Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.4 LAdmitted-Fee/PreQual/Technical/Finance | -36.99% | ₹21.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹21.7 L+₹33,588.52 (1.57%)Admitted-Fee/PreQual/Technical/Finance | -36.00% | ₹21.7 L+₹33,588.52 (1.57%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹21.8 L+₹43,766.86 (2.05%)Admitted-Fee/PreQual/Technical/Finance | -35.70% | ₹21.8 L+₹43,766.86 (2.05%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹22.1 L+₹67,855.60 (3.17%)Admitted-Fee/PreQual/Technical/Finance | -34.99% | ₹22.1 L+₹67,855.60 (3.17%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹22.5 L+₹1.2 L (5.48%)Admitted-Fee/PreQual/Technical/Finance | -33.54% | ₹22.5 L+₹1.2 L (5.48%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33.9 L
EMD Value
₹67,860
Closing Date
20 Apr 2026, 4:00 pmClosed
Executive Engineer Left River Works Division
Office of Executive Engineer LRWD, SMC at Old Funds office Building Karan Nagar near National School Municipal Park
Renovation of Hussaini Park at Parrey Mohalla Gund Hassi Bhat
2026_HAUDD_307821_14
E-T No. 01 of 2026-2027 LRWD SMC
Open Tender
Civil Works
Percentage
20 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Yes
Municipal Account 0216010200000007
₹67,860
Yes
30 Apr 2026
13 Apr 2026
21 Apr 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Engagement of labourers for clearance of site etc. | |||||
| 2 | Dismantling steel work manually/by mechanical means in built up
sections without dismembering and stacking within 50 meters lead as per direction of Engineer-in-charge:.Note:-The cost of dismantled material (scrap) shall be deducted in the bill) | 1 | KG | 1 | ₹1 |
| 3Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar Note:-The cost of dismantled material shall be deducted in the bill) | |||||
| 4Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar Note:-The cost of dismantled material shall be deducted in the bill) | |||||
| 5Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (1 meter from cutting edge ) All kinds of soil | |||||
| 6 | Providing and laying stone soling/ hand packed (above 75 mm) including all sorts of carriages by all means of transport upto site of work complete job . | 1 | CUM | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | CUM | 1 | ₹1 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | CUM | 1 | - |
| 9Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level complete job including all carriages complete job.(TMT Bars) | |||||
| 10Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | |||||
stage.html
html • 0.04 MB
finance_998325.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_998325.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .