| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹3.7 L+₹28,828.97 (8.48%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹3.9 L+₹52,265.20 (15.4%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | 4₹4.0 L+₹55,311.22 (16.3%)Rejected-Finance | 4 | Rejected-Finance L4 | |
| 5 | 5₹4.1 L+₹65,097.72 (19.1%)Rejected-Finance 537 KHERA MOHALLA SHIKOHABAD FIROZABAD | SHIKOHABAD | FIROZABAD | UTTAR PRADESH | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s LATURI SINGH CONTRACTOR & SUPPLIERS L4 | M/S N.S. CONSTRUCTION L3 | M/s SANJEEV KUMAR SINGH CONTRACTOR AND SUPPLIERS L6 | VIJAY CONSTRUCTION L8 | Harendra kumar thekedar L5 | M/s CHANDRA PAL SINGH L7 | M/S H.K.C. CONSTRUCTION L1 | M/S MAYA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.(b) Drains | 10,442.27 | Cum | 32 ₹3,34,152.58 | 26 ₹2,71,498.97 Lowest | 26.67 ₹2,78,495.29 | 55 ₹5,74,324.74 | 30 ₹3,13,268.04 | 40 ₹4,17,690.72 | 26 ₹2,71,498.97 Lowest | 30 ₹3,13,268.04 |
| 2.00 | Uprooting jhunds and moonj wih disposal away from site. | 3,010.8 | Sqm | 5 ₹15,054 | 19 ₹57,205.2 | 18.97 ₹57,114.88 | 18 ₹54,194.4 | 4 ₹12,043.2 | 4 ₹12,043.2 | 3 ₹9,032.4 Lowest | 10 ₹30,108 |
| 3.00 | Ist class brick work (M 15) in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc . | 5.15 | Cum | 500 ₹2,577 Lowest | 2,600 ₹13,400.4 | 2,800 ₹14,431.2 | 6,000 ₹30,924 | 2,500 ₹12,885 | 5,000 ₹25,770 | 1,000 ₹5,154 | 1,200 ₹6,184.8 |
| 4.00 | Cement Pointing(Struck deep) on Brick Masonry with cement mortar 1:2 including cost of all materials, Labour and T& P etc . | 63.06 | Sqm | 76.86 ₹4,847.02 | 70 ₹4,414.41 | 68.51 ₹4,320.45 Lowest | 180 ₹11,351.34 | 141 ₹8,891.88 | 200 ₹12,612.6 | 80 ₹5,045.04 | 141 ₹8,891.88 |
| 5.00 | Wall painting (two coat) with plastic emulsion paint of approved brand and manufacture on decorative wall surface to give an even shade including thoroughly brushing the surface clean all of dirt, grease loose pieces and prepare smooth. | 84.67 | Sqm | 91.39 ₹7,737.72 | 65 ₹5,503.36 | 81.5 ₹6,900.36 | 60 ₹5,080.02 | 100 ₹8,466.7 | 100 ₹8,466.7 | 70 ₹5,926.69 | 50 ₹4,233.35 Lowest |
| 6.00 | Earth work in cutting or in filling / embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 200m lead. | 620 | Cum | 50 ₹31,000 | 65 ₹40,300 | 71.76 ₹44,491.2 | 75 ₹46,500 | 80 ₹49,600 | 25 ₹15,500 | 70 ₹43,400 | 10 ₹6,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
23 May 2026, 2:00 pmClosed
Executive Engineer
ICD Firozabad HQ Shikohabad
Repair of Pacca Structure and Clearance of Patsoi Drain from Km 0.000 to 12.472
2026_UPIDC_1149133_1
02/EE/2026-27/05
Open Tender
Civil Works - Canal
Item Rate
15 days
Pasoi Drain
Please refer tender documents
2 documents required · 2 mandatory
₹266
₹16,000
11 Jun 2026
16 May 2026
23 May 2026
16 May 2026
23 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.(b) Drains | 0.2 | Cum | - | - |
| 2 | Uprooting jhunds and moonj wih disposal away from site. | - | Sqm | - | - |
| 3 | Ist class brick work (M 15) in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc . | 1 | Cum | - | - |
| 4 | Cement Pointing(Struck deep) on Brick Masonry with cement mortar 1:2 including cost of all materials, Labour and T& P etc . | 0.2 | Sqm | - | - |
| 5 | Wall painting (two coat) with plastic emulsion paint of approved brand and manufacture on decorative wall surface to give an even shade including thoroughly brushing the surface clean all of dirt, grease loose pieces and prepare smooth. | 0.8 | Sqm | - | - |
| 6 | Earth work in cutting or in filling / embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 200m lead. | - | Cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.16 MB
5.pdf
Tender Documents • 3.29 MB
BOQ_2151179.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .