Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹71.4 L
EMD Value
₹1.4 L
Closing Date
16 Oct 2026, 3:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
C.D. Prayagraj-02, UPAVP, Pratapgarh
CONSTRUCTION WORK OF THE OFFICE FOR C.O. RANIGANJ, DISTRICT-PRATAPGARH.
2026_UPHDB_1188272_1
1746/L-11/187 Dated 14.09.2026
Open Tender
Civil Works
Percentage
330 days
Raniganj
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
Yes
Executive Engineer, C.D. Prayagraj-02, UPAVP.
₹1.4 L
Yes
21 Sept 2026
21 Sept 2026
16 Oct 2026
21 Sept 2026
16 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer in-charge.All kinds of soil | 323.9 | CUM | 129.24 | ₹41,860.84 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer in-charge.All kinds of soil In all kind of soil upto 1.5m to 3.0m. depth | 7.76 | CUM | 221.57 | ₹1,719.38 |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 79.69 | CUM | 510.06 | ₹40,646.68 |
| 4 | supplying, and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches,. | 799.64 | CUM | 375 | ₹2,99,865 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 96.94 | CUM | 4,960.03 | ₹4,80,825.31 |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 18.21 | CUM | 1,546.37 | ₹28,159.4 |
| 7 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints,surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313 ( Part II 1981 ) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or chordancewill be used. The rate of application of chemical emulsion shallbe as follows : (1 Treatment for masonary & foundation 5 liters pe r/ 100 Sqm.(2) Back fill in immediate contact with foundation 7.5 liters / 100 Sqm. (3) Treatment of top surface of plinth filling 5 liters / 100 Sqm. (4)Treatment junction of wall and the floor 7.5 liters / 100 Sqm. (5)Treatment of soil along external perimeter of building 7.5liters / 10 Sqm.(6) Treatment of soil under apron along external perimter 5 liters / 100 Sqm. | 152.52 | SQM | 230 | ₹35,079.6 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). for lintel band | 15.76 | CUM | 8,377.51 | ₹1,32,029.56 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).for slab | 22.28 | CUM | 8,377.51 | ₹1,86,650.92 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). for beam | 3.06 | CUM | 8,377.51 | ₹25,635.18 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BID1.pdf
Tender Documents • 24.94 MB
BID2.pdf
Tender Documents • 0.42 MB
BOQ_2238394.xls
BOQ • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .