| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 LAccepted-AOC | ₹2.2 L Quoted ₹2.4 L | 1 | Accepted-AOC Lowest Bidder |
| 2 | 2₹2.4 L+₹7,179.57 (3.05%)Rejected-Finance | ₹2.4 L+₹7,179.57 (3.05%) | 2 | Rejected-Finance L2 |
| 3 | 3₹2.5 L+₹11,658.45 (4.96%)Rejected-Finance VIDYUT BHAWAN HPSEBL SHIMLA 17100 | 17100 | ₹2.5 L+₹11,658.45 (4.96%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | NARESH AUKTA L2 | HANS RAJ L3 | MR. BALVIR SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations , trenches etc., in earth work , lift up to 1.50 metres. Stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. (fifteen centimetres) layers , when required in to plinth and sides of foundations etc., conslolidating each of the disposited layer by ramming and watering and then disposing off all excavated soil as directed with in the load of 20 mtrs. Pick and Jumper work etc. complete as per the direction of the Engineer - in - Charge. | 12.41 | Cum. | 465 ₹5,770.65 | 485 ₹6,018.85 | 450 ₹5,584.5 Lowest |
| 2.00 | Providing and laying cement concrete 1:3:6 (1cement: 3 sand: 6 graded stone aggregate 40mm( Forty millimeter nominal size) and curing complete excluding cost of from work in foundation and plinth with in all leads & lifts as per entire satisfication of Engineer-in-Charge. | 1.74 | Cum. | 9,200 ₹16,008 | 9,500 ₹16,530 | 9,000 ₹15,660 Lowest |
| 3.00Providing and laying cement concrete 1:1.5:3 (1cement :1.5Sand: 3 graded stone aggregate 20 mm N/S) and curing complete excluding cost of form work and reinforcement for Rainforced concrete work in:- | ||||||
| 3.01 | Block (Thrust block). | 11.12 | Cum. | 10,800 ₹1,20,096 | 11,000 ₹1,22,320 | 10,500 ₹1,16,760 Lowest |
| 4.00 | Providing and fixing of mild steel/ tor steel reinfircement for rainforced concrete work I/C bending, binding and placing in position complete upto floor two level with in all leads and lifts as per the direction of the Engineer in Charge. | 840.74 | Kg. | 108 ₹90,799.92 | 110 ₹92,481.4 | 105 ₹88,277.7 Lowest |
| 5.00Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge. | ||||||
| 5.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like with in all leads aand lifts as per the direction of the Engineer in Charge. | 19.68 | Sqm. | 490 ₹9,643.2 | 480 ₹9,446.4 | 450 ₹8,856 Lowest |
Tender Value
₹2.3 L
EMD Value
₹4,700
Closing Date
16 Sept 2025, 11:00 amClosed
Executive Engineer
JSV Division Jubbal
Construction of pump foundation of LWSS Badhal Dochi and CO anchor block at LWSS Deem Dharai
2025_HPIPH_114088_3
JBL-SML-09-718
Open Tender
Civil Works
Item Rate
30 days
Badhal
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹4,700
8 Jul 2026
6 Sept 2025
16 Sept 2025
6 Sept 2025
16 Sept 2025
6 Sept 2025
Amount
Excavation in foundations , trenches etc., in earth work , lift up to 1.50 metres. Stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. (fifteen centimetres) layers , when required in to plinth and sides of foundations etc., conslolidating each of the disposited layer by ramming and watering and then disposing off all excavated soil as directed with in the load of 20 mtrs. Pick and Jumper work etc. complete as per the direction of the Engineer - in - Charge.
Providing and laying cement concrete 1:3:6 (1cement: 3 sand: 6 graded stone aggregate 40mm( Forty millimeter nominal size) and curing complete excluding cost of from work in foundation and plinth with in all leads & lifts as per entire satisfication of Engineer-in-Charge.
Providing and laying cement concrete 1:1.5:3 (1cement :1.5Sand: 3 graded stone aggregate 20 mm N/S) and curing complete excluding cost of form work and reinforcement for Rainforced concrete work in:-
Block (Thrust block).
Providing and fixing of mild steel/ tor steel reinfircement for rainforced concrete work I/C bending, binding and placing in position complete upto floor two level with in all leads and lifts as per the direction of the Engineer in Charge.
Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge.
Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like with in all leads aand lifts as per the direction of the Engineer in Charge.
NARESH AUKTA (BID ID -555450)
HANS RAJ (BID ID -555443)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .