Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹14.4 L+₹1.7 L (12.9%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹15.0 L+₹2.3 L (17.8%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹16.0 L+₹3.2 L (25.2%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | jaffer hussain L3 | MOHD JAMEEL L4 | SAFEENA BEGUM L1 | ARIF HUSSAIN L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Wooden foot bridge 2 No of 35 ft span Earth work in excavation by manual means overareas(Exceeding 30 Cm and upto1.5mtr in depth,
1.5mtr in width as well as10 sqm.on plan) including disposal of excavated earth upto 1mtr from
cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 9.52 | Cum | 500 ₹4,760 | 600 ₹5,712 | 467 ₹4,445.84 Lowest | 500 ₹4,760 |
| 2.00 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah | 14.95 | Cum | 2,800 ₹41,860 | 1,200 ₹17,940 | 3,000 ₹44,850 | 1,000 ₹14,950 Lowest |
| 3.00 | Extraction , transportation and Labour of Wood for making Wooden Foot Bridge ofSpan35 ft
complete job as per directed by the site incharge Engage 4 Carpenter for 20 days for making 2 foot bridge of Span 35 ft | 80 | No | 50 ₹4,000 Lowest | 1,000 ₹80,000 | 800 ₹64,000 | 700 ₹56,000 |
| 4.00 | Engage 8 Labour for 20 days for making 2 foot bridge of Span 35 ft | 160 | No | 350 ₹56,000 Lowest | 1,100 ₹1,76,000 | 500 ₹80,000 | 1,000 ₹1,60,000 |
| 5.00 | Providing and fixing of Nails | 30 | Kg | 500 ₹15,000 | 80 ₹2,400 Lowest | 130 ₹3,900 | 80 ₹2,400 Lowest |
| 6.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.
Two or more coats on new workover an under coat of suitable shade with ordinary paint of
approved brand and manufacture. | 71.56 | Sqm | 260 ₹18,605.6 | 200 ₹14,312 | 180 ₹12,880.8 | 100 ₹7,156 Lowest |
| 7.00 | Carriage of materials from source to site of work Stone av. Distance HL 500 mtr | 14.95 | Cum | 1,017 ₹15,204.15 | 500 ₹7,475 | 600 ₹8,970 | 400 ₹5,980 Lowest |
| 8.00 | Construction of Path 11000 FT Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not
exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan,
depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed
earth to be levelled and neatly dressed in all kinds of soil | 451.71 | Cum | 300 ₹1,35,513 Lowest | 800 ₹3,61,368 | 400 ₹1,80,684 | 500 ₹2,25,855 |
| 9.00 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone. | 55.76 | Cum | 1,500 ₹83,640 | 900 ₹50,184 Lowest | 2,800 ₹1,56,128 | 900 ₹50,184 Lowest |
| 10.00 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. | 543.68 | Sqm | 400 ₹2,17,472 | 30 ₹16,310.4 Lowest | 283.49 ₹1,54,130.56 | 200 ₹1,08,736 |
Tender Value
₹15 L
EMD Value
₹45,000
Closing Date
16 Dec 2025, 4:00 pmClosed
Wildlife Warden Chenab Division,Kishtwar.
Kishtwar
Construction of Track route in Kibbar Village to Bramsar including construction of path, foot bridges, shelter shed and Tenting sites. (Kibber catchment) Under Mitigation Plan , Wildlife Division Kishtwar for the Year 2025-26.
2025_FD_296529_2
NIT 36 OF 2025-26 TRACK ROUTE KIBBAR TO BRAMHSAR
Open Tender
Civil Works
Item Wise
100 days
Kibar, Dachhan
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Wildlife Warden Chenab Division,Kishtwar.
₹45,000
17 Dec 2025
10 Dec 2025
17 Dec 2025
10 Dec 2025
16 Dec 2025
10 Dec 2025
Amount
Wooden foot bridge 2 No of 35 ft span Earth work in excavation by manual means overareas(Exceeding 30 Cm and upto1.5mtr in depth, 1.5mtr in width as well as10 sqm.on plan) including disposal of excavated earth upto 1mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah
Extraction , transportation and Labour of Wood for making Wooden Foot Bridge ofSpan35 ft complete job as per directed by the site incharge Engage 4 Carpenter for 20 days for making 2 foot bridge of Span 35 ft
Engage 8 Labour for 20 days for making 2 foot bridge of Span 35 ft
Providing and fixing of Nails
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new workover an under coat of suitable shade with ordinary paint of approved brand and manufacture.
Carriage of materials from source to site of work Stone av. Distance HL 500 mtr
Construction of Path 11000 FT Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil
Dry random rubble masonry with hard stone in foundation and plinth With bond stone.
Dry stone pitching, 225mm thick, including cost of stones and preparation of surface.
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil.
Carriage of materials from source to site of work by M.T. Stone av. Distance HL 500 mtr
CONSTRUCTION OF SHELTER SHED 24'x16' Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying River Bed Material in layer not exceeding 20 cm in depth incuding spreading rolling ,watering and compacting in with power road roller 8 to 10 ton power capacity road roller complete job
Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations: footings, bases of columns etc. for mass concrete
Strctural steel work in single section fixed without connecting plate including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Engage 3 Carpenter for 20 days for making Shelter Shed
Engage 9 Labour for 20 days for making Shelter Shed
Providing and fixing of Nails
Providing corrugated Colour Coated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required 0.63mm thick with zinc coating not less than 275 gram/m2 including all leads lift carriage complete job
Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete0.50 mm thick with zinc coating not less than 275 gram/m2
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand . : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 50 mmthick with 20mm nominal size stone aggregate. (a) Crushed.
Carriage of materials from source to site of work by M.T. Sand av. 40 KM and HL 10 Km
Bajri av. 40 KM and HL 10 Km
Cement av. 40 KM and HL 10 Km
ARIF HUSSAIN (BID ID -2671638)
jaffer hussain (BID ID -2671687)
MOHD JAMEEL (BID ID -2671753)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
BOQ_965178.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .