Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹50.6 L
EMD Value
₹63,300
Closing Date
16 Nov 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EnM)
Area Engineer(EnM), Sodepur Area
Repairing of Headgear Structure of PIT No.02 of Chinakuri Mine-I Colliery under Sodepur Area
2024_ECL_320114_1
ECL/SDPA/AE(EnM)/e-T/24-25/898 Dated.28.10.2024
Open Tender
Miscellaneous Works
Item Rate
90 days
Sodepur Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹63,300
4 Feb 2025
28 Oct 2024
18 Nov 2024
28 Oct 2024
16 Nov 2024
28 Oct 2024
28 Oct 2024 - 5 Nov 2024
Amount
Items Description
Repairing of Headgear Structure of PIT No.02 of Chinakuri Mine-I Colliery under Sodepur Area
Dismantling and lowering old and damaged side plates, channels and angles of headgear pulley platform.( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
Fabrication and lifting new side plates, channels and angles of headgear pulley platform.(Requirement of Manpower category wise: Highly Skilled-05 nos., Skilled-05 nos. and Semi Skilled-50 for 05 shift)
Headgear pulley platform fabrication and alignment of headgear pulley guarder maintaining required fleet angle ( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
Dismantling of old and damaged fencing of the headgear pulley platform and erection/ fabrication of fresh fencing.( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
Anchoring of four guide ropes (opposite to the winding engine room side) by placing guarder and clamps on it as well as on headgear pulley platform.( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
De-clamping of the guide rope from guide rope platform.(Requirement of Manpower category wise: Highly Skilled-05 nos., Skilled-05 nos. and Semi Skilled-50 for 05 shift)
Dismantling and lowering of old bell plate guarder from platform/ guide rope platform.(Requirement of Manpower category wise: Highly Skilled-03 nos., Skilled-03 nos. and Semi Skilled-30 for 03 shift)
Dismantling and lowering of guide rope guarder and the remaining part the bell plate/ guide rope platform. ( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
Fabrication of scaffolding platform with suitable ladderway for safe work at height. ( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
Dismantling and lowering of guide rope guarder rest platform from four side. ( Requirement of Manpower category wise: Highly Skilled-06 nos., Skilled-06 nos. and Semi Skilled-60 for 06 shift )
Fabrication, lifting and installation of guide rope guarder rest platform from four side.( Requirement of Manpower category wise: Highly Skilled-12 nos., Skilled-12 nos. and Semi Skilled-120 for 12 shift )
Lifting and installation 4nos. guide rope guarder, 2nos. bell plate guarder and covering platform.( Requirement of Manpower category wise: Highly Skilled-14 nos., Skilled-14 nos. and Semi Skilled-140 for 14 shift )
Dismantling of guide rope platform back stay side beam/ member.( Requirement of Manpower category wise: Highly Skilled-05 nos., Skilled-05 nos. and Semi Skilled-50 for 5 shift )
Fabrication, lifting and installation of guide rope platform back stay side beam/ member.( Requirement of Manpower category wise: Highly Skilled-10 nos., Skilled-10 nos. and Semi Skilled-100 for 10 shift )
Dismantling and lowering of 6nos. of truss member and 12nos. of cross members.( Requirement of Manpower category wise: Highly Skilled-14 nos., Skilled-14 nos. and Semi Skilled-140 for 14 shift )
Fabrication, lifting and installation of 6nos. of truss member and 12nos. of cross members by pneumatic riveting/ machine riveting.( Requirement of Manpower category wise: Highly Skilled-26 nos., Skilled-26 nos. and Semi Skilled-260 for 26 shift )
Clamping 4nos. guide rope with guide rope platform guarder and release from pulley platform.( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
Installation of 2nos. of guide ropes and clamping with guide rope guarder.( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
Lowering and replacement of 2nos. of guide ropes.( Requirement of Manpower category wise: Highly Skilled-10 nos., Skilled-10 nos. and Semi Skilled-120 for 12 shift )
Replacement of 2nos. of winding ropes.( Requirement of Manpower category wise: Highly Skilled-05 nos., Skilled-05 nos. and Semi Skilled-60 for 05 shift )
Removal of existing Air lock.( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
Fabrication and installation of 2nos. Air locks.( Requirement of Manpower category wise: Highly Skilled-26 nos., Skilled-26 nos. and Semi Skilled-208 for 26 shift )
Both side fencing of both the ladder, from pit top to guide rope platform and from guide rope platform to headgear pulley platform.( Requirement of Manpower category wise: Highly Skilled-10 nos., Skilled-10 nos. and Semi Skilled-100 for 10 shift )
Cutting 6mm plate 10/5ft and banding and cutting 3nos. flat 25mm size 10ft length banding horns punching hole and fixing with rivet.( Requirement of Manpower category wise: Highly Skilled-07 nos., Skilled-07 nos. and Semi Skilled-70 for 10 shift )
Dismantle tandan cage and lowering winding rope pit top to pit bottom.( Requirement of Manpower category wise: Highly Skilled-03 nos., Skilled-03 nos. and Semi Skilled-30 for 03 shift )
Lowering bucket pit top to pit bottom and manually transporting pit bottom 2pit to pit bottom 1pit and suspension gear 3nos and installation bucket to winding rope.( Requirement of Manpower category wise: Highly Skilled-04 nos., Skilled-04 nos. and Semi Skilled-40 for 04 shift )
Rivet 5/8 Size
HT Nut and Bolt 3/4 X 3"
Welding Rod LT 011
DA Cylinder
Oxygen Cylinder
White Metal
Binding wire
overhead cost and others
Total impact of GST for the purpose of CTC
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .