| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L1₹8.4 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 3 | L3₹8.6 LAccepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.1 L
EMD Value
₹10,000
Closing Date
27 Mar 2024, 5:00 pmClosed
se edc
sonbhadra
Electrification Work
2024_PVVNV_911659_1
137/edc(so)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹1,180
SE EDC SONEBHADRA Bank A/c No.089105000853
₹10,000
26 Apr 2024
6 Mar 2024
28 Mar 2024
6 Mar 2024
27 Mar 2024
6 Mar 2024
Centralized Materials of following materials as per RESSPO/PuVVNL norms at the work site provided by Store Centar Robertsganj
STP 11 Mtr. - IS 410 SP-55
X-Arm M.S. Angle (65*65*6) mm V-Type 11 KV
F Bracket
Cross bracing M.S. Angle
M.S. Channel (100x50x2240) mm TOP
ACSR Weasel conductor
11 KV Disc Insulators B&S Type
11 KV Disc Fitting
Base Channel MS 100x50x2240
11 KV Pin Insulator
11 KV Pin with nut
Stay Complete
Earthing Complete
M.S. Channel Dropper (100*50*6) mm long
T/F 11/0.4KV 63 KVA
11 KV TPMO
11 KV Fuse Set
Transformer 400 KVA 11/0.4 KV
LT XLPE Cable Al.1x1000 Sq.mm
Cable AL.3x70 sqmm XLPE 11kv
Decenterlized Material Provided by Contractor
X-Arm holding clamp with nut & bolt
Danger Board with clamp nut & bolt
Clamp for Top/Dropper Channel with nut & bolt
Barbed Wire
PG Clamp for weasel
Earth wire clamp for STP
Various type nut & bolts
Stay Clamp with nut & bolt
Stone pad (300*300*75) mm
Trolley
Cable joint kit 3x70 XLPE 11KV
Copper L-piece
Aluminium Lugs Crimping Type
Work of following material as per Respo/Puvvnl norms at the work site.
Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Erection of Sectional Double Pole Structure of ST/PCC pole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & CROSS BRACING ANGLE & other required works with by jumpering with E bracket & Pin Insulator.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing Complete
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of WEASEL Conductor, binding with insulators & jumpering.
Stringing & sagging of LT XLPE Cable size 1x1000 mm2 including binding with insulators & jumpering.
Stringing & sagging of 11 KV XLPE Cable size 3x70 mm2 including binding with insulators & jumpering.
INSTALATION OF 63 KVA T/F
INSTALATION OF 11 KV TPMO POLYMOR
INSTALATION OF 11 KV FUSE SET
j.v. enterprises
M/s ANITA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .