Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAdmitted-Finance U P SINGH COLONY KANHAIYAPUR VAJIDPUR DISTRICT JAUNPUR U P | ₹5.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.8 CrAdmitted-Finance 24 JEEVAN PLAZA VIRAM KHAND 5 GOMTI NAGAR LUCKNOW UTTAR PRADESH | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹5.8 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical DHIRRA SERAIYA JAUNPUR | JAUNPUR | UTTAR PRADESH | 212401 | - | - | Rejected-Technical Not Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | m/s ankur and brothers L1 | SHIVANSH CONSTRCUTION L2 |
|---|---|---|---|---|---|
| 1.01 | Jungle clearance with cutting of behya/sarpat gondi and elephant grass. | 1,60,020 | M2 | 4 ₹6,40,080 | 3.82 ₹6,11,276.4 |
| 1.02 | Earth work in correcting section of canal by Piclain/JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks including spreading and partial dressing as per direction by Engineer in charge. | 6,05,016.19 | M3 | 63.99 ₹3,87,14,986 | 75.45 ₹4,56,48,471.54 |
| 1.03 | Excavation of foundation in ordlanary soll/sandy loam, clay or sand including lift upto 1.5M and lead upto 30M and including filling, watering, ramming of excatated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as per direction by Engineer in charge upto a distance of 30M from the foundation trenches. | 1,894.37 | M3 | 100 ₹1,89,437 | 95.5 ₹1,80,912.34 |
| 1.04 | M 150 class brick work in 1:4 CM with coarse sand FM not less than 2 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 421.82 | M3 | 6,443.59 ₹27,18,035.13 | 6,153.62 ₹25,95,719.99 |
| 1.05 | M 150 class brick work in 1:3 CM with coarse sand FM not less than 2.5 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 393.68 | M3 | 6,644.17 ₹26,15,676.85 | 6,345.18 ₹24,97,970.46 |
| 1.06 | Cement pointing in 1:2 CM (Stuck deep) including all cost of labour, material and T&P etc complete. | 1,199.26 | M2 | 157.78 ₹1,89,219.24 | 150.67 ₹1,80,692.5 |
| 1.07 | Centering and shuttering including cost of all materials, labours and T&P etc. | 144.62 | M2 | 1,173.6 ₹1,69,726.03 | 1,120.79 ₹1,62,088.65 |
| 1.08 | Laying C.C. (1 : 1.5 : 3) with coarse sand F.M. Not less than 2, Crushed Stone Aggregate of size (10 mm to 20 mm)including all cost of material, labour and T&P etc. as per direction of Engineer in charge. | 170.86 | M3 | 9,851.82 ₹16,83,281.97 | 9,408.48 ₹16,07,532.89 |
| 1.09 | C.C in 1:2:4 for bed floor including all cost of labour,material and T&P etc complete.as per direction by Engineer in charge. | 142.17 | M3 | 8,267.2 ₹11,75,347.82 | 7,895.18 ₹11,22,457.74 |
| 1.10 | Finishing walls with water proofing cement paint of approved quality make such as super snowcem in two coat over one coat of white cement primer including brushing the surface curing and cost of all materials. | 13,044.3 | M2 | 122 ₹15,91,404.6 | 116.51 ₹15,19,791.39 |
Tender Value
₹6.1 Cr
EMD Value
₹12.3 L
Closing Date
19 May 2026, 11:00 amClosed
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Capacity Restoration Work
2026_UPIDC_1147663_4
02/S.E./2026-27
Open Tender
Civil Works
180 days
Jaunpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,614
₹12.3 L
Yes
Azamgarh
30 Jun 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Jungle clearance with cutting of behya/sarpat gondi and elephant grass. | 1,60,020 | M2 | - | - |
| 1.02 | Earth work in correcting section of canal by Piclain/JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks including spreading and partial dressing as per direction by Engineer in charge. | 6,05,016.19 | M3 | - | - |
| 1.03 | Excavation of foundation in ordlanary soll/sandy loam, clay or sand including lift upto 1.5M and lead upto 30M and including filling, watering, ramming of excatated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as per direction by Engineer in charge upto a distance of 30M from the foundation trenches. | 1,894.37 | M3 | - | - |
| 1.04 | M 150 class brick work in 1:4 CM with coarse sand FM not less than 2 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 421.82 | M3 | - | - |
| 1.05 | M 150 class brick work in 1:3 CM with coarse sand FM not less than 2.5 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 393.68 | M3 | - | - |
| 1.06 | Cement pointing in 1:2 CM (Stuck deep) including all cost of labour, material and T&P etc complete. | 1,199.26 | M2 | - | - |
| 1.07 | Centering and shuttering including cost of all materials, labours and T&P etc. | 144.62 | M2 | - | - |
| 1.08 | Laying C.C. (1 : 1.5 : 3) with coarse sand F.M. Not less than 2, Crushed Stone Aggregate of size (10 mm to 20 mm)including all cost of material, labour and T&P etc. as per direction of Engineer in charge. | 170.86 | M3 | - | - |
| 1.09 | C.C in 1:2:4 for bed floor including all cost of labour,material and T&P etc complete.as per direction by Engineer in charge. | 142.17 | M3 | - | - |
| 1.1 | Finishing walls with water proofing cement paint of approved quality make such as super snowcem in two coat over one coat of white cement primer including brushing the surface curing and cost of all materials. | 13,044.3 | M2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.55 MB
BOQ_2147704.xls
BOQ • 0.24 MB
Biddocument4.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid