Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC 17 1 SANKAR COLONY PALAYAMKOTTAI TIRUNELVELI | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | ₹20.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.0 LRejected-AOC NO 275 8TH CROSS STREET KODEESWARAN NAGAR TIRUNELVELI TOWN TIRUNELVELI 627006 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627006 | ₹21.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MARSHAL VIGNESH & CO L1 | PERUMAL KUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavating and depositng on bank withan initial lead of 10m & initial lift of 2m in sand, silt (or) other loose soil, wet sand( or) silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth as standard specification SS20 B including refilling charges asper standard specification | 150 | m2 | 232 ₹34,800 | 236.65 ₹35,496.94 |
| 2.00 | Plain cement concrete of mix 1:4:8 (One Cement, four sand and Eight aggregate) using 40mm ISS HBG metal from approved quarry including cost and conveyance of materials to site and all labour charges etc., complete asper standard specification. | 30 | m2 | 4,787 ₹1.4 L | 4,886.36 ₹1.5 L |
| 3.00 | Collection ,Supply and filling well gravel from approveded quarry for foundation and basement including cost and conveyence of all materials etc complete as per standard speceification | 25 | m3 | 311 ₹7,775 | 316.97 ₹7,924.33 |
| 4.00Providing Steel centering for sides and soffits of Cement Concrete works including necessary strutting arrangements with strutting for plain surfaces in Foundation and Basement for RCC Grade Beams, Column footings, Columns, Plinth beams, Staircase, with all cost and conveyance of materials and lab our at site etc., complete as per standard specification | |||||
| 5.00without props | |||||
| 6.00 | Culvert side wall | 250 | m3 | 863 ₹2.2 L | 881.02 ₹2.2 L |
| 7.00with props | |||||
| 8.00 | culvert slab | 43 | m3 | 962 ₹41,366 | 981.63 ₹42,210.15 |
| 9.00 | Plain Cement Concrete mix 1:3:6 ( One cement, three and six aggregate) using 20mm ISS HBG metal from approved quarry including all cost and conveyance of materials to site and all labour charges etc., complete asper standard specification. | 25 | m3 | 5,466 ₹1.4 L | 5,579.25 ₹1.4 L |
| 10.00 | Plain cement concrete of mix 1:11/2:3 using 20mm ISS HBG metal from approved quarry and all cost of materials for all RCC works with all cost and conveyance of materials and labour charges etc., complete | 13 | m3 | 6,725 ₹87,425 | 6,864.32 ₹89,236.12 |
Tender Value
₹21.5 L
EMD Value
₹21,500
Closing Date
9 Sept 2025, 3:00 pmClosed
COMMISSIONER TIRUNELVELI
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Proposed Construction of RCC Culvert at Aasirvatham Nagar Maharajanagar in ward no.39
2025_MAWS_596654_91
24/2025-26
Open Tender
Civil Works
90 days
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹21,500
19 Feb 2026
30 Aug 2025
9 Sept 2025
30 Aug 2025
9 Sept 2025
30 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_715898.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid