Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance HOUSE NO 7 GALI NO 15 FIRDOUSABAD BATAMALOO MAHARAJPORA SRINAGAR JAMMU KASHMIR 190009 UDYAM JK 21 0002876 | SRINAGAR | JAMMU AND KASHMIR | 190009 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical does not qualify |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
23 Dec 2022, 2:00 pmClosed
Executive Engineer MHCHD, Srinagar
Office of the Executive Engineer, MHCHD, Srinagar
Operation and Comprehensive Maintenance Contract of Central Heating system for the year 2022-23 for Guest House west Church Lane , Sonwar , Srinagar
2022_PWDJK_199998_2
MHCHD/TS /2022-23/172/e-tendering Dt17-12-2022
Open Tender
Repair and Maintenance Works
Item Wise
70 days
Guest House West, Sonwar Srinagar
As Detailed in NIT
4 documents required · 4 mandatory
₹200
Executive Engineer MHCHD, Srinagar
₹3,000
26 Dec 2022
17 Dec 2022
23 Dec 2022
17 Dec 2022
23 Dec 2022
18 Dec 2022
Amount
Operation and Comprehensive Maintenance Contract (CMC) of Central Heating System installed at Guest House, West, Church Lane, Srinagar of Hospitality & Protocol Department for the year 2022-23. The Job also includes operation of Central Heating System for a period of 2.5 months (24-12-2022 to 15-03-2022) for the year 2022-23 which comprises of:
Providing of skilled operators ( one person per shift) for operating Central Heating System round the clock as per Labour Law ( to be paid in full irrespective of No. of days for which Central Heating will run)
Servicing of Central Heating System including boilers and radiators. The job includes replacement of defective refractory, seals, gaskets, asbestos rope, asbestos felt, asbestos sheet, defective nuts and bolts etc. The tools & tackles required for the job and any other consumable shall be provided by the contractor before commencement of Central Heating System.
Comprehensive Maintenance Contract (CMC) of Central Heating System for a period of 2.5 Months for the year 2022-23 which comprises of : i Provision of various consumables like Dohti Cloth,Grease, Insulation tapes ,gland packing etc necessary during smooth operation of central Heating. ii Provision of replacement of various spares like electrodes photocells, nozzles,oil pumps, sequence controller damaged during the period etc iii Provision of replacement of various capacities of contactors, Relays ,Timers ,Fuses etc for panel and sub-Panel damaged during the period. iv Provision for over hauling of raw pumps,oil transfer pumps,circulation pumps etc of various capacities damaged during the period. v Provision for servicing of electrical motors of various capacities including impregnation ,varnishing damaged during the period. vi The job is exclusive of any major replacement of equipments of the central heating system such as Boilers, Mixing tank, Radiators, Sequence Controllers, Transformer, etc.
ideaxa infratech pvt ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .