Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.6 L+₹2,448 (0.16%)Rejected-AOC 15 3 625017 | MADURAI | TAMIL NADU | 625017 | L2 | Rejected-AOC L2 |
Tender Value
₹16.4 L
EMD Value
₹16,410
Closing Date
4 Jan 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commissioner Madurai Corporation
Aringar anna maligai
Maintanance and repair work in Alangulam over head tank Ganapathi nagar 2nd street at ward no 17
2023_MAWS_402270_1
E1 / Est.No. 292 / 23-24
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹16,410
24 Jan 2024
21 Dec 2023
4 Jan 2024
21 Dec 2023
4 Jan 2024
21 Dec 2023
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-18-SL No:1
Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDU-CORP-BUILDING DATA-P-21-SL No:10
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides)
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2.
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in G.F
Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete For Super Structure in Ground Floor.
Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306)
Providing two legged scaffolding using suitable sizes of casurina posts of 1.50 cm over all length 3 m height + 0 . 5 0 lap ) The distance between the two rows being 2 m and the spacing of posts being 2 m in both rows with two horizontal posts with 0.50 m . over lap on either side and braces at 2m C / C including longitudinal and transwere middle of 40mm thick and 1m width etc. in complete shape using coir and nail sand as directed by the Departmental Officers.
Painting one coat with White cement for Priming coat in all floors including cost of lime and other materials brushes scaffolding charges etc.complete complying with standard specification and as directed.-100sq.m S.I.333
Painting 2 coats with approved cement paint over cement plastered wall surface, ceiling and other new surface and including cleaning, preparing the surface and curing etc., complete.
Painting with Ready Mixed Enamel Paint over the new Iron works of approved quality and colour with priming coat including the cost all materials etc.,complete, in all floors.
Add GST 18%
BALAJI CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .