Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
23 Feb 2022, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Const of Bridge NHO Bashir Ahmad mir at badikul mancher nallah at salam bhat mohalla pyt Tekipora C
2022_RDPR_161103_12
NIT No1512021-22 PRI
Open Tender
Civil Works
Item Rate
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
EXECUTIVE ENGINEER REW KUPWARA
Yes
23 Feb 2022
18 Feb 2022
23 Feb 2022
18 Feb 2022
23 Feb 2022
18 Feb 2022
18 Feb 2022 - 18 Feb 2022
Amount
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar
Earth work in excavation by manual means over areas (exceeding 30cm in depth, 1.5m in width as) including disposal of excavated earth lead upto 50m as directed by engineer in charge
Providing and laying of nallah stone solling tightly hand packed in foundation and plinth including all types of carriages
P/L in position specified grade including curing but excluding the cost of centering and shuttering, finishig and reinforcement All work upto plinth level with 1:5:10(1cement:5coarse sand : 10 graded stone agg. 40 mm size ) including all carriages by MT as well as HL of material up to site of Work Complete job.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), including all carriages by MT as well as HL of material up to site of work complete job.
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level ,Mild steel and medium tensile steel bars
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete.
Providing and fixing of Community Inforamtion board (CIB)
ab qayum peer
GH MOHD MIR
GHULAM RUBANI GAIJI
MUDASIR YOUSUF GANIE
M/S TARIQ AHMAD MIR
ABDUL GANI DOBI
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .