| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-AOC | L1 | Accepted-AOC L1 agency | |
| 2 | L2₹18.7 L+₹60,107.80 (3.33%)Rejected-AOC | L2 | Rejected-AOC Rejected due to L2 Agency | |
| 3 | L3₹20.6 L+₹2.6 L (14.2%)Rejected-AOC | L3 | Rejected-AOC Rejected due to L3 Agency | |
| 4 | L4₹21.5 L+₹3.4 L (19.0%)Rejected-AOC | L4 | Rejected-AOC Rejected due to L4 Agency | |
| 5 | L5₹21.8 L+₹3.7 L (20.7%)Rejected-AOC | L5 | Rejected-AOC Rejected due to L5 Agency |
Tender Value
₹21.3 L
EMD Value
₹44,000
Closing Date
1 Jul 2020, 5:00 pmClosed
Executive Engineer
Executive Engineer PD2 PWDBandR Sirsa
Providing IPB on Rania Link road Km.0.00 to 0.40 Road ID 5946 in SirsaDistt.
2020_HRY_132985_1
Providing IPB on Rania Link road Km.0.00 to 0.40 (
Open Tender
Civil Works - Roads
Item Wise
120 days
sirsa
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer PD2 PWDBandR Sirsa
₹44,000
Yes
17 Aug 2020
23 Jun 2020
2 Jul 2020
23 Jun 2020
1 Jul 2020
23 Jun 2020
Amount
Civil work
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I:- The unutilized quantity of reclaimed bituminous mix material shall be a recovery item as mention in BOQ item No.
Dismantling cement concrete plain 1:2:4 mix (HSR 8.6(d)) Removal of existing C.C Block 150mm thick
Providing & laying 75mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Manufacturing, supplying and laying of precast cement concrete rectangular block (0.45 M x 0.30 M x 0.15 M ) M-30 grade using minimum cement concrete 320 Kg/ per cum with digital batching plant duly compacted with table vibration including setting in position over bed prepared with 25mm thick fine sand and filling up the joints with fine sand (NS)
Providing and laying 80mm thick ISI marked interlocking paver blocks confirming to IS: 15658:2006/IRC SP 63-2004 of all shapes and colours in design mix cement M-40 over a bed of 30 mm thick fine sand complete in all respects. [HSR 10.159]
Reinforced cement concrete1:2:4 village board oif standard design, fixed in position including finishing painting (HSR 10.130+16.76(b))
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.(NS)
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Scarified Material @ 1200/-Cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
Nirmal Singh contractor
THE MANDI ADAMPUR GOLDEN L AND C SOCIETY LTD
Ms Bhambhu builders contractor and supplier
Yashpal Contractor
Anil Kumar Contractor
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .