| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC AT PO SOUTH BALANDA ANGUL ODISHA 759116 | ANUGUL | ODISHA | 759116 | L1 | Accepted-AOC WORK IS AWARDED BEING L1 BIDDER | |
| 2 | L2₹2.5 L+₹22,542.84 (9.83%)Rejected-Finance AT PO SOUTH BALANDA NEAR STADIUM DIST ANGUL ODISHA 759116 | SOUTH BALANDA | ANGUL | ODISHA | 759116 | L2 | Rejected-Finance REJECTED NOT BEING L1 BIDDER | |
| 3 | L3₹3.0 L+₹67,766.49 (29.5%)Rejected-Finance AT KARADAPALLI PO GOBARA PS VIKRAMPUR DIST ANGUL ODISHA 759103 | KARADAPALLI | ANGUL | ODISHA | 759103 | L3 | Rejected-Finance REJECTED NOT BEING L1 BIDDER | |
| 4 | L4₹3.0 L+₹73,580.59 (32.1%)Rejected-Finance AT MALLIBANDHA PO GOPALPRASAD PS COLLIERY TALCHER DIST ANGUL PIN 759103 ODISHA | TALCHER | ANGUL | ODISHA | 759103 | L4 | Rejected-Finance REJECTED NOT BEING L1 BIDDER | |
| 5 | L5₹3.0 L+₹75,383.56 (32.9%)Rejected-Finance AT PO SOUTH BALANDA TALCHER DIST ANGUL ODISHA 759116 | TALCHER | ANGUL | ODISHA | 759116 | L5 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
Tender Value
₹4.1 L
EMD Value
₹5,200
Closing Date
11 May 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Providing and Laying of WBM and providing concrete step to Balanda main quarry of Jagannath Colliery under Jagannath Area(Re-tender/2nd call).
2024_MCL_307146_1
MCL/GM(JA)/SO(C)/e- Tender/24-25/17 Dtd-27/04/24
Open Tender
Civil Works - Others
Item Rate
45 days
Jagannath OCP
AS PER NIT
3 documents required · 3 mandatory
₹5,200
Yes
24 Jun 2024
29 Apr 2024
13 May 2024
30 Apr 2024
11 May 2024
30 Apr 2024
30 Apr 2024 - 4 May 2024
Amount
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead up to 1000m as per relevant clauses of section - 300 of specifications )
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC with rotavator and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification.for grading- I Material
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Centering and shuttering including strutting, propping etc. and removal of form for, Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
SAMBIT MOHANTY
CHANDAN KUMAR PRADHAN
ABHAYA KUMAR MOHANTY
KISHORE CHANDRA SAHOO
techsummary_318273.pdf
PDF • 0.06 MB
finsummary_318273.pdf
PDF • 0.64 MB
WO_17.pdf
PDF • 2.75 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .