Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC U P SINGH COLONY KANHAIYAPUR VAJIDPUR DISTRICT JAUNPUR U P | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.8 Cr+₹62.9 L (12.1%)Rejected-AOC 24 JEEVAN PLAZA VIRAM KHAND 5 GOMTI NAGAR LUCKNOW UTTAR PRADESH | LUCKNOW | LUCKNOW | UTTAR PRADESH | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical GRAM BAKHARIA POST RAUTAPAR DISTRICT BASTI UTTAR PRADESH | BASTI | BASTI | UTTAR PRADESH | - | Rejected-Technical Not Qualified | |
| 4 | Rejected-Technical DHIRRA SERAIYA JAUNPUR | JAUNPUR | UTTAR PRADESH | 212401 | - | Rejected-Technical Not Qualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | m/s ankur and brothers L1 | SHIVANSH CONSTRCUTION L2 |
|---|---|---|---|---|---|
| 1.01 | Jungle clearance with cutting of behya/sarpat gondi and elephant grass. | 1,60,020 | M2 | 4 ₹6,40,080 | 3.82 ₹6,11,276.4 Lowest |
| 1.02 | Earth work in correcting section of canal by Piclain/JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks including spreading and partial dressing as per direction by Engineer in charge. | 6,05,016.19 | M3 | 63.99 ₹3,87,14,986 Lowest | 75.45 ₹4,56,48,471.54 |
| 1.03 | Excavation of foundation in ordlanary soll/sandy loam, clay or sand including lift upto 1.5M and lead upto 30M and including filling, watering, ramming of excatated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as per direction by Engineer in charge upto a distance of 30M from the foundation trenches. | 1,894.37 | M3 | 100 ₹1,89,437 | 95.5 ₹1,80,912.34 Lowest |
| 1.04 | M 150 class brick work in 1:4 CM with coarse sand FM not less than 2 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 421.82 | M3 | 6,443.59 ₹27,18,035.13 | 6,153.62 ₹25,95,719.99 Lowest |
| 1.05 | M 150 class brick work in 1:3 CM with coarse sand FM not less than 2.5 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 393.68 | M3 | 6,644.17 ₹26,15,676.85 | 6,345.18 ₹24,97,970.46 Lowest |
| 1.06 | Cement pointing in 1:2 CM (Stuck deep) including all cost of labour, material and T&P etc complete. | 1,199.26 | M2 | 157.78 ₹1,89,219.24 | 150.67 ₹1,80,692.5 Lowest |
| 1.07 | Centering and shuttering including cost of all materials, labours and T&P etc. | 144.62 | M2 | 1,173.6 ₹1,69,726.03 | 1,120.79 ₹1,62,088.65 Lowest |
| 1.08 | Laying C.C. (1 : 1.5 : 3) with coarse sand F.M. Not less than 2, Crushed Stone Aggregate of size (10 mm to 20 mm)including all cost of material, labour and T&P etc. as per direction of Engineer in charge. | 170.86 | M3 | 9,851.82 ₹16,83,281.97 | 9,408.48 ₹16,07,532.89 Lowest |
| 1.09 | C.C in 1:2:4 for bed floor including all cost of labour,material and T&P etc complete.as per direction by Engineer in charge. | 142.17 | M3 | 8,267.2 ₹11,75,347.82 | 7,895.18 ₹11,22,457.74 Lowest |
| 1.10 | Finishing walls with water proofing cement paint of approved quality make such as super snowcem in two coat over one coat of white cement primer including brushing the surface curing and cost of all materials. | 13,044.3 | M2 | 122 ₹15,91,404.6 | 116.51 ₹15,19,791.39 Lowest |
Tender Value
₹6.1 Cr
EMD Value
₹12.3 L
Closing Date
19 May 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Capacity Restoration Work
2026_UPIDC_1147663_4
02/S.E./2026-27
Open Tender
Civil Works
Item Rate
180 days
Jaunpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,614
₹12.3 L
Yes
Azamgarh
23 Oct 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
14 May 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Jungle clearance with cutting of behya/sarpat gondi and elephant grass. | 1,60,020 | M2 | - | - |
| 1.02 | Earth work in correcting section of canal by Piclain/JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks including spreading and partial dressing as per direction by Engineer in charge. | 6,05,016.19 | M3 | - | - |
| 1.03 | Excavation of foundation in ordlanary soll/sandy loam, clay or sand including lift upto 1.5M and lead upto 30M and including filling, watering, ramming of excatated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as per direction by Engineer in charge upto a distance of 30M from the foundation trenches. | 1,894.37 | M3 | - | - |
| 1.04 | M 150 class brick work in 1:4 CM with coarse sand FM not less than 2 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 421.82 | M3 | - | - |
| 1.05 | M 150 class brick work in 1:3 CM with coarse sand FM not less than 2.5 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 393.68 | M3 | - | - |
| 1.06 | Cement pointing in 1:2 CM (Stuck deep) including all cost of labour, material and T&P etc complete. | 1,199.26 | M2 | - | - |
| 1.07 | Centering and shuttering including cost of all materials, labours and T&P etc. | 144.62 | M2 | - | - |
| 1.08 | Laying C.C. (1 : 1.5 : 3) with coarse sand F.M. Not less than 2, Crushed Stone Aggregate of size (10 mm to 20 mm)including all cost of material, labour and T&P etc. as per direction of Engineer in charge. | 170.86 | M3 | - | - |
| 1.09 | C.C in 1:2:4 for bed floor including all cost of labour,material and T&P etc complete.as per direction by Engineer in charge. | 142.17 | M3 | - | - |
| 1.1 | Finishing walls with water proofing cement paint of approved quality make such as super snowcem in two coat over one coat of white cement primer including brushing the surface curing and cost of all materials. | 13,044.3 | M2 | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.55 MB
BOQ_2147704.xls
BOQ • 0.24 MB
Biddocument4.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .