Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LAccepted-AOC | L1 | Accepted-AOC Lowest Tenderer | |
| 2 | L2₹37.2 L+₹72,969 (2.00%)Rejected-AOC | L2 | Rejected-AOC Second Lowest Tenderer |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
3 Oct 2024, 3:00 pmClosed
Superintending Engineer, PWD
O/o. The Superintending Engineer, PWD., Buildings Maintenance Circle, Chepauk, Chennai-5
Temporary Electrical Installations, Generator Sets, UPS and other facilities for Air Force Day Fly Past Celebrations on Rehearsal Days and on 06 October 2024 Air Force Day Parade at Marina Beach, Chennai
2024_PWD_488607_1
PWD/BMC/14/2024-25
Open Tender
Electrical Works
Lump-sum
30 days
Marina Beach
Refer Tender Condition
8 documents required · 8 mandatory
₹0
₹29,000
26 Mar 2025
27 Sept 2024
3 Oct 2024
27 Sept 2024
3 Oct 2024
27 Sept 2024
Amount
Hire and labour charges for supply and fixing of Pedestal fans with connection and with dismantling charges (2 days) Starting and Ending 2 Days
Hire and labour charges for maintenance of Pedestal fans with connection (5 days) Intermediate 5 Days
Hire and labour charges for supply and fixing of LED Parcan lightscomplete with connection and with dismantling charges (2days) (Starting and Ending 2 Days)
Hire and labour charges for maintenance of LED Parcan lightscomplete with connection (5days) (Intermediate 5 Days)
Hire and labour charges for supply and fixing of Dragon strobe complete with connection and with dismantling charges (2days) (Starting and Ending 2 Days),
Hire and labour charges for maintenance of Dragon strobe complete with connection and with dismantling charges (5days) (Intermediate5 Days)
Hire and labour charges for supply and fixing of T-Truss lights complete with connection and with dismantling charges (Starting and Ending 2 Days)
Hire and labour charges for maintenance of T-Truss lights complete with connection and with dismantling charges (Intermediate 5 Days)
Hire and labour charges for supply and fixing of Metal hallide lights complete with connection and with dismantling charges (7 Days)
Hire and labour charges for supply and fixing of General Metal lights complete with connection and with dismantling charges.( For Mobile Hospitals and Technical room) (40 nos 2 days) (Starting and Ending 2 Days)
Hire and labour charges for maintenance of General Metal lights complete with connection ( For Mobile Hospitals and Technical room) (40 nos 15days), (Intermediate 15 Days)
Hire and labour charges for supply and fixing of Tiger board with connection and with dismantling charges (2days) (Starting and Ending 2 Days),
Hire and labour charges for maintenance of Tiger board with connection (5days) (Intermediate 5 Days)
Hire and labour charges for supply and fixing of Tower AC 5 TR with connection and with dismantling charges .(7 Nos-2 days) (Starting and Ending 2 Days),
Hire and labour charges for maintenance of Tower AC 5 TR with connection .(7 Nos-5days) ( Intermediate 5 Days)
Hire and labour charges for supply and fixing of Tower AC 5 TR with connection and with dismantling charges .(4 Nos- 1 day)
Hiring Installation and Dismantling Charges - Cabling & Cabling Mat, Panel and change over switches (For 6 days)
Hire and labour charges for supply and erection of 250 KVA DG set complete with connection and with dismantling chargeswith back up (For lights,fan ,Ac, Mobile Hospital) (5 Nos 2days ) ( Starting and Ending 2 Days)
Hire and labour charges for maintenance of 250 KVA DG set complete with connection and with dismantling charges with back up (For lights,fan ,Ac, Mobile Hospital) (5 Nos 2 days ) ( Intermediate2 Days).
Hire and labour charges for supply and erection of 250 KVA DG set complete with connection and with dismantling chargeswith back up (For Ac, Mobile Hospital) (5 Nos 1 day) .
Hire and labour charges for supply and erection of 62.5 KVA DG set complete with connection and with dismantling charges for Technical room for (1 no 2days) ( Starting and Ending 2 days )
Hire and labour charges for maintenance of 62.5 KVA DG set complete with connection for Technical room for (1 no 2 days) ( Intermediate 2 days )
Hire and labour charges for supply and erection of 62.5 KVA DG set complete with connection and with dismantling charges for Hanger area (1 no 1 day)
Hire and labour charges for supply and erection of 125 KVA DG set complete with connection and with dismantling charges for for 2 days ( Starting and Ending 2 days )
Hire and labour charges for maintenance of 125 KVA DG set complete with connection and with dismantling charges for 15 days ( Intermediate 15 day )
Hire and labour charges for supply and erection of 30 KVA UPS with Technician- For 2 Days( Starting and Ending 2 days )
Hire and labour charges for maintenance of 30 KVA UPS with Technician- For 4Days ( Intermediate 4 days )
Hire and labour charges for supply and erection of 40 KVA UPS with Technician- For 2 Days( Starting and Ending 2 days )
Hire and labour charges for maintenance of 40 KVA UPS with Technician- For 2Days ( Intermediate 2 days )
Hire and labour charges for supply and erection of 50 KVA UPS with Technician- For 2 Days( Starting and Ending 2 days )
Hire and labour charges for maintenance of 50 KVA UPS with Technician- For 2 Days ( Intermediate 2 days )
Hire and labour charges for supply and fixing of 15A/5A Plug Board with necessary outgoing switches set complete with connection and with dismantling charges(For 2days)( Starting and Ending days )
Hire and labour charges for maintenance of 15A/5A Plug Board with necessary outgoing switches set complete with connection and with dismantling charges ( Intermediate 15 days )
Hire and labour charges for supply and fixing of 15A/5A Plug Board with necessary outgoing switches set complete with connection and with dismantling charges (For 2days) (Starting and Ending 2 days)
Hire and labour charges for maintenance of 15A/5A Plug Board with necessary outgoing switches set complete with connection ( Intermediate 4 days )
Cost of Diesel For 250 KVA Generator :5 Generators for 4 days and 5 geneartor for1 day, each generator operated for 12 Hrs
Cost of Diesel For 62.5 KVA Generator :1 geneartor for 4 days, 1 generator operated for 1 day , each generator operated for 12 Hrs
Cost of Diesel For 125VA Generator : 1 geneartor for 17 days, each generator operated for 12 hours
BHARAT CORP (BID ID -1154895)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_580676.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .