| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹49.2 CrAccepted-Finance | ₹49.2 Cr | 1 | Accepted-Finance Lowest quoted rate |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 3 | Not Admitted-Fee/PreQual/Technical 1 513 VIDHYADHAR NAGAR JAIPUR 302039 RAJASTHAN | JAIPUR | RAJASTHAN | 302039 | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder does not submit documents as per NIB Point no 08 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder does not submit documents as per NIB Point no 08 |
| 5 | Not Admitted-Fee/PreQual/Technical C 21 SUSHANT LOK III SECTOR 57 GURUGRAM | GURUGRAM | HARYANA | 122001 | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder does not submit documents as per NIB Point no 08 |
Tender Value
₹45.9 Cr
EMD Value
₹91.9 L
Closing Date
9 Dec 2025, 6:00 pmClosed
ACE WR Zone Bharatpur
o/o Additional Chief Engineer Water Resources Zone Bharatpur
Reclamation of rivers, flood canal, drains of WR Bharatpur
2025_WRDAS_513785_1
ACE NIT 09/2025-26_Reclamation
Open Tender
Civil Works
547 days
under jurisdiction of EE WR Division Bharatpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
as per nit
₹91.9 L
Yes
Bharatpur
12 Mar 2026
17 Nov 2025
10 Dec 2025
17 Nov 2025
9 Dec 2025
17 Nov 2025
25 Nov 2025
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (d) For Existing canal having discharge 101 & up to 200 cusec
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (e) For Existing canal having discharge 201 & up to 500 cusec
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (f) For Existing canal having discharge more than 501 cusec
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor)
Add Extra over item no 18 a & 18 b (i) for compaction of earth work only on side slope for resectioning / remodelling of existing canal by mechanical compactor or any other mean on canal side slopes. In this case no lip cutting shall be paid extra
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (f) For Existing canal having discharge more than 501 cusec
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor)
Add Extra over item no 18 a & 18 b (i) for compaction of earth work only on side slope for resectioning / remodelling of existing canal by mechanical compactor or any other mean on canal side slopes. In this case no lip cutting shall be paid extra
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (f) For Existing canal having discharge more than 501 cusec
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick
Uprooting Water Hyacinth (Jal Kumbhi) or similar aquatic plants in water including re-handling and disposal within lead of 250 m from dam/canal. In canal flow water
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor)
Add Extra over item no 18 a & 18 b (i) for compaction of earth work only on side slope for resectioning / remodelling of existing canal by mechanical compactor or any other mean on canal side slopes. In this case no lip cutting shall be paid extra
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (f) For Existing canal having discharge more than 501 cusec
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.
Add extra for each subsequent lead of 500m or part, there of beyond 0.500 Km. & upto 5 Km
Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor)
Add Extra over item no 18 a & 18 b (i) for compaction of earth work only on side slope for resectioning / remodelling of existing canal by mechanical compactor or any other mean on canal side slopes. In this case no lip cutting shall be paid extra
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (f) For Existing canal having discharge more than 501 cusec
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor)
Add Extra over item no 18 a & 18 b (i) for compaction of earth work only on side slope for resectioning / remodelling of existing canal by mechanical compactor or any other mean on canal side slopes. In this case no lip cutting shall be paid extra
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (d) For Existing canal having discharge 101 & up to 200 cusec
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (e) For Existing canal having discharge 201 & up to 500 cusec
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (f) For Existing canal having discharge more than 501 cusec
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor)
Add Extra over item no 18 a & 18 b (i) for compaction of earth work only on side slope for resectioning / remodelling of existing canal by mechanical compactor or any other mean on canal side slopes. In this case no lip cutting shall be paid extra
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (d) For Existing canal having discharge 101 & up to 200 cusec
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (e) For Existing canal having discharge 201 & up to 500 cusec
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (f) For Existing canal having discharge more than 501 cusec
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor)
Add Extra over item no 18 a & 18 b (i) for compaction of earth work only on side slope for resectioning / remodelling of existing canal by mechanical compactor or any other mean on canal side slopes. In this case no lip cutting shall be paid extra
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Survey work with total station and preparation of L- section showing level @ 30 meter and X-section with levels at suitable interval clearly showing shape of canal, X-section should be extended both side 10m beyond bank toe/borrow area. The location of C.D. works direct out lets (with size & nos.) / cuts, regulators and existing lining (type and extent) be marked (this shall be done separately for each main canal, branches/minors/sub minors). Listing of present status of existing structures and lining reaches indicating visible distress conditions complete in all respect with material including nominal jungle clearance required for survey work. Digital plotting of drawings with scale 1:2500 (H) and 1:100 (V) for L-sections and 1:100 (H&V) for cross sections for main canal / branches and 1:50 for distributaries and minor/sub-minors including all ancillary works as described in specifications and conditions of contract. (f) For Existing canal having discharge more than 501 cusec
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor)
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Side shuttering including propping etc. complete (to achieve finish F 2 for :Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc.
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc.
Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985)
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With initial lead of 250 m Deduct in item no 16 (a) to (d) above if Standard Proctor s density to be achived is at least 90%
Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor)
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 400 kg/ cum of concrete) 20 mm
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 40 mm
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_916492.xls
BOQ • 0.44 MB
BiddocumentReclamationBPR.pdf
Tender Documents • 2.67 MB
Download all tender documents and submit your bid