Tender Value
₹11.7 Cr
EMD Value
₹23.4 L
Closing Date
11 Aug 2026, 2:30 pm2d left
Supertending Engineer
Irrigation Work Circle Banda
Restoration work of Kamalkheda Rajwaha from Km 0.000 to 29.301 coming out of Chandrawal Dam under the control of Irrigation Division Mahoba.(LOT-01)
2026_UPIDC_1172455_1
09/SE/2026-27 dt 18-07-2026
Open Tender
Civil Works
Item Wise
300 days
Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,900
₹23.4 L
Irrigation Work Circle Banda
28 Jul 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work by Power transported earth with a lead beyond 200m and upto 1.0 km including excavation, loading, unloading, manual compaction, dressing and all lift complete. | 1,12,062.8 | M3 | 220 | ₹2,46,53,816 |
| 2 | Earth work in Mar, Rankar and kankar mixed soils in foundation of walls, piers, abutments etc.with disposal with in 30-m lead and 1.5 m. including dressing making profile and manual compaction but excluding mechanical compaction. | 6,384.04 | M3 | 92.9 | ₹5,93,077.32 |
| 3 | Dismentaling of Brick or Stone Masonary in lime or Cement mortar | 36.79 | M3 | 469.2 | ₹17,261.87 |
| 4 | Dismentling reinforce cement concrete | 54.74 | M3 | 750.7 | ₹41,093.32 |
| 5 | Laying M-10 P.C.C. 1:3:6 (cement, coarse sand & 22.4-53mm stone ballast) in foundation all cost of labour material and T&P etc. complete work as per direction of Engineer-in charge. | 1,783.6 | M3 | 4,603.57 | ₹82,10,927.45 |
| 6 | Centering & shuttering for C.C. work including all materials & T&P etc.complete work as per direction of Engineer-in charge. | 3,713.94 | M2 | 312.8 | ₹11,61,720.43 |
| 7 | Centering & shuttering for R.C.C. work including all materials & T&P etc.complete work as per direction of Engineer-in charge. | 283.47 | M2 | 572.5 | ₹1,62,286.58 |
| 8 | Providing and fixing steel reinforcement for R.C.C. work including cutting, bending, placing and binding with G.I. wire including its cost etc. as per direction of Engineer-in-charge. | 7.6 | MT | 69,996.8 | ₹5,31,975.68 |
| 9 | Laying R.C.C M-20 1:1.5:3 in (cement, coarse sand and 11.20mm to 19mm graded stone grit) including all cost of labour, material and T&P etc. complete work as per direction of Engineer-in charge. | 56.02 | M3 | 6,788.9 | ₹3,80,314.18 |
| 10 | Laying C.C M-20 1:1.5:3 in (cement, coarse sand and 11.20mm to 19mm graded stone grit) including all cost of labour, material and T&P etc. complete work as per direction of Engineer-in charge. | 1,068.28 | M3 | 6,073.7 | ₹64,88,412.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.30 MB
TD.pdf
Tender Documents • 2.09 MB
BOQ_2201849.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].