing on bank with inial lead and lift including all cost and conveyence and labour charges etc complete.
Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix (one cement and five sand ) using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Providing gronalith flooring in cc 1:2:4 mix using 10-12mm chips including all charges etc complete
Plastering with cm 1:5 mix 12mm thick including all cost and conveyence and labour charges etc complete.
Provision for Hand rail (2 sides)
PLINTH PROTECTION
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Sand filling with river sand including all cost and conveyence and labour charges etc complete.
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Providing gronalithic flooring in cc 1:2:4 mix using 10-12mm chips including all charges etc complete.
Brick work in cm 1:5 mix using countri bricks including all charges etc complete.
Plastering with cm 1:5 mix using 12mm thick including all cost and conveyence and labour charges etc complete.
Repairs Door and windown ncluding all cost and conveyence and labour charges etc complete.
Provision for Name board charges & photo charges
Part-02 Renovation of Libary building and Construction of Toilet Building at Ammayagaram Panchayat .
Earth work excavation and depositing on bank with inial lead and lift including all cost and conveyence and labour charges etc complete.
Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix (one cement and five sand ) using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Plastering with cm 1:5 mix 12mm thick including all cost and conveyence and labour charges etc complete.
Pointing with cement mortar 1:3 to full depth of tiles, pressed tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
White washing with two coats including cost and conveyance of all materials and labour charges etc., Complete
Supply and laying of paving the floor with sdratch proof ceramic tiles including cost & conveyance, labour charges etc..,
Distembering painting with two coats including cost and conveyance of all materials and labour charges etc., Complete.
Exterior emulsion painting with two coats of including cost & conveyance & Labour charges etc, Complete.,.
Painting with two coats of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,
Electrification Charges
Supply and fixing of Tube light
Construction of Toilet
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20A
Sand filling with river sand including cost& conveyence and labour charges etc complete
CC 1:4:8 Mix using 40mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix using countri Bricks including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix using countri Bricks including all cost and conveyence and labour charges etc complete.
Supply and errection of steel centring including all cost and conveyence and labour charges etc complete.
Supply and febrication of steel including all cost and conveyence and labour charges etc complete.
RCC 1:1.5:3 Mix using 20mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Plastering with cm 1:5 mix 12mm thick including all cost and conveyence and labour charges etc complete.
Plastering with cm 1:3 mix 10mm thick including all cost and conveyence and labour charges etc complete.
Paving with flooring tiles including all cost and conveyence and labour charges etc complete
Distembering two coats with approved colour including all cost and conveyence and l;abour charges etc complete.
Painting two coats for good new iron including all cost and conveyence and labour charges etc complete.
Towords cost and supply of steel door 0.75x1.80
Cost and supply of RCC Rings with cover
Cost and supply of Rcc jolley
Supply of Iwc
110mm dia pvc pipe and fittings
Repairs Door and windown ncluding all cost and conveyence and labour charges etc complete.
Provision for Name board charges & photo charges
Part-03 Renovation of Libary building at Vinnamangalam Panchayat .
Earth work excavation and depositing on bank with inial lead and lift including all cost and conveyence and labour charges etc complete.
Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix (one cement and five sand ) using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Plastering with cm 1:5 mix 12mm thick including all cost and conveyence and labour charges etc complete.
Pointing with cement mortar 1:3 to full depth of tiles, pressed tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
White washing with two coats including cost and conveyance of all materials and labour charges etc., Complete
Supply and laying of paving the floor with sdratch proof ceramic tiles including cost & conveyance, labour charges etc..,
Distembering painting with two coats including cost and conveyance of all materials and labour charges etc., Complete.
Exterior emulsion painting with two coats of including cost & conveyance & Labour charges etc, Complete.,.
Painting with two coats of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,
Electrification Charges
Supply and fixing of Tuble light
Construction of Toilet
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20A
Sand filling with river sand including cost& conveyence and labour charges etc complete
CC 1:4:8 Mix using 40mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix using countri Bricks including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix using countri Bricks including all cost and conveyence and labour charges etc complete.
Supply and errection of steel centring including all cost and conveyence and labour charges etc complete.
Supply and febrication of steel including all cost and conveyence and labour charges etc complete.
RCC 1:1.5:3 Mix using 20mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Plastering with cm 1:5 mix 12mm thick including all cost and conveyence and labour charges etc complete.
Plastering with cm 1:3 mix 10mm thick including all cost and conveyence and labour charges etc complete.
Paving with flooring tiles including all cost and conveyence and labour charges etc complete
Distembering two coats with approved colour including all cost and conveyence and l;abour charges etc complete.
Painting two coats for good new iron including all cost and conveyence and labour charges etc complete.
Towords cost and supply of steel door 0.75x1.80
Cost and supply of RCC Rings with cover
Cost and supply of Rcc jolley
Supply of Iwc
110mm dia pvc pipe and fittings
PLINTH PROTECTION
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Sand filling with river sand including all cost and conveyence and labour charges etc complete.
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Providing gronalithic flooring in cc 1:2:4 mix using 10-12mm chips including all charges etc complete.
Brick work in cm 1:5 mix using countri bricks including all charges etc complete.
Plastering with cm 1:5 mix using 12mm thick including all cost and conveyence and labour charges etc complete.
Construction of Ramp
Earth work excavation and depositing on bank with inial lead and lift including all cost and conveyence and labour charges etc complete.
Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix (one cement and five sand ) using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Providing gronalith flooring in cc 1:2:4 mix using 10-12mm chips including all charges etc complete
Plastering with cm 1:5 mix 12mm thick including all cost and conveyence and labour charges etc complete.
Provision for Hand rail (2 sides)
Provision for Repairs door and windos
Provision for Name board charges & photo charges
Part-04 Renovation of Libary building and Construction of Toilet Building at Mannarsamudhiram Panchayat .
Dismantling the damaged Flooring including cost & conveyance, labour charges etc..,
Dismantling the Pressed tiles including cost and conveyance, labour charges etc..,.
Providing gronalith flooring in cc 1:2:4 mix using 10-12mm chips including all charges etc complete
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm etc., complete
White washing with two coats including cost and conveyance of all materials and labour charges etc., Complete
Distembering painting with two coats including cost and conveyance of all materials and labour charges etc., Complete.
Exterior emulsion painting with two coats of including cost & conveyance & Labour charges etc, Complete.,.
Painting with two coats of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,
Repairs to steel doors and windows including welding and fixing cost & conveyance etc., complete as per standard specification
Electrification Charges
Supply and fixing of fancy glass shade and 11W CFL for BH point (SD 80)
Supply and fixing of Tube light
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with1meter down rod on the existing clamp (SD 107)
Construction of Toilet
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20A
Sand filling with river sand including cost& conveyence and labour charges etc complete
CC 1:4:8 Mix using 40mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix using countri Bricks including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix using countri Bricks including all cost and conveyence and labour charges etc complete.
Supply and errection of steel centring including all cost and conveyence and labour charges etc complete.
Supply and febrication of steel including all cost and conveyence and labour charges etc complete.
RCC 1:1.5:3 Mix using 20mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Plastering with cm 1:5 mix 12mm thick including all cost and conveyence and labour charges etc complete.
Plastering with cm 1:3 mix 10mm thick including all cost and conveyence and labour charges etc complete.
Paving with flooring tiles including all cost and conveyence and labour charges etc complete
Distembering two coats with approved colour including all cost and conveyence and l;abour charges etc complete.
Painting two coats for good new iron including all cost and conveyence and labour charges etc complete.
Towords cost and supply of steel door 0.75x1.80
Cost and supply of RCC Rings with cover
Cost and supply of Rcc jolley
Supply of Iwc
110mm dia pvc pipe and fittings
Provision for Name board charges & photo charges
Part-05 Renovation of Libary building at Karuppur Panchayat .
Dismantling the Pressed tiles including cost and conveyance, labour charges etc..,.
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm etc., complete
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
White washing with two coats including cost and conveyance of all materials and labour charges etc., Complete
Distembering painting with two coats including cost and conveyance of all materials and labour charges etc., Complete.
Exterior emulsion painting with two coats of including cost & conveyance & Labour charges etc, Complete.,.
Painting with two coats of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,
Electrification Charges
Tube light
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with1meter down rod on the existing clamp (SD 107)
Supply and fixing of fancy glass shade and 11W CFL for BH point (SD 80)
Repairs for doors and windows
Provision for Name board charges & photo charges
Part-06 Renovation of Libary building at Kalyanapuram I sethi Panchayat .
Clean and removal of plastering from wall iincluding cost and conveyance, labour charges etc.
Pointing with cement mortar 1:3 to full depth of tiles, pressed tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Dismantling the Doors and windows including cost and conveyance, labour charges etc..,.
White washing with two coats including cost and conveyance of all materials and labour charges etc., Complete
Distembering painting with two coats including cost and conveyance of all materials and labour charges etc., Complete.
Exterior emulsion painting with two coats of including cost & conveyance & Labour charges etc, Complete.,.
Painting with two coats of New iron work paint including cost & conveyance of all materials and all labour charges for etc, Complete.,
Painting with two coats of old iron work paint including cost & conveyance of all materials and all labour charges for etc, Complete.,
Cost and supply of steel door includingcost and conveyance of all materials to site and all labour charges etc complete
Cost and supply of steel door includingcost welding fixing conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc complete
Electrification Charges
WT bulk head fitting for 11 W CFL SD 84
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with1meter down rod on the existing clamp (SD 107)
PLINTH PROTECTION
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Sand filling with river sand including all cost and conveyence and labour charges etc complete.
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Providing gronalithic flooring in cc 1:2:4 mix using 10-12mm chips including all charges etc complete.
Brick work in cm 1:5 mix using countri bricks including all charges etc complete.
Plastering with cm 1:5 mix using 12mm thick including all cost and conveyence and labour charges etc complete.
Construction of Ramp
Earth work excavation and depositing on bank with inial lead and lift including all cost and conveyence and labour charges etc complete.
Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyence and labour charges etc complete.
Brick work in cm 1:5 mix (one cement and five sand ) using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Providing gronalith flooring in cc 1:2:4 mix using 10-12mm chips including all charges etc complete
Plastering with cm 1:5 mix 12mm thick including all cost and conveyence and labour charges etc complete.
Provision for Hand rail (2 sides)
Repairs for doors and windows
Provision for Name board charges & photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
GUNASEKARAN SATHANANTHAM
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .