| 1.00Construction of Bathing Tub at Subbalapuram village in Athankaraipatti panchayat | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 13.2 | m3 | 131.89 ₹1,740.95 | 131.89 ₹1,740.95 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 | 6.6 | m3 | 5,848.6 ₹38,600.76 | 5,848.6 ₹38,600.76 |
| 4.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3 | 3.09 | m3 | 6,301.09 ₹19,470.37 | 6,301.09 ₹19,470.37 |
| 5.00 | Supplying and erecting for centering for sides including all labour charges etc. | 3.12 | m3 | 547.5 ₹1,708.20 | 547.5 ₹1,708.20 |
| 6.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. | 246.47 | m3 | 91.1 ₹22,453.42 | 96 ₹23,661.12 |
| 7.00 | R.Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all CC item of works excluding cost of including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3 | 5.1 | m3 | 9,647.94 ₹49,204.49 | 9,647.94 ₹49,204.49 |
| 8.00 | Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. | 15.52 | m3 | 1,438.36 ₹22,323.35 | 1,438.36 ₹22,323.35 |
| 9.00 | Plastering with CM 1:5, 12 mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. | 25.26 | m3 | 290.69 ₹7,342.83 | 290.69 ₹7,342.83 |
| 10.00 | Emulsion painting with two coat using plastic emulsion including cost and conveyance of all materials to site and all labour charges etc completed | 14.93 | m3 | 260 ₹3,881.80 | 262.48 ₹3,918.83 |
Tender Value
₹2.0 L
Closing Date
16 Dec 2025, 3:00 pmClosed
BDO BP
Sedapatti
Construction of Bathing Tub at Subbalapuram village in Athankaraipatti panchayat
2025_RDTN_631706_1
01(01)/SED/MLA/2025-2026
Open Tender
Civil Works - Others
90 days
sedapatti
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
17 Dec 2025
12 Dec 2025
16 Dec 2025
12 Dec 2025
16 Dec 2025
12 Dec 2025
Amount
Construction of Bathing Tub at Subbalapuram village in Athankaraipatti panchayat
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Supplying and erecting for centering for sides including all labour charges etc.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
R.Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all CC item of works excluding cost of including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers.
Plastering with CM 1:5, 12 mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Emulsion painting with two coat using plastic emulsion including cost and conveyance of all materials to site and all labour charges etc completed
Towards Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.PREM KUMAR (BID ID -1535240)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_755544.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid