Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC | ₹2.7 Cr | L1 | Accepted-AOC Accepted due to L1 |
| 2 | L2₹3.1 Cr+₹43 L (16.1%)Rejected-AOC | ₹3.1 Cr+₹43 L (16.1%) | L2 | Rejected-AOC Rejected due to L2 |
| 3 | L3₹3.8 Cr+₹1.1 Cr (40.8%)Rejected-AOC E 1032 RAJENDER NAGAR NEAR K K HOSPITAL RAJENDER NAGAR BAREILLY UTTAR PRADESH 243122 | BAREILLY | UTTAR PRADESH | 243122 | ₹3.8 Cr+₹1.1 Cr (40.8%) | L3 | Rejected-AOC Rejected due to L3 |
| 4 | Rejected-Technical 2759 12 TIMBER MARKET AMBALA HARYANA 133001 | AMBALA | HARYANA | 133001 | - | - | Rejected-Technical Documents is not submiited by the firm as per term and condition of bid. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Documents is not submiited by the firm as per term and condition of bid. |
Tender Value
Refer Docs
EMD Value
₹7.9 L
Closing Date
11 Jul 2024, 6:00 pmClosed
CO 106 Engr Regt
106 Engr Regt PIN-914106 C/o 56 APO
Supply and Construction of Foot Bridge 125 Mtr
2024_ARMY_661363_1
900/RFP/24-25/04/Op Wks
Open Tender
Construction Works
Works
210 days
H Kona Jammu J and K
As per tender documents, RPF and NIT
2 documents required · 2 mandatory
₹0
₹7.9 L
Yes
H Kona Jammu J and K
2 Sept 2024
22 Jun 2024
13 Jul 2024
22 Jun 2024
11 Jul 2024
24 Jun 2024
22 Jun 2024 - 5 Jul 2024
29 Jun 2024
Electrical Items :
Turnkey project for Supply and Construction of 125 mtr Passenger cum Material Foot Bridge having capacity of 10 person/1000kg at a time at identified location. Upon completion, the same shall be handed over to Commanding Officer 106 Engineer Regiment in fully operational condition. Maintenance and supervision during operation including provision of necessary spares/store for maintenance for a period of three years shall be provided by supplier at cost and risk of supplier from the date of commissioning of Foot Bridge. Note: - (a) The Far Bank where the farther end of the foot bridge is to be constructed is an island which is approachable only through water channel of the River. Preliminary visit and reconnaissance of the site proposed for construction of the Foot Bridge shall be carried out prior to bidding to familiarize the vendor with typical transport requirement along with indenting and user representatives. Detailed technical Pre Bid meeting for detailed technical discussion will be held to understand the user requirements to finalize a sound and effective Foot Bridge which would cater for trouble-free material handling operations and movement of personnel to and fro across the river. (b) The unsuccessful bidders shall not to claim the expenses for site visit and the same shall be borne by themselves.
Tawi Enterprises
TRANS ALTITUDE PVT LTD
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .