| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹6.0 LAccepted-Finance | ₹6.0 L | l1 | Accepted-Finance Lowest 1 |
| 2 | l2₹7.8 L+₹1.8 L (29.5%)Accepted-Finance | ₹7.8 L+₹1.8 L (29.5%) | l2 | Accepted-Finance Lowest 2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Annexure B not uploaded |
| Sl No | Description | Qty | Unit | M/s Thongdrol Enterprise L1 | M/s Rongsar Enterprises L2 |
|---|---|---|---|---|---|
| 1.00Sub heads and Items of Work | |||||
| 2.00 | Earth work in excavation in foundation and
trenches etc. in all kinds of soil . | 67.02 | Cum | 13,404 ₹13,404 Lowest | 31,394.85 ₹31,394.85 |
| 3.00 | Providing and laying C.C 1:4:8 (1 cement :
4 coarse sand : 8 graded stone aggregate
40 mm nominal size) excluding the cost of
centring and shuttering . | 10.31 | Cum | 36,085 ₹36,085 Lowest | 70,770.31 ₹70,770.31 |
| 4.00 | Providing and laying C.C 1:3:8 (1 cement :
3 coarse sand : 6 graded stone aggregate
40 mm nominal size) excluding the cost of
centring and shuttering . | 32.04 | Cum | 1,44,180 ₹1,44,180 Lowest | 2,26,888.06 ₹2,26,888.06 |
| 5.00 | Centering and shuttering including, strutting
propping etc and removal of form work. | 368.25 | Sqm | 1,28,887.5 ₹1,28,887.5 Lowest | 2,74,173.17 ₹2,74,173.17 |
| 6.00 | 12 mm Cement Plaster 1:4 | 279.87 | Sqm | 83,961 ₹83,961 | 66,564.28 ₹66,564.28 Lowest |
| 7.00 | Carriage for Cement / Steel and other Engg materials from Likabali to nearest road side of work site by mechanical means lead = 439.00 km | 10.33 | /MT/KG | 10,330 ₹10,330 | 6,943.31 ₹6,943.31 Lowest |
| 8.00 | Carriage for Sand / shingle/ aggregate from nearest quarry to work site by tractor lead = 25.00 km | 147.6 | /MT/KG | 1,84,500 ₹1,84,500 | 1,02,266.14 ₹1,02,266.14 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
22 Jul 2026, 6:55 pmClosed
Deputy Director Rural Development Yingkiong
Office of Deputy Director Rural Development Yingkiong
CONSTRUCTION OF DRAIN / GUTTERS WITHIN THE VILLAGE TASHIGAON
2026_DRDAP_3515_8
No. YRD/VVP/2025-26/NIT
Open Tender
Civil Works
Item Rate
180 days
Tashigong
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Payable To Deputy Director, Rural Development Depa
₹10,000
1 Aug 2026
15 Jul 2026
23 Jul 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub heads and Items of Work | - | - | - | - |
| 2 | Earth work in excavation in foundation and
trenches etc. in all kinds of soil . | 67.02 | Cum | - | - |
| 3 | Providing and laying C.C 1:4:8 (1 cement :
4 coarse sand : 8 graded stone aggregate
40 mm nominal size) excluding the cost of
centring and shuttering . | 10.31 | Cum | 65 | ₹670.15 |
| 4 | Providing and laying C.C 1:3:8 (1 cement :
3 coarse sand : 6 graded stone aggregate
40 mm nominal size) excluding the cost of
centring and shuttering . | 32.04 | Cum | 65 | ₹2,082.6 |
| 5 | Centering and shuttering including, strutting
propping etc and removal of form work. | 368.25 | Sqm | 65 | ₹23,936.25 |
| 6 | 12 mm Cement Plaster 1:4 | 279.87 | Sqm | 65 | ₹18,191.55 |
| 7 | Carriage for Cement / Steel and other Engg materials from Likabali to nearest road side of work site by mechanical means lead = 439.00 km | 10.33 | /MT/KG | 75 | ₹774.75 |
| 8 | Carriage for Sand / shingle/ aggregate from nearest quarry to work site by tractor lead = 25.00 km | 147.6 | /MT/KG | 75 | ₹11,070 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_3747.xls
BOQ • 0.34 MB
pkg8.pdf
Tender Documents • 20.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .