Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹80.1 L+₹7.8 L (10.9%)Admitted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | L2 | Admitted-Finance | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Others-Technically not suitable | |
| 4 | Not Admitted-Finance KARNATAKA | RAICHUR | KARNATAKA | 584123 | - | Not Admitted-Finance Others-Technically not suitable |
| Sl No | Description | Qty | Unit | Ramesh Enterprises L2 | AR ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Painting of structural members, pipelines and EOT cranes in Sponge production facility. The work includes Surface preparation and applying one coat of primer, two coats of Polyurethane paint on structures, pipelines, EOT cranes and chequered plates with DFT not less than 120micron The scope of work includes the supply of Polyurethane paint, primer, thinner, cleaning materials, tools, tackles and manpower for completing the job as required and directed by the Engineer in- charge. Note: 1) Vendors are advised to visit the site for accessing the work before quoting.
2) The rate shall include cost of material, consumable, labour, and other expenditure involved for finished item
3) Paint/Primer/Thinner should be Asian/Berger/Kansai Nerolac/Akzo Nobel make | 17,400 | Sqm | 360 ₹62,64,000 | 285 ₹49,59,000 Lowest |
| 2.00 | Painting of furnaces in Sponge production facility. The work includes Surface preparation and applying one coat of primer, two coats of heat resistance paint(up to 250 deg.C) on furnace surface with DFT not less than 120micron. The scope of work includes the supply of heat resistant paint, primer, thinner, cleaning materials, tools, tackles and manpower for completing the job as required and directed by the Engineer in- charge. Note: 1) Vendors are advised to visit the site for accessing the work before quoting.
2) The rate shall include cost of material, consumable, labour, and other expenditure involved for finished item
3) Paint/Primer/Thinner should be Asian/Berger/Kansai Nerolac/Akzo Nobel make | 2,100 | Sqm | 260 ₹5,46,000 Lowest | 285 ₹5,98,500 |
| 3.00 | Erection & de-erection of scaffolding at various locations of Sponge production facility, Zirconium Complex as per engineer in charge direction for painting work with supply of required scaffolding pipes, clamps, safety platform grills etc as per IS:4014(Part 1&2)-1967 and directed by the Engineer in- charge.
Note: 1) The rate shall include cost of material, consumable, labour, and other expenditure involved for finished item | 10,400 | Sqm | 115 ₹11,96,000 Lowest | 160 ₹16,64,000 |
Tender Value
₹98 L
EMD Value
₹2.0 L
Closing Date
16 Jul 2025, 3:00 pmClosed
General Manager, ZC
Zirconium Complex Pazhayakayal
Painting of Structural members, Pipelines, EOT cranes and furnaces in SPF, Zirconium Complex, Pazhayakayal - Tuticorin-628152
2025_NFC_865928_1
ZC/NFC/SPF/PAINTING/2025
Open Tender
Paint / Enamel Works
Works
730 days
Pazhayakayal
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.0 L
15 Sept 2025
27 Jun 2025
17 Jul 2025
27 Jun 2025
16 Jul 2025
27 Jun 2025
27 Jun 2025 - 28 Jun 2025
Amount
Painting of structural members, pipelines and EOT cranes in Sponge production facility. The work includes Surface preparation and applying one coat of primer, two coats of Polyurethane paint on structures, pipelines, EOT cranes and chequered plates with DFT not less than 120micron The scope of work includes the supply of Polyurethane paint, primer, thinner, cleaning materials, tools, tackles and manpower for completing the job as required and directed by the Engineer in- charge. Note: 1) Vendors are advised to visit the site for accessing the work before quoting. 2) The rate shall include cost of material, consumable, labour, and other expenditure involved for finished item 3) Paint/Primer/Thinner should be Asian/Berger/Kansai Nerolac/Akzo Nobel make
Painting of furnaces in Sponge production facility. The work includes Surface preparation and applying one coat of primer, two coats of heat resistance paint(up to 250 deg.C) on furnace surface with DFT not less than 120micron. The scope of work includes the supply of heat resistant paint, primer, thinner, cleaning materials, tools, tackles and manpower for completing the job as required and directed by the Engineer in- charge. Note: 1) Vendors are advised to visit the site for accessing the work before quoting. 2) The rate shall include cost of material, consumable, labour, and other expenditure involved for finished item 3) Paint/Primer/Thinner should be Asian/Berger/Kansai Nerolac/Akzo Nobel make
Erection & de-erection of scaffolding at various locations of Sponge production facility, Zirconium Complex as per engineer in charge direction for painting work with supply of required scaffolding pipes, clamps, safety platform grills etc as per IS:4014(Part 1&2)-1967 and directed by the Engineer in- charge. Note: 1) The rate shall include cost of material, consumable, labour, and other expenditure involved for finished item
Ramesh Enterprises (BID ID -3249464)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .