| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-Finance 58 KAILASHPURAM GOVINDPURAM GAZIABAD | GHAZIABAD | UTTAR PRADESH | L1 | Accepted-Finance 1st Lowest Bidder | |
| 2 | L2₹3.6 L+₹55,000 (17.7%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹3.9 L+₹76,300 (24.6%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest Bidder | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Firm has not submit A Class Electrical Contractor License , ITR F.Y. 2023-24 , Latest Balance Sheet and same type of work experience . |
Tender Value
₹3.7 L
EMD Value
₹4,000
Closing Date
13 Jun 2024, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle, UPPTCL, 132 KV S/s Mohaddipur Old , Gorakhpur
WORK OF ATTENDING GAS LEAKAGE FROM M/s SIEMENS MAKE 145 KV SF-6 GAS CIRCUIT BREAKER AT 132 KV SUBSTATION LAXMIPUR UNDER ETD-I , GORAKHPUR
2024_UPTCL_925133_1
E-Tender No. 04-ETC(G)/2024-25
Open Tender
Electrical Works
Item Rate
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC, Gorakhpur
₹4,000
23 Jul 2024
20 May 2024
14 Jun 2024
20 May 2024
13 Jun 2024
20 May 2024
Amount
Following work is to be carried out at 132 KV Substation Laxmipur, Kushinagar under ETD-I , Gorakhpur for attending SF-6 Gas leakage from M/s Siemens make Circuit Breaker Sl. No. 21492, 21497, 21498 , 21499, 21501 & 21502 of installed at 132 KV Hata Line-I & II , 132 KV 40 MVA T/F-I & II , 132 KV TBC & BC Bay.
Inspection and rectification of gas leakage of 145 KV SF-6 Circuit Breaker. Job includes opening of R,Y,B Phase assembly from upper and lower terminal flanges, cleaning of all groves of flanges and percelain with petrol , scrubber pad and acrylic solution . Replacement of all O-ring of the pole and gas pipe fitting by applying Anna bond adhesive . Reassembly of pole then evacuation of pole up to 760 mm Hg after testing of vacuum for 12 hours and satisfactory result, refilling of SF-6 gas up to required level . Checking of proper operation of circuit breaker from local and remote. Cost includes all materials , T&P and other associated work excluding SF-6 Gas from all the three pole of CB.
Loading of Gas retriving plant at 220 KV S/s Barahuwa , Gorakhpur , Transportation up to the site , unloading at working site and back to Barahuwa.
Supply of SF-6 Gas 11 Kg FOR site at Kushinagar. Providing of cylinder shall be in your scope.
SWITCHGEAR AND TRANSFORMER CARE CENTRE
M/S JAI SHREE ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .