| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | ₹14.2 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹15.0 L+₹86,390.77 (6.09%)Rejected-AOC | ₹15.0 L+₹86,390.77 (6.09%) | L2 | Rejected-AOC Highest Rate |
| 3 | L3₹15.7 L+₹1.5 L (10.8%)Rejected-Finance | ₹15.7 L+₹1.5 L (10.8%) | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | adhiyaninfra L1 | Aaruthra Construction L2 | AALAMUDAIYAAR CONSTRUCTIONS PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of 30000 litre OHT ( 12 M stage ) at west street and Extension of pipe line 110 M in Umarikottai Village and Panchayat. | ||||||
| 2.00Earth work excavation and depositing on bank with initial lead 10m and lift of 2.0m in the following classification of soils, bailing out water wherever necessary including providing danger lights etc., and as directed as per specification SS 20B and special specification. in Hard rock Rock requiring blasting as per standard specifications and as directed by the Engineer. | ||||||
| 3.00 | First depth of 2m for column foundation | 60.5 | Cubic Meter | 210.78 ₹12,752.19 Lowest | 250 ₹15,125 | 263 ₹15,911.5 |
| 4.00 | Second depth of 2m for column foundation | 18.15 | Cubic Meter | 219.78 ₹3,989.01 Lowest | 260 ₹4,719 | 274 ₹4,973.1 |
| 5.00Sand filling for foundation with river sand including consolidation ramming etc. complete as per standard specifications and as directed by the Engineer-incharge | ||||||
| 6.00 | a) for column foundation | 9.08 | Cubic Meter | 1,437.3 ₹13,050.68 Lowest | 1,995 ₹18,114.6 | 2,092 ₹18,995.36 |
| 7.00Plain Cement concrete 1:4:8 (one cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc., complete and as directed for works beyond 1.50m and upto 4.50m depth below ground level. | ||||||
| 8.00 | a) for column foundation | 9.08 | Cubic Meter | 4,443.3 ₹40,345.16 Lowest | 5,822 ₹52,863.76 | 5,727 ₹52,001.16 |
| 9.00RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., | ||||||
| 10.00 | (i) below 1.50m to 4.50m depth from G.L for Footing | 13.52 | Cubic Meter | 7,797.24 ₹1,05,418.68 Lowest | 8,150 ₹1,10,188 | 9,862 ₹1,33,334.24 |
Tender Value
₹17.1 L
EMD Value
₹17,100
Closing Date
22 Jul 2026, 3:00 pmClosed
Special Officer, Umarikottai Panchayat
Panchayat Union Thoothukudi
Construction of 30000 litre capacity OHT ( 12 M stage ) at West street and EPL 110 M in Umarikottai village and panchayat. (Source Existing Borewell and Openwell in Umarikottai)
2026_RDTN_682642_1
UMARI/04/2026-27 Dt 24.06.2026
Open Tender
Civil Works - Water Works
Item Rate
120 days
Panchayat Union Thoothukudi
Technical Qualification
3 documents required · 3 mandatory
₹0
₹17,100
Yes
Panchayat Union Thoothukudi
10 Sept 2026
24 Jun 2026
22 Jul 2026
24 Jun 2026
22 Jul 2026
24 Jun 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 30000 litre OHT ( 12 M stage ) at west street and Extension of pipe line 110 M in Umarikottai Village and Panchayat. | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead 10m and lift of 2.0m in the following classification of soils, bailing out water wherever necessary including providing danger lights etc., and as directed as per specification SS 20B and special specification. in Hard rock Rock requiring blasting as per standard specifications and as directed by the Engineer. | - | - | - | - |
| 3 | First depth of 2m for column foundation | 60.5 | Cubic Meter | - | - |
| 4 | Second depth of 2m for column foundation | 18.15 | Cubic Meter | - | - |
| 5 | Sand filling for foundation with river sand including consolidation ramming etc. complete as per standard specifications and as directed by the Engineer-incharge | - | - | - | - |
| 6 | a) for column foundation | 9.08 | Cubic Meter | - | - |
| 7 | Plain Cement concrete 1:4:8 (one cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc., complete and as directed for works beyond 1.50m and upto 4.50m depth below ground level. | - | - | - | - |
| 8 | a) for column foundation | 9.08 | Cubic Meter | - | - |
| 9 | RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., | - | - | - | - |
| 10 | (i) below 1.50m to 4.50m depth from G.L for Footing | 13.52 | Cubic Meter | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_820587.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_820587.xls
BOQ • 0.30 MB
Techbit.pdf
Tender Documents • 1.02 MB
UmOHTEPL.pdf
Additional Documents • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .