Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical R O FIRDOUS COLONY BUCHPORA SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | Accepted-Technical Responsive |
| 3 | Accepted-Technical | Accepted-Technical Responsive |
| 4 | Rejected-Technical | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical | Rejected-Technical Non-Responsive |
Tender Value
₹5.2 Cr
EMD Value
₹10.4 L
Closing Date
24 Sept 2026, 4:00 pmClosed
EXECUTIVE ENGINEER RNB DIVISION AWANTIPORA
Executive Engineer rnb division Awantipora
Construction of School Building at HSS Samboora.
2026_PWDJK_321894_1
101/EEA/RNB of 2026-27/5135-45 dated 22-08-2026
Open Tender
Civil Works
Percentage
545 days
pampore
as per nit/sbd
16 documents required · 16 mandatory
₹8,500
JK Bank Account Bearing No 0470010200000099
₹10.4 L
Superintending Engineer PWD(RNB) Circle Pul/Spn
14 Oct 2026
22 Aug 2026
25 Sept 2026
24 Aug 2026
24 Sept 2026
24 Aug 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Section-I….........Civil Work | - | - | - | - |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge. All kinds of soil : In or under water and/ or liquid mud, including pumping out water as required. | 1 | cum | 1 | ₹1 |
| 3 | providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | 1 | - |
| 4 | Providing supplying and stacking of stone soling including laying ramming complete as per direction of engineer incharge incl. all carriages | - | cum | 0.8 | - |
| 5 | Supplying and filling in plinth with fine sand under floors including, watering, ramming, consolidating and dressing carriage complete. | 1 | cum | 0.2 | ₹0.2 |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth: With out bond stone (Nallah) | - | cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | cum | 0.6 | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 0.8 | - |
| 10 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.71 MB
Tendernotice_2.pdf
PDF • 1.48 MB
BOQ_1076491.xls
BOQ • 0.61 MB
extension101.pdf
PDF • 0.97 MB
extension101.pdf
PDF • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .